Attachment 1 - Statement of Work - Blaine K9 Kenneling.pdf
PDF 87 KB Posted
- Attached to
- Blaine Canine Kenneling Federal contract opportunity
- Solicitation number
- 70B03C20Q00000256
About this file
This solicitation seeks proposals for kenneling services to support the U.S. Customs and Border Protection Canine Enforcement Program located in Blaine, Washington. Offerors must provide facilities and services within 30 miles of the CBP office to house up to 12 canines. The base period of performance is one year starting in September 2020 with three one-year option periods. Services include daily care, feeding, exercise, sanitation, record keeping, and emergency veterinary services for 8-12 working canines. Proposals are due by July 31, 2020 and must remain valid for 90 days. The evaluation will consider technical approach, past performance, and price. Pricing should be provided for the base year and option periods using the attached sheet. The award will be made to the best value offer based on technical superiority being more important than past performance, which is more important than price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 5 - Questions and Answers 8-11.pdf | ||
| Attachment 5 - Questions and Answers 8-10.pdf | ||
| Attachment 5 - Questions and Answers 8-7.pdf | ||
| Attachment 2 - Proposal Pricing Sheet.xlsx | XLSX spreadsheet | |
| Attachment 3 - Applicable Clauses and Provisions.pdf | ||
| Attachment 4 - Wage Determination Whatcom County 2015-5523 v10.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW – OFO Area Port of Blaine K9 Kenneling Services Page 1 of 12
Statement of Work (SOW) U.S. Customs and Border Protection (CBP)
Office of Field Operations (OFO) Area Port of Blaine K9 Kenneling Services
1. OBJECTIVE:
The purpose of this procurement is to obtain commercial kennel facilities and services that will most effectively support the U.S. Customs and Border Protection (CBP), Office of Field Operations (OFO) Canine Enforcement Program and the mission of CBP.
2. SCOPE OF WORK:
It is the intent of CBP to establish a Purchase Order with a canine kenneling facility in the Blaine, Washington area, specifically within thirty (30) miles by road one-way departing from the designated Government offices as indicated in Section eight (8) of this SOW. (Distances will be calculated based on the shortest route indicated on Google Maps). The contractor shall provide all of the labor, materials, supervision, and facilities necessary to satisfy the kenneling requirements of CBP’s Canine Enforcement Program location at the Area Port of Blaine as specified in this SOW.
The number of canines that require kenneling and care shall be as follows:
1. Eight (8) Active Kennels
2. Four (4) Inactive Kennels
Active kennels shall require the full services and requirements of this Statement of Work (SOW), from award of contract. Inactive Kennels shall remain empty until activated by CBP. No action shall be required of the inactive kennels while not holding canines, other than to remain open pending CBP usage.
For the purposes of this contract, the contractor shall be able to provide kenneling services to accommodate a maximum of 12 canines. The number of canines is subject to change depending on the needs and requirements of CBP. It is anticipated that only eight (8) active kennels will be utilized through the first 12-months of contract performance, at which time additional kennels shall be added as needed, for a maximum of 12 kennels. At no time shall fewer than eight (8) active kennels be required.
3. APPLICABLE DOCUMENTS:
• The contractor shall comply with all Federal Occupational Safety and Health Administration (OSHA), Environmental Protection Agency (EPA), State, and Local Laws, directives, regulations, ordinances, codes, and other orders as applicable to this type of service.
• Commercial standards shall be utilized.
• The contractor shall hold and maintain applicable licenses and permits throughout the duration of the contract.
SOW – OFO Area Port of Blaine K9 Kenneling Services Page 2 of 12
4. SPECIFIC TASKS:
4A. General Requirements:
4A.1 Accessibility: All kenneled canines must be accessible and retrievable for duty 24 hours a day, 7 days a week. Regardless of the time of day, a CBP Canine Enforcement Officer, (CEO) must be able to retrieve their assigned canine immediately upon their arrival at the kennel. To meet this requirement, the contractor shall provide each CEO with the necessary means of access (e.g. keys, code or 24 hour staffing) to independently retrieve their canines. The number of CEOs that will require access to the facility is nine (9), (8) CEO’s and (1) CEO Supervisor. The number of canines to be kenneled is eight (8). The number of officers requiring access may change according to the needs and requirements of CBP. All entry/exit points will be locked after hours or when unattended.
