This is a Statement of Work (SOW) for software development services related to the MH-60T Refreshed Data Concentrator Unit (DCU-R) Input/Output Configuration for the United States Coast Guard.
The primary objective is to update the I/O Configuration File for the MH-60T DCU-R (P/N 5561000-001) to ensure full compatibility with the existing legacy MH-60T DCU-L (P/N 5443000-001). SCI Technology, Inc. serves as the principal design authority and will provide all software required to load the Portable Operational Flight Program (POFP) and I/O Configuration Files into the DCU-R. The contractor must develop software deliverables in two phases: two Integration Releases (IR) with the initial release due within three months and an optional second IR for corrections, followed by one Configured Product (CP) release due one month after CP test and evaluation. Contractor responsibilities include developing the I/O Configuration File (IOM), creating technical documentation including Software/Hardware Verification Test Procedures and Reports, Interface Control Documents, Version Description Documents, and a Bundled Disk containing the POFP, loader software, and load procedures. The Government will furnish two DCU-R units (estimated value $96,500.00) and the USCG Aviation Logistics Center will serve as the Government technical point of contact. The contractor must also provide integration support for two integration releases with an optional onsite support component. All deliverables must be submitted electronically via DOD-SAFE. The purchase order will be issued at the time of award with specific contract data requirement list (CDRL) items and acceptance milestones detailed in Appendix A.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Terms and Conditions - 70Z03826QJ0000195.pdf | ||
| Attachment 3 - Redacted J and A - 70Z03826QJ0000195.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 - Statement of Work (SOW) – 70Z03826QJ0000195 for MH-60T Refreshed Data Concentrator Unit (DCU-R)
Input/Output (I/O) Configuration Software Development
GENERAL
1.1 Background
The United States Coast Guard (USCG) operates the MH-60T Jayhawk helicopter to conduct its missions. Since the first MH-60T flight in 2007, the USCG has completed several interim upgrades to the Common Avionics Architecture System (CAAS) to integrate new avionics capability. The current MH-60T Data Concentrator Unit (DCU-L) is facing obsolescence and has reached its end of life. The Refreshed Data Concentrator Unit (DCU-R) is the recommended Form, Fit, and Function replacement for all currently fielded MH-60T DCUs.
1.2 Objective
The primary objective of this effort is to update the I/O Configuration File for the MH-60T DCU-R (P/N 5561000- 001). The updated I/O Configuration shall be fully compatible with the existing (Legacy) MH-60T DCU (DCU-L).
1.3 Scope
This SOW is to be accomplished under purchase order (To be determined (TBA) at time of award). The requirements defined herein are as detailed in subsequent paragraphs.
DOCUMENTS
2.1 Applicable Documents
Technical documents applicable to this purchase order are identified in Table 2. The list is comprised of the latest version of the documents existing at the time of purchase order issuance. In the event that a new version of a document is released, the Contractor shall use the latest version available. Other documents that may apply include internal SCI Technology, Inc. (SCI) developed system documents, commercial and military specifications and standards.
Table 2: Applicable Documents
Number Title Source
5443000-001 DCU Top Level Assy Drawing (latest) SCI
5561000-001 DCU-R Top Level Assy Drawing (latest) SCI
3989-A007-001 HH-60J DCU Electrical Interface Control Document (EICD) (F) SCI
3989-A008-001 HH-60J DCU Multiplex Interface Control Document (MICD), (G) SCI
PROJECT MANAGEMENT
3.1 Roles and Responsibilities
3.1.1 SCI Technology, Inc.
SCI Technology, Inc shall serve as the principal design authority for DCU-R I/O configuration File (IOM) design and development. As such, SCI Technology, Inc. shall provide all software required to load the Portable Operational Flight Program (POFP) and I/O Configuration Files into the DCU-R.
