This is a Statement of Work (SOW) for the overhaul of an Allied Systems Marine Crane Dual Point Davit Model DDP11000CTS for the U.S. Coast Guard.

The Contractor must provide all equipment, labor, and materials to open, inspect, report, overhaul, test, preserve, package, and mark the government-furnished davit to "Serviceable A" condition—fully functional and meeting all design specifications equivalent to a new unit. Work must comply with SFLC Standard Specifications 5000 and TP 7902A, Coast Guard Technical Publications, and OEM specifications. Reclaimed, recycled, or aftermarket parts are prohibited. The Contractor shall renew all non-structural fasteners and grease fittings with 300-series stainless steel, replace all O-rings, oil seals, gaskets, bearings, and bushings, and renew all hydraulic hose assemblies with manufacture cure dates less than one year old. Within ten days of receipt, the Contractor must submit a receiving report with digital photos documenting general condition, model/serial numbers, and any missing or damaged parts. Within 60 calendar days, the Contractor shall disassemble, clean, visually inspect, and provide a cost proposal for approval detailing structural components, hydraulic systems, and electrical systems requiring work.

Extensive testing is mandated upon completion, including structural static load tests (18,440 lbs. vertical load held for 10 minutes), hydraulic system hydrostatic testing at 150 percent design pressure, and operational tests with certified weights of 11,000 lbs. The operational testing includes modified static load tests (12,573 lbs.), dynamic load tests (10,477 lbs.), loaded and light-loaded tests simulating boat launch and recovery, brake-only lowering tests, gravity launching verification, powered and unpowered recovery tests, cylinder stem drift tests, leveling tests, hydraulic oil contamination analysis (ISO 17/15/12), and safety switch verification. A Quality Assurance Representative (QAR) must witness all tests. The Contractor shall install the upgraded DDP110000 modification kit, including constant tension upgrade and machinery space camera system with solid state drivers. All coatings must comply with SFLC STD SPEC 6310 (Zinc Rich Primer, Epoxy MidCoat, Polysiloxane topcoat in Spar color SAE-AMS-STD-595 #10371), and exposed metal surfaces must be 316 Grade CRES or corrosion-resistant. After completion, ABS/SOLAS certification status must be validated or renewed. The davit shall be preserved per OEM long-term storage recommendations, packaged individually in ABS-approved containers, and marked with stock number, item name, part number, serial number, gross weight, condition rating, contract number, and delivery task number using 1-inch minimum black stencil on white background with bar coding per MIL-STD-129R Code 60. Shipment must be delivered to Defense Depot Barstow California (DDBC), SW3215 Def Dist. Barstow CA 92311-5014, with seven days' advance notice to the Contracting Officer Representative and Contracting Officer. Government acceptance occurs at destination contingent upon verification of no transit damage and compliance with preservation, packing, and marking requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Overhaul of Dual Point Davit

Model DDP11000CTS

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to open, inspect & report, test, and overhaul Allied Systems Marine Crane Dual Point Davit Model DDP11000CTS.

1.2 Government-furnished property.

ITEM DESCRIPTION NSN P/N CAGE

Dual Point Davit 2030-01-630-6123 DDP11000CTS 60848

2. REFERENCES

2.1 General- The documents listed in this section are specified in section 3 of this SOW. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements cited in section 3 of this description, whether or not they are listed as a reference.

COAST GUARD DOCUMENTS

Coast Guard Technical Publication 7902A Hull, Mechanical, & Electrical Boat Davit, 01Mar2021

SFLC Standard Specification 0740, 2020, Welding and Allied Processes

SFLC Standard Specification 5000, 2020, Auxiliary Machine System

SFLC Standard Specification 6310, 2020, Requirements for the Preservation of Ships Structures

USCG Drawing 750-WMSL-801-20, Rev -, Booklet of General Plans, 1/08

USCG Drawing 750-WMSL-583-001, Rev B, Small Boat Handling Arrangements, 11/03

USCG Drawing 750-WMSL-583-002, Rev B, Small Boat Stbd, Hdlg Sys, Arr & Details, 9/08

Colors Used in Government Procurement SAE-AMS-STD-595 dated 2/14/2017

OTHER GOVERNMENT DOCUMENTS

Code of Federal Regulations (CFR 46), U.S. Coast Guard, Subchapters F and J

ANSI/ NCSL Z540-1, Calibration Laboratories and Measuring and Test Equipment - General

ASME BPV Code Section VIII, Division 1 & 2, Rules for the Construction of Pressure Vessels

British Standard (BS) BS EN 837-1, 03/1998, Pressure Gauges Part 1: Bourdon Tube Pressure Gauges –

3.0 REQUIREMENTS

3.1 General – The Contractor shall provide all equipment, labor and materials to open, inspect, report, overhaul, test, preserve, package & mark, a government-furnished & not-ready-for issue Dual Point Davit to a ‘like-new’ and Serviceable “A” condition davit within this contract requirement. The Contractor shall accomplish all work herein in accordance with SFLC Std Spec 5000 and TP 7602A. Parts provided shall be in accordance with the Original Equipment Manufacturer (OEM) specifications, drawing(s) and data provided within this Statement of Work (SOW).