All dog runs shall be secured.
4A.2 Authorized Access: The contractor shall ensure that only authorized kennel personnel have access to CBP canines. Access to and contact with CBP canines by the general public and other animals including, but not limited to, privately kenneled animals is strictly prohibited at all times.
4A.3 Identification of working canines: The contractor shall ensure that kennel personnel do not identify or point out to anyone the identity and location/runs of CBP canines. At any time, information about the CBP canines shall not be disseminated to anyone, other than CBP CEOs.
4A.4 Operating Environment: In addition to providing suitable space for the canines, the contractor shall ensure that the kennel, access buildings, break areas, and curtilage are kept clean. At all times, the entire kennel site shall be kept in a condition that will not pose a danger to the canines or the CEOs. The kennel site shall be kept in an acceptable sanitary condition. (See Section 4C entitled Sanitation).
4A.5 Designated Representative: A Contracting Officers Representative (COR) designated by the Contracting Officer will be appointed to monitor contractor performance and coordinate technical and administrative matters with the Contracting Officer. The designated representative may conduct a semi-annual review, will provide a report to the Contracting Officer after each review and may conduct additional reviews as necessary. The designated representative will be identified in the Purchase Order.
4A.6 General CBP Canine Guidelines: CBP canines are typically of the sport variety.
CBP canines are working dogs, not pets boarded while their owners are on vacation.
These canines work 8 – 16 hours a day, often in high stress situations. The canines typically weigh between 20-90 pounds. Absent very unique circumstances, no CBP canine will be younger than one year old. The primary purpose of CBP canines is to utilize their extensive training to locate illegal contraband before it enters the United
SOW – OFO Area Port of Blaine K9 Kenneling Services Page 3 of 12
States. Therefore, it is important for these canines to have an appropriate environment to rest in while they are in the kennel facility. (See Sections 4B, 4C, and 4D).
4A.7 Staffing Hours: The kennel facility shall be staffed continuously on site by at least one employee during all active dog hours. The active dog hours for the CBP canines are between the hours of 7:00 a.m. and 6:00 p.m., seven days a week. The staff’s presence will ensure that the requirements for ill canines (Paragraph 4C.2 Health) and the requirements for stool removal (Section 4C. Sanitation) will be met during these active dog hours.
4A.8 Parking: The contractor shall have available parking spaces, on facility grounds to accommodate the government owned vehicles of CBP personnel who are on duty or who are working with the dogs. Sufficient parking and a safe, lighted area to load and unload dogs are required (See Paragraph 4B.9 Lighting). Twenty-four hour access to the parking area is required. The parking spaces shall be secured (fenced). Temporary/rental fencing is acceptable. Fencing shall be locked, to secure vehicles, with CBP having access to the key/combination.
4B. Facilities and Run Requirements:
The kennels shall be located in a secure location away from the public, with limited access. The kennels shall be located in an area with minimal stimulation. Kennels shall be positioned in a location with maximum protection from the elements. When possible, CBP canines shall be boarded in a location separate from non-CBP canines.
Only one CBP canine shall be in each kennel run at any one time. When kenneling in a chain link fence type design layout, contractor shall ensure an empty kennel, to be used as a “buffer zone”, is kept between any CBP canine and other dogs. When accommodations provide fully partitioned rooms - such as in solid wall construction - a fully empty “buffer” room is not required. The goal of a “buffer zone” is to prevent any contact between the CBP canine and any non-CBP canine and to also prevent any possible disturbances, overstimulation and/or injury to the CBP canine. Regardless of the circumstances, CBP canines cannot be placed in shipping crates or wire cages at any time. At no time shall the contractor permit a non-CBP canine to be kenneled in a CBP kennel run.
4B.1 Floor and Dog Runs: The kennel building shall be constructed with concrete foundations and subfloors. Kennel run floors shall be a sealed hard, non-skid surface (e.g., concrete or tile is acceptable). All concrete surfaces shall be sloped and constructed to allow for adequate drainage for flushing stools and urine from the kennel run. Pooling of liquid is not permitted. Other floors and pathways shall be of a non-skid surface and allow for adequate drainage for flushing stools and urine from the kennel surface. Toys are not permitted in the kennel runs unless specifically authorized by a CBP CEO. The only items permitted in the dog runs are the chew proof KURANDA platform bed (Brand Name or Equal), water bucket, and feed dish.