3.1.2 USCG Aviation Logistics Center (ALC)
The ALC Medium Range Recovery product line shall serve as the Government representative and technical point of contact for the porting of the existing DCU I/O configuration file to the DCU-R. ALC shall manage the installation of equipment in the aircraft and any required aircraft modifications. During all portions of the aircraft integration, the USCG is responsible for supporting the aircraft. The USCG will provide the aircraft crew, all aircraft maintenance, all aircraft fuel, and all aircraft supplies. The aircraft shall remain the property of the USCG and shall not be bailed to the Contractor.
3.2 Government Furnished Equipment (GFE)
The Contractor shall utilize GFE managed under purchase order TBD.
3.2.1 Required GFE
The Government will provide the Contractor with the additional GFE listed in Table 3 (if needed).
Table 3: Government Furnished Equipment
Nomenclature Part Number Qty Estimated Value
DCU-R 5561000-01 2 $96,500.00
REQUIREMENTS
4.1 Develop Software
The Contractor shall develop and deliver DCU-R software in accordance with Appendix A. All deliveries shall be in electronic format and delivered via DOD-SAFE.
4.1.1 I/O Configuration File (IOM)
The Contractor shall develop and integrate a DCU-R I/O Configuration File (P/N 5561731-001) for the MH-60T.
The updated I/O Configuration File (IOM) shall implement the same parameters and settings as the DCU-L (5443000-001). The POFP / IOM / DCU-R combination shall be fully compatible (work in parallel) with the existing MH-60T DCU-L configuration, as referenced below:
a. DCU-L P/N: 5443000-001
b. DCU-L SW Configuration number 5443902-001
c. DCU-L Strap ID: 19 / 28
d. DCU-L UOFP: 5443798-001 Rev C
e. DCU-L UIOM: 5443761-003 Rev C
Integration Releases (IR) The Contractor shall plan for two integration releases.
1. Initial IR release (CDRL A001).
2. Optional second IR release with corrections to any I/O configuration problems found during initial IR test
(CDRL A001).
Configured Product Release (CP) The Contractor shall plan for one fully configured product release (CP) after IR validation and acceptance (CDRL B001).
(Remainder of this Page Intentionally Left Blank)
4.1.2 Bundled Disk
The Contractor shall create and deliver a new Bundled Disk, 5561902-001, for the DCU-R (CDRL B002). This disk shall be the equivalent of 5443902-001 for the DCU-L but does not replace it. The disk shall contain the following items:
1. POFP (CDRL B003): 5561730-001
2. IOM (Configuration File) (CDRL B004): 5561731-001
3. Loader Software (CDRL B005): 5561734-001
4. Load Procedure (CDRL B006): PROG5561900-001
5. POFP Version Description Document (VDD) (CDRL B007): VDD5561730-001
6. IOM Version Description Document (VDD) (CDRL B008): VDD5561731-001
7. Bundled Disk Description Document (BDD) (CDRL B009): BDD5561902-001
4.2 Contractor Technical Support
The Contractor shall provide integration support for two integration releases (IR). This shall include an option for on-site support (C001).
4.3 Develop Technical Documentation
The Contractor shall create and deliver DCU-R technical documentation in accordance with Appendix A. All deliveries shall be in electronic format and delivered via DOD-SAFE.
4.3.1 Software/Hardware Verification Test Procedure (SHVTP)
The Contractor shall create & deliver a new SHVTP (SHVTP5561902-001) for DCU-R (P/N 5561000-001) (CDRL A002) as specified below:
a. Shall be equivalent to existing DCU-L SHVTP (3989-A011-001)
b. Does not replace 3989-A011-001
4.3.2 Software/Hardware Verification Test Report (SHVTR)
The Contractor shall create & deliver a new SHVTR (SHVTR5561902-001) for DCU-R (P/N 5561000-001) (CDRL A003) as specified below:
a. Shall be equivalent to existing DCU-L SHVTR (3989-A012-001)
b. Does not replace 3989-A012-001
4.3.3 Interface Control Document (ICD)
The Contractor shall create & deliver a new ICD (ICD5561902-001) for DCU-R (P/N 5561000-001) (CDRL A004) as specified below:
a. Shall be the combined equivalent to the current ICD (3989-A007-001) & MICD (3989-A008-001).
