Attachment 1 - Statement of Work Cold Storage.pdf
PDF 4 MB Posted
- Attached to
- Cold Storage Metal Building Federal contract opportunity
- Solicitation number
- 12805B22Q0358
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Statement of Work Cold Storage.pdf | ||
| Mod 2 - Solicitation 12805B22Q0358.pdf | ||
| Mod 1 - Solicitation 12805B22Q0358.pdf | ||
| Attachment 3 - ARS-371.pdf | ||
| Attachment 4 - ARS-372.pdf | ||
| Attachment 2 - Wage Determination.pdf | ||
| RFQ - 12805B22Q0358.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Project: Cold Storage Building Location: 1616 Albrecht Blvd N, Fargo ND Section 36, Reed Township, Cass County, ND
GENERAL INFORMATION
1.0 Scope of Work: This project will erect a 40’X40’ metal building. The metal building will have 1 10’X10’ garage door, one access door, four (4) 3’X2’ windows, two (2) three-way light switches, electrical outlets, and 6 LED high bay lights.
2.0 Background: This will replace a similar size building demolished due to fire used for cold storage of facility equipment.
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks
A. Provide all material and labor to design and install a 40’ X 40’ metal building located on the North side of the UDSA Edward T. Schafer Agricultural Research Center Biological Research Laboratory (BRL) property.
a. Assemble 40’ X 40’ metal building
b. Install four (4) 3’ X 2’ windows, one (1) 10’ X 10’ garage door, one (1) electric garage door opener and one (1) standard hollow core access door.
B. Electrical -- Provide all material and labor to install outlets, light fixtures, and power to garage door opener.
a. Install 6 LED high bay lights
b. Wire and install electrical outlets, power to light fixtures.
c. Connect electrical supply to existing electrical panel.
d. Install and connect two (2) 3-way light switches by access door and garage door.
C. Provide all necessary permits from the City of Fargo or other entities.
D. Test the installed system with the owner present.
E. Provide all documentation in both hard copy and digital formats. Documentation to include:
a. Material submittals
b. Equipment Operation and Maintenance Manuals
c. Warranty Information – both labor and material
4.0 Government Furnished:
A. Square D panel board with available circuits inside Building 3.
B. Empty conduit available from inside building 3 to a junction box in between the building and the outdoor refrigeration units.
C. 40’ X 40’ concrete pad furnished.
5.0 Deliverables / Schedule:
Item No.
Deliverable
Objective
Due
1 Material Submittals Provide all material submittals and warranty information to the government for review.
30 days after notice to proceed.
2 Construct building Complete the construction of the metal building
45 days after notice to proceed.
3 Final walk-through Provide walk-through of building, manuals and warranty information
Immediately (next day) following construction.
6.0 Travel: Not Applicable.
7.0 Contractor’s Key Personnel:
A. Provide key employees names and credentials.
8.0 Security Requirements: All personnel shall have a U.S. photo ID, such as U.S.
Driver’s License or a U.S. passport.
9.0 Data Rights: Not applicable.
10.0 Section 508 – Electronic and Information Technology Standards: As-built drawings and submittals will be in Adobe file format.
11.0 Period of Performance: Performance period for this project is 125 days.
Addendum: Drawings – Existing conditions and basis for design details below.
Location of Cold Storage existing Pad.
| Statement of Work Cold Storage |
| Pad and Conduit |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
File details come from the government source that posted it. Updated .