SOW – OFO Area Port of Blaine K9 Kenneling Services Page 4 of 12
4B.2 Kennel Runs: Indoor/outdoor and outdoor kennel runs will be considered by CBP.
However, CBP prefers indoor kennel runs as they are more secure and have less external stimuli. The indoor runs provide significantly more protection from the elements. A guillotine type drop door is permissible for the indoor/outdoor runs. All kennel runs shall be disinfected daily with veterinary approved chemicals (See Section 4C. on Sanitation).
Each kennel run must be at least 6 feet long by 4 feet wide, not including the sleeping area. Kennels runs combined with a sleeping area are permissible and must have a minimum of 36 square feet. No dimension of the kennel run shall be less than 3 feet.
Canines must have full access to their kennel run during daytime hours, 7 days a week.
This shall not be less than 11 hours each day, including times when the facility is closed to the public. CBP canines should not be locked in their sleeping area except for the period of time runs are being cleaned, sanitized or are resting at night.
4B.3 Kennel Run Barriers: If kennel runs use a common barrier to separate adjacent runs, the barrier shall be from the floor to the chain link or canopy top to prevent cross contamination between runs. The barrier must consist of a solid or composite wall at least 48 inches in height from the floor. The remainder of the barrier shall either be a solid wall or wire mesh fence fabric. No portion of the kennel run will be constructed of wood.
4B.4 Doghouses: Kennel runs shall be equipped with either a raised sleeping platform or doghouse. Outside kennel runs shall have the dog’s bedding area enclosed, preferably a doghouse. The doghouse shall have three solid sides and a top. If the facility has outdoor runs, the doghouse shall be positioned in the shaded side of each run. The doghouse shall be large enough to allow the dog to turn freely and provide at least two
(2) inches clearance above the animal’s head while in the standing position.
4B.5 Sleeping Areas/Platforms: The contractor shall provide chew proof aluminum KURANDA platform beds (Brand Name or Equal). The platform shall be of adequate size to accommodate the dog. If the enclosed bedding area is attached to the kennel run, it shall have two solid walls between the adjacent kennel runs with chain link ends. If the enclosed bedding area is separate from the kennel run it must have four solid walls with an access opening on one end. Access doors to the inside sleeping area, of an indoor/outdoor kennel run, shall be a minimum of 40” high and 28” inches wide.
4B.6 Canopies and Chain Link Tops: Indoor/outdoor and outdoor kennel runs shall be covered with a canopy that will provide shade during all daylight hours. All kennel runs shall have secured chain link tops, to prevent the dog from jumping or climbing out.
4B.7 Heating Ventilation and Cooling: All types of kennel facilities and kennel runs shall have fresh air either through windows, doors, vents or air conditioning. The minimum air temperature shall not be less than 50 degrees F. The maximum air temperature shall not be more than 85 degrees F. Humidity levels shall be maintained within 30 to 70 percent and any odors shall be rapidly eliminated from the building or structure.
SOW – OFO Area Port of Blaine K9 Kenneling Services Page 5 of 12
4B.8 Fencing and Gates: Wire mesh fence fabric shall be utilized on the runs and gates.
The fabric shall be at least 11-gauge material for 2-inch mesh or at least 13-gauge for 1 ¼-inch mesh. Access gates to each run and sleeping area shall have a positive latching system to prevent the dogs from jumping against the latch and accidentally opening the gate. Kennel facilities shall have a double gate/doors that requires the dog to go through two secure gates/doors to enter/exit the facility and grounds.
Security fencing shall surround all outside runs and break areas. The type of fence fabric shall meet or exceed 11-gauge steel wire-mesh chain-link fence. The fabric height, from ground to top of fence, shall be between 6’ and 8’ at all locations. No fence shall be located so that the features of land (its topography) or structures defeat its purpose by allowing passage over, around, or under the fence. The fence shall be kept in good repair at all times. The purpose of this requirement is to restrict access to the kennel from outside. As such, all fencing must meet this requirement.