b. Does not replace ICD 3989-A007-001 & MICD 3989-A008-001 for DCU-L (5443000-001)
4.3.4 Version Description Document
The Contractor shall deliver a Version Description Document (VDD) for the new POFP and I/O Configuration File as specified below:
a. POFP Version Description Document (VDD) (CDRL B007): VDD5561730-001
b. IOM Version Description Document (VDD) (CDRL B008): VDD5561731-001
LIST OF ACRONYMS
ACRONYM DEFINITION
ALC Aviation Logistic Center
BDD Bundled Disk Description Document
CAAS Common Avionics Architecture System
CDRL Contract Data Requirement List
CI Configuration Index
COR Contracting Officer Representative
CP Configured Product
DCU Data Concentrator Unit
DCU-R Data Concentrator Unit - Refreshed
EICD Electrical Interface Control Document
FTP File Transfer Protocol
GFE Government Furnished Equipment
HMI Human-Machine Interface
ICD Interface Control Document
I/O Input/Output
IOM I/O Mapping (Configuration File)
IR Integration Release
LSB Least Significant Bit
MICD Multiplex Interface Control Document
MRR Medium Range Recovery
ACRONYM DEFINITION
OFP Operational Flight Program
POFP Portable Operational Flight Program
SHVTP Software/Hardware Verification Test Procedure
SHVTR Software/Hardware Verification Test Report
SIL Software Integration Lab
SOW Statement of Work
SW Software
USCG U. S. Coast Guard
VDD Version Description Document
APPENDIX A (CDRLS)
Purchase Order Deliverable Requirement List
CDRL Title Item Part Number Frequency/Qty Acceptance
Req’d Delivery Timing
SOW
Reference
A001 I/O Configuration File (IOM) Initial Release
(IR)
5561731-001 Two (2) X 3 Months ARO 4.1.1.1
A002 Software/Hardware Verification Test Procedure (SHVTP)
SHVTP5561902-001 One (1) X 2 Weeks Prior to IOM CP Delivery
4.3.1
A003 Software/Hardware Verification Test Report (SHVTR)
SHVTR5561902-001 One (1) X 2 Weeks Prior to IOM CP Delivery
4.3.2
A004 Interface Control Document (ICD)
ICD5561902-001 One (1) X 2 Weeks Prior to IOM CP Delivery
4.3.3
A005 Installation Control Drawing
5561001-001 One (1) X TBD TBD
B001 I/O Configuration File (IOM) Configured Product Release (CP)
5561731-001 One (1) X 1 Month After CP Test and Evaluation
4.1.1.2
B002 Bundled Disk (B003 – B009)
5561902-001 One (1) X 1 Month After CP Test and Evaluation
4.1.2
B003 Processing Operational Flight Program (POFP)
5561730-001 One (1) X 1 Month After CP Test and Evaluation
4.1.2
B004 I/O Configuration File
(IOM)
5561731-001 One (1) X 1 Month After CP Test and Evaluation
4.1.2
B005 Loader Software 5561734-001 One (1) X 1 Month After CP Test and Evaluation
4.1.2
CDRL Title Item Part Number Frequency/Qty Acceptance
Req’d Delivery Timing
SOW
Reference
B006 Load Procedure PROG5561900-001 One (1) X 1 Month After CP Test and Evaluation
4.1.2
B007 POFP Version Description Document
(VDD)
VDD5561730-001 One (1) X 1 Month After CP Test and Evaluation
4.1.2
B008 IOM Version Description Document
(VDD)
VDD5561731-001 One (1) X 1 Month After CP Test and Evaluation
4.1.2
B009 Bundled Disk Description Document
(BDD)
BDD5561902-001 One (1) X 1 Month After CP Test and Evaluation
4.1.2
C001 Onsite Technical Support
Travel One (2) Week As Required for IOM Test and Evaluation
4.2