This Statement of Work outlines a three-year Enterprise Agreement between the State Water Resources Control Board (Water Boards) and Environmental Systems Research Institute, Inc. (ESRI) for GIS technology services. The contract term runs from November 1, 2024, through October 31, 2027, and includes comprehensive ESRI software licensing, maintenance, and support services. The services will be performed remotely or onsite at Water Boards in Sacramento, with standard service hours from 8:00 AM to 6:00 PM PT Monday through Friday. The agreement includes uncapped quantities for various ArcGIS Enterprise products and specific capped quantities for certain perpetual and annual subscription products, including 35,000 Contributor User licenses for the California water rights system.

The current Water Boards technology architecture operates on VMware hardware, Oracle 19c DBMS, and Windows 11 client operating system. The contract requires specific service response times ranging from two hours for fatal conditions to same-day response for minimal issues. The agreement includes comprehensive software support, system upgrades, bug fixes, and patches for the Water Boards' ArcGIS implementation. The contractor must maintain detailed call reporting and resolution logs, provide their own equipment when working onsite, and adhere to Water Boards' IT security policies. No specific pricing information is provided in the document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ESRI Enterprise Agreement BU 3940 Event ID 0000033425 Attachment 1- Statement of Work

Attachment 1 Statement of Work

1. Service Overview

A. The Contractor (Contractor) agrees to provide to the State Water Resources Control Board (Water Boards) services as described herein.

B. The services shall be performed remotely or onsite at Water Boards, 1001 I Street, 8th Floor, Sacramento, CA 95814.

C. The services shall be provided between the hours of 8:00 a.m. to 6:00 p.m. Pacific Time (PT), Monday through Friday, excluding state and federal holidays. The Contractor shall respond within the time stated in Section six (6). However, the Contractor may be required to perform system updates, production support, or maintenance tasks on weekends or before/after business hours. In the case of emergency situations that arise outside of the Contractor’s regular support hours (Monday through Friday 8:00 a.m. to 6:00 p.m. PT), the Water Boards will call the Environmental Systems Research Institute, Inc. (ESRI) technical support at (888) 377-4575 for assistance within the timeframes specified in Section six (6).

D. The Project Representatives during the term of this contract shall be:

State Water Resources Control Board
Contractor: TBD
Section/Unit: Division of Information Technology (DIT)
Section/Unit: TBD
Attention: Jeff Kapellas
Attention: TBD

Address: 1001 I Street, 8th Floor Sacramento, CA 95814 Address: TBD

Phone: (916) 341-5235
Phone: TBD
Email: Jeff.Kapellas@waterboards.ca.gov
E-mail: TBD

The parties may change their Project Representative upon providing ten (10) business days written notice to the other party. Said changes shall not require a purchase order change or amendment to this contract.

2. Contract Term

The term of this contract will be effective November 1, 2024, through October 31, 2027.

3. Current Water Boards Technology Architecture Specifications

The objective of this effort is to purchase a three (3) year ESRI enterprise agreement including all listed software and maintenance services. The Water Boards uses Geographic Information System (GIS) technology to support core organizational missions including water quality, water rights and environmental protection.

Technical Area
ESRI ArcGIS Enterprise
Hardware
VMWare
Database Management System (DBMS)
Oracle 19c
Application Software
ArcGIS Enterprise, AGOL, ArcGIS portal
Application Language
JavaScript
Web Application Server
Microsoft IIS
Client Operating System
Windows 11
Data Structure
Standard relational database management system. The database utilizes a common data dictionary, commonly defined relationships, attributes and keys, common field layouts, common indexing, and archival methodology for documents/files.
Network Protocols
Ethernet
Transport Protocols
Transmission Control Protocol (TCP)/ Internet Protocol (IP)
Required Up Time
The system/application must be available Monday through Friday, 8:00 a.m. to 6:00 p.m.

4. Software Licenses

Below is the list of software included in this contract for maintenance and support:

EA Products— Uncapped Quantities

Product
Total
ArcGIS Enterprise: ArcGIS Enterprise (Advanced and Standard)
Uncapped

ArcGIS Enterprise Extensions: ArcGIS 3D Analyst, ArcGIS Data Reviewer, ArcGIS Geostatistical Analyst, ArcGIS Network Analyst, ArcGIS Schematics, and ArcGIS Spatial Analyst

Uncapped

ArcGIS GIS Server: Advanced, Standard, Basic
Uncapped
ArcGIS Enterprise Additional Capability Servers: ArcGIS Image Server, ArcGIS GeoEvent Server
Uncapped
ArcGIS Monitor
Uncapped
ArcGIS Runtime Advanced
Uncapped
ArcGIS Runtime Analysis Extension
Uncapped
ArcGIS Desktop: Advanced, Standard, and Basic (Single and Concurrent Use)
Uncapped