4B.9 Lighting: The kennel compound, kennel runs, and parking lot shall be sufficiently lighted to provide security and to allow for safe night time activity in removing or returning canines to their kennel runs. All accessible areas will be lit, either by motion sensors or permanent lighting.
4B.10 Video Surveillance: The kennel compound, kennel runs, outside runs, break areas and secured parking lot will be under video surveillance 24 hours a day 7 days a week.
Video surveillance shall be a minimum of 720p resolution and available to CBP CEO Supervisor or COR for viewing, upon request.
4B.11 Break Area: The contractor shall provide a break/exercise yard for CBP canines, separate from break and exercise yards used for privately boarded dogs. For the safety of the canines only one dog at a time will be allowed in the break/exercise
4C. Sanitation:
Kennel runs and sleeping areas shall be cleaned and disinfected daily with a veterinarian approved solution that disinfects against Avian Influenza, Parvo virus and SARS-CoV-2 and Giardia at a minimum. This is to include the cleaning of walls, floor, door and ceiling. Kennel runs and sleeping/food area shall be kept pest and rodent free. Kennel runs shall be washed and stools shall be removed from the runs as often as necessary. Stools, urine and waste dog food shall not be allowed to remain in a run for more than one (1) hour during required staffing hours (See 4A.7, Staffing Hours). All stools shall be removed within one (1) hour after the facility opens for business or no later than 8:00 a.m. on days when the kennel is not regularly open for business.
All chemicals shall be stored away from any food items or on the floor, capped and in the original labeled containers. Chemicals not in the original container shall be clearly marked. All disinfectants used for cleaning shall have the approval of the EPA.
SOW – OFO Area Port of Blaine K9 Kenneling Services Page 6 of 12
Break areas containing materials that cannot be sanitized using veterinarian approved disinfect, such as gravel, sand, grass, earth, absorbent materials etc., must be sanitized by other means to include removing the contaminated materials and rinsing the contaminated area as often as necessary to prevent odors, diseases, pests, insects and vermin infestation. Areas with surfaces of dirt, absorbent materials, sand, gravel, grass or other similar material must be raked or spot cleaned with sufficient frequency to ensure all animals the freedom to avoid contact with excreta.
Stools and waste shall be removed promptly and completely between each canines’ use of the break area.
4C.1 Food and Water Areas: Kennel personnel shall clean food and water utensils every day with hot soapy water. Kennel personnel shall clean utensils used in preparation of food immediately after each food preparation period. Stainless steel feed and water pans shall be provided and used. Empty dog food bags shall be removed and disposed of in a covered waste container. All food shall be stored in a covered, rodent proof storage container. The area shall be rodent and pest free. The contractor shall provide a refrigerator for special diets and medications. Medication shall be properly labeled and stored in the refrigerator, if necessary. If the water supply comes from an underground well, it shall be tested and approved for human consumption (potable). If applicable, the water shall be tested annually and the results provided to CBP. The kennel shall have potable hot and cold running water. CEOs shall have 24-hour access to the potable hot and cold running water. Self-waterers will not be permitted.
4C.2 Health: The contractor shall ensure that CBP canines are not kenneled in the same room with any animals that are quarantined or are under medical treatment. The kennel must have an isolation area to accommodate those animals currently under quarantine or medical treatments. The contractor will ensure that ill CBP canines will be kenneled and in a different room from other ill privately boarded dogs. The kennel shall have First Aid Kits for personnel and animals.
Medication shall be administered to the canines by the kennel employees in accordance with veterinary instruction. In some instances, the CEO or CEO Supervisor may administer medication; CBP will coordinate with kennel employees accordingly.
Heartworm and flea/tick prevention will be provided by CBP and administered by kennel personnel according to medication instructions. Kennel personnel shall administer monthly heartworm and flea/tick prevention on the first day of each month or the first day of each quarter. This will be determined by the product that is provided by CBP.
Specific instructions will be provided by CEO Supervisor or COR.
Kennel employees may be requested to collect stool samples from the canines for medical testing, fecal containers will be provided by CBP.
The contractor shall observe the appearance and activity of the dogs for signs of illness, wounds, disease and discontent. The contractor shall specifically watch for signs of injury or other changes in the canines’ physical condition.
