This is a Statement of Work (SOW) for the procurement and installation of an AIR Pack Compressor Fill Station at Sheppard Air Force Base Fire Emergency Services in Building 1093, Texas.
The contractor shall provide all labor, equipment, tools, supplies, and management necessary to survey the site, install, test, train, and deliver a NFPA 1901 (2016 edition) compliant stationary fill station with auto-cascade capability. The system must accommodate SCBA and SCUBA cylinders up to 31 inches in length and be capable of refilling exterior and vehicle-mounted cascade systems. Specific technical requirements include a 4-stage compressor operating at 6000 PSI (414 BAR) at 1420 RPM with 10 HP, 7.5 kW, single-phase voltage and 13 SCFM charging rate; a PLC-based controller with 7-inch color touchscreen; NEMA 4-rated electrical enclosure with UL-listed control panel; breathing air purification system; CO and H2S monitoring systems; automatic condensate drain system; 4 ASME-certified cylinders; dual and tri-fill capability at 3 positions; and a sound-attenuating enclosure. The unit must meet anchor footprint dimensions of 101 X 38 X 78 inches and weigh between 4350 and 4550 pounds. Deliverables include site survey, installation, leak testing, air sampling with written report, operator training, secure handover with system functionality demonstration, and removal and disposal of the existing unit. The contractor shall complete all work within 360 calendar days of contract award and coordinate exact service dates with the Government Representative. Acceptance occurs only upon Government verification of standard system functionality, after which the contractor shall submit payment documentation via WAWF system. The contractor must comply with Sheppard AFB security requirements, submit employee information for background checks, and may require government escort depending on Force Protection Conditions. The Government furnishes basic utilities and emergency services; the contractor is responsible for any damage to Government property incurred during execution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Project Title: AIR Pack Compressor Fill Station Location: Sheppard AFB Fire Emergency Services, 1024 Ave K, BLDG 1093 System: AIR Pack Fill Station Stationary W/ Auto Cascade
1. Scope of Work The contractor shall provide all tools, supplies, labor, equipment, and management necessary to provide and install the AIR Pack Compressor Fill Station at Sheppard AFB, Tx.
Fire Department Bldg. 1093. This includes all necessary installation, programming, and training.
2. Specific Tasks & Deliverables
• Shall include a Site survey, install, operate, leak test, train & perform air sample with written report.
• Shall be NFPA 1901 (2016 edition) compliant 3 position containment fill station that accommodates SCBA and SCUBA cylinders up to 31 inches in overall length
• Shall be capable to refill exterior and vehicle mounted CASCADE systems
• Shall have a Breathing air purification system
• Shall have a PLC Based controller with 7-inch color touchscreen display
• Shall have a NEMA 4 rated electrical enclosure with UL listed control panel
• Shall have a Compressor Model: 4 Stage with Pressure of 6000 PSI (414 BAR) @ 1420
RPM and 10 HP + Voltage: 7.5 kW HP / 1 Phase and a 13 SCFM charging rate @ 368 L/min
• Shall have Compressor low oil pressure and high temperature safety shutdown capability
• Shall have an Emergency Shutdown Push Button
• Shall have a CO Monitor w/Calibration Kit
• Shall have an H2S monitoring system with audible alarm
• Shall have an Inlet filter maintenance indicator
• Shall have an automatic condensate drain system, non-corrosive, with integrated float sensor, automatic “Full” indication and compressor shutdown
• Shall have an individual Cylinder Size of 6000 PSI on a Rack: Integral Designed Rear of
Unit Rack with 4 ASME certified Cylinders + Plumbing
• Shall have a Hinged Cascade fill control panel with Lexan laminate air flow/fill schematic
• Shall have a Sound attenuating enclosure with slam-action latches and lift-off type hinges
• Shall have a Hose Qty: One – 100-Foot-High pressure cabinet enclosed; on hose reel
• Shall have a Panel Mounted remote hose fill station
• Shall have the capability to Dual and Tri Fill at 3 positions
• Shall be painted and with logo in a Fire Edition version
• Shall meet the current anchor footprint setup of 101 X 38 X 78 inches (2565 x 965 x 1981 mm) and weigh no less than 4350 lbs. (1973 kg) and no more than 4550 lbs.
(2064 kg)
• Shall include Shipping, Installation, Training on New AIR Pack Compressor Fill Station, and Removal and Disposal of existing unit.
• Shall include Operator Training: The contractor shall provide end user training for operation and function of the installed system. Proper user training on equipment to ensure the New Air Pack Compressor Fill Station system operates at its optimal level.
• Shall be a Secure Handover: The contractor shall physically demonstrate to the designated Government Representative that the new AIR Pack Compressor Fill Station system functions correctly.
• Shall have Access Revocation: Upon completion and handover, the contractor shall retain no physical or remote access credentials, "backdoors," or default logins to the system.
3. Period of Performance All work, including testing and training, shall be completed within 360 calendar days of the contract award date. The contractor shall coordinate the exact service date and time with the Government Representative to ensure operational continuity at the Fire Department.
4. Inspection and Acceptance
• Acceptance Criteria: Work will be considered complete and ready for acceptance only when the Government Representative successfully operates the AIR Pack Compressor Fill Station and verifies standard system functionality.
• Invoicing / WAWF: Upon final government acceptance, the contractor shall submit a "Combo" (Invoice and Receiving Report) document type via the Wide Area Work Flow (WAWF) system for the authorized contract amount. Advance payments are not authorized.
5. Security & Access Requirements
• Base Access: The contractor shall comply with all Sheppard AFB security, safety, and traffic regulations. To obtain passes, the contractor must submit required employee information prior to arrival.
• Background Checks: All contractor personnel must consent to background checks prior to installation access.
• Escort Requirements: Depending on the local facility manager's directives and current Force Protection Conditions (FPCONs), the contractor may require a government escort while working within restricted or controlled areas of the Fire Department.
6. Government Furnished Property (GFP) The Government will provide basic utilities (electricity, water, sewer) and emergency services. The contractor is responsible for repairing or replacing any properly marked
Government property damaged during the execution of this work at no additional expense to the Government.
| STATEMENT OF WORK (SOW) |
| 1. Scope of Work |
| 2. Specific Tasks & Deliverables |
| 3. Period of Performance |
| 4. Inspection and Acceptance |
| 5. Security & Access Requirements |
| 6. Government Furnished Property (GFP) |
File details come from the government source that posted it. Updated .