ArcGIS Desktop Extensions: ArcGIS 3D Analyst, ArcGIS Data Reviewer, ArcGIS Geostatistical Analyst, ArcGIS Network Analyst, ArcGIS Publisher, ArcGIS Schematics, ArcGIS Spatial Analyst, and ArcGIS Workflow Manager (Single and Concurrent Use)

Uncapped

EA Products—Capped Quantities

Perpetual Products
Rolled-In Qty. (if applicable)
Qty. to Be Deployed
Total
ArcGIS Workflow Manager Server Advanced Up to Four Cores
1
0
1
ArcGIS Workflow Manager Server Advanced Up to Four Cores Staging Server
1
0
1
Annual Subscription Products
Term 1
Term 2
Term 3

ArcGIS StreetMap Premium Enterprise Full Use USA State Up to Four Cores Annual Subscription (California)

ArcGIS Developer Bundle
1
1
1
User Type Products
Term 1
Term 2
Term 3
ArcGIS Enterprise
(number of Users per Term)
ArcGIS Enterprise Contributor (formerly Editor) User Type Annual Subscription
30
30
30
ArcGIS Enterprise Mobile Worker User Type Annual Subscription*
75
75
75
ArcGIS Enterprise Creator User Type Annual Subscription*
550
550
550
ArcGIS Enterprise Professional Plus (formerly Advanced) User Type Annual Subscription*
100
100
100

3D Analyst for ArcGIS Pro (Add-on App) for ArcGIS Enterprise Creator or GIS Professional User Type Annual Subscription

Geostatistical Analyst for ArcGIS Pro (Add-on App) for ArcGIS Enterprise Creator or GIS Professional User Type Annual Subscription

Network Analyst for ArcGIS Pro (Add-on App) for ArcGIS Enterprise Creator or GIS Professional User Type Annual Subscription

Spatial Analyst for ArcGIS Pro (Add-on App) for ArcGIS Enterprise Creator or GIS Professional User Type Annual Subscription

Location Sharing User Type Extension for ArcGIS Enterprise Annual Subscription
25
25
25

ArcGIS Enterprise Contributor (formerly Editor) User Type Annual Subscription

The Contributor User Types are offered at a special price and are limited to use for external users related to the California water rights system

35,000

ArcGIS Online (1 Organizational Subscription)
(number of Users per Term)
ArcGIS Online Viewer User Type Annual Subscription*
100
100
100

ArcGIS Online Mobile Worker User Type Annual Subscription* (250 credits per user)

100
100
100

ArcGIS Online Creator User Type Annual Subscription* (500 credits per user)

100
100
100
ArcGIS Location Sharing User Type Extension for ArcGIS Online Annual Subscription
75
75
75
Additional Service Credits – Block of 1,000
65
65
65
ArcGIS Drone2Map Advanced for ArcGIS Online Annual Subscription
10
10
10

Site Scan for ArcGIS Custom 1 Year License (not to exceed 100,000 Images per year) Initial user access will include Site Scan Single Operator Annual Subscription License - Qty. 20 Site Scan Single Access Annual Subscription License - Qty. 100 – These licenses can be increased upon request through the Esri internal Site Scan Admin Portal.

5. Work To Be Performed

The objective of this effort is to provide enterprise licensing and maintenance support for the Water Boards’ ArcGIS.

Task Group A – Ongoing system support, upgrades, bug fixes, and patches of the Water Boards’ ArcGIS.

Includes, but is not limited to, software upgrades, software patches, system administration issues, user accounts and servers. The DIT Project Representative shall report technical issues through the Contractor’s issue-reporting system. The Contractor’s system shall notify the Water Boards through email when these new work items are created. All other communication regarding requested maintenance, including but not limited to status updates, solution descriptions, requests for approval, and approvals, shall be provided in writing.