SOW – OFO Area Port of Blaine K9 Kenneling Services Page 7 of 12
In the event a CBP owned canine is injured, becomes ill, or is otherwise in distress, the contractor shall contact the assigned handler of the canine and the CEO Supervisor immediately upon determining the canine is injured, ill, or is otherwise in distress. If the injury or illness is an emergency, and the assigned CEO or CEO Supervisor cannot be contacted the contractor will contact the Blaine Command Center. (24/7 phone, number will be provided by COR in emergency contact list) and the contractor shall take the injured or ill canine to the pre-designated veterinarian. Reports of injury and/or illness and actions taken shall be documented. The name and contact information of the authorized veterinarian, CBP canine personnel emergency contact list and injury/illness form will be provided by the COR after award of Purchase Order.
If the Contractor fails to contact the appropriate Government personnel in a timely manner as aforementioned, Contractor assumes all liability for the canine and any charges that are incurred because of not contacting the appropriate Government officials.
In the unlikely event a CBP canine passes away, CBP personnel will take possession of the dog and transport it to the CBP designated Veterinary Hospital for a necropsy. No CBP canine shall be buried or disposed of by kennel personnel.
4C.3 Bathing:
CBP Personnel will perform the bathing and grooming services of the CBP canines. On average, each canine is bathed two (2) times per month. The contractor shall provide bathing utilities, which shall include either a low level or easy canine access basin or tub, equipped with cold and hot running water. The contractor shall keep the bathing area clean at all times and provide a constant supply of fresh clean towels. In addition, the contractor shall provide a cupboard, closet, locker or other similar storage area for CBP to store bathing supplies. The storage shall be of adequate size to hold a minimum of one month’s quantity of supplies. CBP personnel will provide bathing supplies. CBP will coordinate the bathing of canines to coincide with the facility bathing routine.
4C.4 Debris: The compound area where the kennels are located shall be free of all refuse, garbage, trash, and debris. Seeded areas within the compound shall be mowed/chopped and kept free of brush and tall vegetation that could pose a health hazard to the dogs, handlers, or other individuals entering the premises.
4C.5 Flea and Tick Prevention: The contractor shall cause the kennel and surrounding areas to be treated to prevent infestation of fleas and ticks. These areas shall be treated on a semi-annual basis, at a minimum and more if needed. A copy of the treatment record shall be provided to CBP semi-annually. Kennel compound must be free of poison baits or toxic materials accessible to animals. Pesticides must be approved by local, state and federal regulations for use around animals. Only licensed pesticide applicators are authorized to apply pesticides in and around the kennel compound. CEO Supervisor shall be given 24 hour advanced notice of application.
4C.6 Break Areas: When CBP canines are in the break areas, the area shall be kept free of all toys, e.g., tennis balls. For the safety of the canines, only one dog at a time will be
SOW – OFO Area Port of Blaine K9 Kenneling Services Page 8 of 12 allowed in the break/exercise. Break areas shall be kept clean. Stools and waste shall be removed promptly (Section 4C. Sanitation)
4C.6 Breaks: CBP canines shall receive breaks in the break yard daily. When not working, the CBP canine shall receive three (3) breaks each day no less than 10 minutes each. If the canine is not in the kennel for the full day, canines will receive 1 break for every four (4) hours the canine is at the kennel between operating hours of 0700 – 1800.
Breaks may be conducted on/off leash and all breaks must be logged on the daily break/exercise log chart. The break/exercise form will be provided by the COR after award.
4C.6 Exercise: CBP shall exercise the CBP canines daily. CBP will accurately log exercises for accountability purposes. If a CBP canine has not been exercised for 3 consecutive days, kennel staff shall alert the CEO Supervisor.
4D. Feeding:
4D.1 Food: The contractor shall provide all food, supplies, and equipment necessary to perform the feeding services. This includes items such as stainless steel feed and water pans, cleaning supplies and equipment, disinfectants, etc. The amount shall be the suggested label serving size provided by the food manufacturer unless the CEO, CEO Supervisor or COR approves special rations. The acceptable range for the key nutritional factors are:
Energy density 4.0 to 5.5 kcal ME/g DM
Fat 15 to 40 % fat DM or 30 to 65% of calories from fat Soluble carbohydrate 39 to 55% NFE DM or 20 to 50% of calories from NFE Protein 22 to 32% protein DM or 18 to 25% of calories from protein Digestibility DM digestibility >80%
Once a standard, approved brand of dog food is established, any change must be approved in advance by the CEO Supervisor or COR. Specialty food or diets will be purchased for by and provided CBP.
4D.2 Schedule: The kennel personnel shall be responsible for feeding the dog(s) according to the feeding schedule to be provided by CBP. All dogs will be fed 2 times a day, unless otherwise directed by the CEO Supervisor or COR. The frequency of feeding for each canine will be addressed on a case-by-case basis as designated by each respective CBP CEO or by the CEO Supervisor. Feeding time must occur within 30 minutes of the feeding schedule provided.
4D.3 Documentation: Kennel personnel feeding the dog shall complete the Food Stool Medication Chart on a daily basis. The Chart will be provided separately by the COR after Purchase Order award.
SOW – OFO Area Port of Blaine K9 Kenneling Services Page 9 of 12
4E. Reporting and Documentation Requirements:
4E.1 Protection: The contractor shall have a plan for emergency procedures. A copy of the local fire evacuation plan shall be posted in the kennel. The contractor shall provide fire extinguishers on site to extinguish common construction materials and/or electrical fires. The contractor shall ensure that the fire extinguishers are inspected and maintained in accordance with the local/state/federal fire regulations. The contractor shall have business insurance as required by the appropriate state and local governments and municipalities.
4E.2 Escaped Dog Plan: The contractor shall have a written plan for handling the “escaped dog” scenario. The plan shall include the immediate notification of CBP and define what steps will be taken. A copy of this plan shall be provided to CBP.
4E.3 Animal Injury Procedures: The contractor shall have written procedures to educate employees on how to handle animal related injuries and all contractor personnel shall be trained to follow these procedures.
4E.4 Personnel: If required by the state, the kennel manager must be certified to manage a kennel facility. If the kennel manager is replaced, the contractor shall provide notification to the COR immediately.
4E.5 Record Keeping: The contractor shall keep an electronic record (Microsoft Excel or Word) to be provided to the Government upon request of all CBP canines kenneled at the facility during each 30-day/monthly billing cycle.
5. DELIVERABLES
The contractor shall deliver the following items to CBP as outlined in the table below:
ITEM # TASK # DELIVERABLE (D) / MILESTONE (M) DUE DATE
1. 3 Applicable licenses and permits To be provided with bid and upon request
2. 4C.1 Well water testing (as applicable) Annually – due within 30 days
3. 4C.2 Reports of sickness and/or illness. Follow-up report due within 24 hours after completion of all actions taken during the illness or sickness.
4. 4C.5 Flea and Tick Prevention Copy of treatment record semi-annually
– due within 30 days
5. 4C.6 Daily break/exercise log chart Daily Record to be maintained and provided upon request
6. 4D.3 Food Stool Medication Chart Daily Record to be maintained and provided upon request
7. 4E.1 Emergency Procedures Plan To be provided with bid and upon request
8. 4E.1 Fire Evacuation Plan To be provided with bid and upon request
9. 4E.1 Insurance Documentation To be provided with bid and upon request
10. 4E.2 Escaped Dog Plan
Within 10 days after award. Send directly to COR.
SOW – OFO Area Port of Blaine K9 Kenneling Services Page 10 of 12
11. 4E.3 Animal Injury Procedures Within 10 days after award. Send directly to COR.
12. 4E.4 Certifications Required To be provided with bid and upon request
13. 4E.5 Canines kenneled Monthly record to be maintained and provided upon request
6. GOVERNMENT-FURNISHED EQUIPMENT (GFE) AND INFORMATION (GFI):
ITEM # TASK # DELIVERABLE (D) / MILESTONE (M) DUE DATE
1 4C.2 Heartworm and flea/tick prevention As required 2 4C.2 Authorized veterinarian contact At Award 3 4C.2 Emergency notification contact list of CEOs, CEO Supervisor and Blaine Command Center At Award
4 4C.2 Injury/illness reporting form At Award 5 4C.6 Break/exercise form At Award 6 4D.1 Specialty food or diets As required 7 4D.2 Feeding schedule and diet At Award 8 4D.3 Food Stool Medication Chart At Award
Section 4B.1 and 4B.5: Salient Characteristics of the Kuranda Platform Bed**:
*No access fabric edges *All aluminum frame *Orthopedic support *Cot style elevated bed *Waterproof fabric *Easy to clean *No stuffing
**Any other proposed type of bedding must meet or exceed these salient characteristics.
7. SECURITY:
There are no specific security classification level requirements associated with this procurement action.