T.A.1
Provide software and system upgrades and patches for critical system maintenance (including mandatory proactive application changes necessary to avoid service interruptions, security issues, system performance, and/or production issues) approved by the DIT Project Representative.
T.A.2
Upon receipt of issue notification, the Contractor shall log in to their ticketing system to review the requested maintenance.
T.A.3
The Contractor shall review the maintenance issue and develop a solution that identifies how the issue shall be addressed.
T.A.4
The Contractor shall request approval from the DIT Project Representative to proceed with their solution. This request shall include all requirements needed to implement the solution and the approach for implementing the solution.
T.A.5
The Contractor shall have approval from the DIT Project Representative before implementing a solution.
T.A.6
The Contractor shall then test and/or validate that the issue has been correctly addressed and notify the DIT Project Representative that the maintenance issue has been resolved.
T.A.7
If the DIT Project Representative agrees that the issue has been appropriately addressed, then the maintenance issue shall be considered completed and noted as such in the tracking system.
T.A.8
The Contractor shall provide primary support for the Water Boards. When requested by the Water Boards, the Contractor shall escalate to ESRI any issues the Water Boards may experience with ArcGIS.
T.A.9
Support services shall be for the maintenance and installation of all purchased products.
T.A.10
The Contractor shall communicate information on new software upgrades in a timely manner and make available to the Water Boards the most current releases and versions of ArcGIS software, including any fixes, patches, or workaround products.

6. Service Response Times

The Contractor shall respond to incidents according to the following timeframes:

A. Level 1: Fatal condition which prevents staff from doing their work or destroys and/or corrupts data. No workaround is available. The Contractor shall respond within two (2) hours of receipt of a report.

B. Level 2: A reproducible error which substantially impacts production tasks, but for which an operational workaround, acceptable for the short term, but unacceptable for the long term, may be employed. The Contractor shall respond within four (4) hours of receipt of a report.

C. Level 3: Condition that causes minimal or cosmetic deficiencies. Work-around is acceptable. The Contractor shall respond within the same business day of receipt of a report.

7. Contractor Responsibilities

A. The Contractor shall be required to work remotely or onsite as needed at the Sacramento office of the Water Boards (1001 I Street in Sacramento, California) cooperatively and of a larger team of support the Water Boards’ program staff. The Contractor shall provide support during system updates, which may be done on weekends or before/after standard business hours.

B. The Contractor shall adhere to the Water Boards’ Information Technology security, internet, and network policies.

C. The Contractor shall certify that it has appropriate systems and controls in place to ensure that Water Boards’ funds will not be used in the performance of this contract for the acquisition, operation, or maintenance of computer software in violation of copyright laws.

D. The Contractor shall provide their own laptop computer if working onsite. The Contractor shall ensure that all personal computers, laptops, and devices used to access the Water Boards’ network are up to date with all the necessary operating system patches, antivirus updates, and virus definitions.

E. The Contractor shall document all work items in their issue tracking system (issues, notes, requirements, documents, and deliverables) and in a report specified and approved by the DIT Project Representative.

F. The Water Boards recognize that a resignation, or other such event, may cause Contractor team members to not be available for the duration of this contract. If this event should occur, the Contractor shall not replace any project team members without first receiving written approval from the DIT Project Representative.

G. The Contractor shall not be allowed extra time or money to replace personnel.

H. Shortage of Contractor personnel shall not relieve the Contractor from completing Contract tasks to the satisfaction of the Water Boards and within Contract timelines.

I. The Contractor shall supervise all Contractor’s project personnel, and the Contractor shall mitigate any Contractor personnel issues. The Contractor shall be responsible for the quality of service delivered to the Water Boards by any temporary backup personnel or permanent replacement personnel on the project team.

J. The Contractor shall return support calls on a same-day basis.

K. The Contractor shall maintain a detailed call reporting and resolution log (description of issue, date of resolution) accessible by Water Boards staff.

L. The Contractor must comply with the Water Boards Information Security clauses/policies and the Water Boards' network policy as outlined in Exhibit C.

M. The Contractor must review and comply with Exhibit B - Special Terms and Conditions.

8. Installation Requirements and Testing Procedures

The software shall be upgraded and installed by the Water Boards staff following established standard operating procedures. Testing shall be performed by the Water Boards’ ArcGIS team prior to approval by the DIT Project Representative.

9. Acceptance Process

The acceptance criteria shall consist of the following:

A. All tasks shall be performed in close coordination and approval of the DIT Project Representative.

B. All completed tasks shall be subject to ten (10) business days of testing and acceptance tracked by the DIT Project Representative.

C. If a completed task is not accepted, the Water Boards shall provide the rationale in writing within ten (10) business days of receipt of the completed task.

D. The Contractor shall submit revised services and/or work products within ten (10) business days of receipt of notification for Water Boards acceptance and approval.

E. All documentation shall be in a format that can be used by the Water Boards, as specified by the DIT Project Representative.

10. Water Boards’ Responsibilities

It is the Water Boards’ responsibility to provide:

A. Access to business and technical documents as necessary for the Contractor to complete tasks identified in this Scope of Work (SOW).

B. Remote access to the Water Boards’ network.

C. Subject Matter Experts for the Contractor.

D. A DIT Project Representative.