Information is deemed unclassified.
8. PLACE OF PERFORMANCE
All kenneling services shall be performed at the contractor’s facility within thirty (30) miles by road one-way from the location shown below. (Distances will be calculated based on the shortest route indicated on Google Maps).
US Customs and Border Protection Area Port of Blaine 9901 Pacific Highway Blaine, WA 98230
SOW – OFO Area Port of Blaine K9 Kenneling Services Page 11 of 12
9. PERIOD OF PERFORMANCE:
The period of performance for the resultant Purchase Order shall be a base period of one-year plus three option years as follows:
BASE PERIOD: 09/15/2020 – 09/14/2021
OPTION YEAR ONE: 09/15/2021 – 09/14/2022
OPTION YEAR TWO: 09/15/2022 – 09/14/2023
OPTION YEAR THREE: 09/15/2023 – 09/14/2024
Exercising of option years is dependent on the needs and requirements of the Government (i.e., within the Government’s discretion).
10. SPECIAL CONSIDERATIONS:
10.1 Contracting Officer’s Authority: No changes to this SOW or price increases shall be incurred without written prior approval of the Contracting Officer. Any changes or cost increases will not take effect until the Contracting Officer executes a written modification. The Contracting Officer is the only individual with the authority to amend the solicitation or modify the contract.
10.2 Environmental Management: In order to comply with federally mandated environmental preference programs and Department of Homeland Security (DHS) “Green Procurement Program” (GPP) policy, US Customs and Border Protection requires the use of environmentally preferable products and services. These program elements include: recovered material products, energy and water efficient products, alternative fuels and fuel efficiency, bio-based products, non-ozone depleting substances, priority chemicals, and environmentally preferable products. These program elements are described on the Office of the Federal Environment Executive website (http://www.ofee.gov).
Product or service must be in compliance with Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety, and Drug-Free Work place FAR 52.223- 1 through 52.223-17, 52.204-4 and 52.211-5. The full text of the referenced FAR clauses may be accessed electronically at the following link (https://www.acquisition.gov/far/).
11. POINTS OF CONTACT (POCs)
Program Office:
Name: David Bailey Title: Technical Point of Contact/ Canine Enforcement Supervisor U.S. Customs and Border Protection Office of Field Operations Buffalo Field Office Phone: 716-284-5174 ext 466 Email: david.j.bailey@cbp.dhs.gov mailto:david.j.bailey@cbp.dhs.gov
SOW – OFO Area Port of Blaine K9 Kenneling Services Page 12 of 12
Name: Shawn Couthren Title: Contracting Officer Representative (COR) U.S. Customs and Border Protection Office of Field Operations Seattle Field Office Phone: 360-332-6429 ext 4 Email: shawn.l.couthren@cbp.dhs.gov
Contracting Office:
Name: Dominique Brown Title: Administrative Contracting Officer (ACO) U.S. Customs and Border Protection Office of Acquisition Border Enforcement Contracting Division – Pacific Branch Phone: 317-715-6253 Email: dominique.u.brown@cbp.dhs.gov
Name: Frank S. Duarte Title: Procuring Contracting Officer (PCO) U.S. Customs and Border Protection Office of Acquisition Border Enforcement Contracting Division – Pacific Branch Phone: 202-425-1775 Email: frank.s.duarte@dhs.gov mailto:shawn.l.couthren@cbp.dhs.gov mailto:dominique.u.brown@cbp.dhs.gov mailto:frank.s.duarte@dhs.gov
| Statement of Work (SOW) |
| U.S. Customs and Border Protection (CBP) |
| Office of Field Operations (OFO) Area Port of Blaine |
| K9 Kenneling Services |
File details come from the government source that posted it. Updated .