Reclaimed, recycled, or aftermarket parts are not acceptable and shall not be used.

3.1.2 Serviceable “A” condition is defined as fully functional refurbished Dual Point Davit meeting all required design specifications & dimensions in accordance with Coast Guard Drawings and being capable of functioning and performing in the same manner as an identical new Dual Point Davit.

3.1.3 The requirements described herein are considered the minimum necessary and are not intended to replace any procedures, controls, examinations, or tests normally employed by the Contractor to assure the quality of the product.

3.1.4 Non-structural fasteners and grease fittings. The Contractor shall renew all non-structural fasteners and grease fittings with stainless steel to suit fastener requirements. Nonstructural fasteners include roll pins, circlips, cotter pins and other fasteners.

3.1.4.1 Elastomer renewal. The contractor shall renew all O-rings, oil seals, gaskets, and seals.

3.1.4.2 Bearings and Bushings. Contractor shall renew all bearings and bushings.

3.1.4.3 Fasteners. The Contractor shall renew all non-structural fasteners with 300-series stainless steel fasteners

3.1.5 Receipt report. Within ten (10) days from receipt of the davit, the Contractor shall inspect and inventory the davit assembly and submit a receiving report with digital photos of moderate resolution for the following:

General condition of the shipping container and davit assembly.

Davit model and serial numbers.

Missing or damaged parts/components with digital photos of moderate resolution (due to attachment size limits for CG Email) of each.

3.1.6 Additional part renewal reports. The Contractor shall provide a report via CFR for all additional parts deemed necessary for renewal with supporting reasons for each renewal.

3.1.7 ABS/SOLAS Certification. After completion of all work, the contractor shall Dual Point Davit system shall validate or renew the ABS/SOLAS certification status of the davit.

3.2 Inspections.

3.2.1 Disassemble, Clean and visually inspect. The Contractor shall disassemble, clean and visually inspect the following and submit a CFR and cost proposal for COTR and Contracting Officer approval within 60 calendar days of receipt of davit:

1. Structural: arm assemblies, tilt cylinders, control console

2. Hydraulic Systems: 125HP motor & axial piston pump, with fixed gear, control valve, winch system , brakes, clutches, constant tension system, gears, relief valves, switches, anti-2-block switches, accumulators, counterbalance valves, and sheaves.

3. Electrical System: control console, wire rope tension sensor and anti-2-block controls

3.2.2 Non-Destructive Inspection (NDI). The Contractor shall perform NDI of the following in accordance with SFLC STD Spec 0740, Appendix C.

All machinery foundation and mounting point welds.

Davit Frame.

Winches Arm Assemblies Power Sheave Assembly

3.3 Overhaul. Upon receipt of the Contracting Officer’s authorization to proceed, the Contractor shall overhaul and preserve (as applicable), all major components/assemblies and sub-components/assemblies, including & not limited to Mechanical Assemblies, Hydraulic System including primary & secondary HPU assemblies, Boom & Power Sheave assemblies, winch, CT & emergency systems, Electrical System’s starter & power assemblies, accumulators, winches and motors.

3.3.1 Replacement of hydraulic hoses. The contractor shall furnish and renew all hydraulic hose assemblies in accordance with SFLC Stud Spec 5000, Appendix C and provide manufacture cure dates, age of hoses upon delivery. All hoses provided in the statement of work will have manufacture cure dates that are less than or equal to one year old based on the date of testing after completion of the work required in this Statement of Work.

3.3.2 Coatings and Paint Dry Film Thickness requirements to be verified during inspection - All factory pre-painted parts for installation on the weather deck shall be coated per SFLC Standard Specification 6310 (SFLC STD SPEC 6310), Appendix A, under 'Machinery, Deck' Option II that requires a Zinc Rich Primer, Epoxy MidCoat, and Polysiloxane topcoat in accordance with SFLC STD SPEC 6310, Appendix “C”. The topcoat color shall be Spar, SAE-AMS-STD-595 color # 10371. Component factory grade enamel paint systems are not acceptable, unless the original coating treatment is specifically accepted by the Contracting Officer in advance.

3.3.3 All exposed metal surfaces shall be made of 316 Grade CRES or otherwise coated in a manner to prevent corrosion from a saltwater environment.

3.4 Testing –All testing in paragraphs 3.4.1 and 3.4.2 shall be performed at the completion of the davit overhaul and prior to delivery to the U.S. Coast Guard. All weights shall be certified, either individually or using a current calibrated load cell.

3.4.1 Structural Static load test – If any welding was performed during the overhaul of the davit assembly, a static load test is required and shall be performed as follows. Each of the davit arms shall be fully extended and shall at the same time be subjected to a static load test of not less than 18,440 lbs. vertical to the davit tip. The test loads shall be held for not less than 10 minutes. The davit shall be inspected for deformation, damage or deflection. A laser pointer shall be used to verify deflection. Laser shall be set up and position verified prior to weights being installed and then verified that laser comes back to its original position after Static Load test is completed to verify deflection.

3.4.2 Operational test – Upon overhaul completion, the Contractor shall conduct a static load and operation test of each Dual Point Davit part assembly in accordance with OEM’s specifications and drawings and provide a written report in preparation of the Quality Assurance Representative (QAR) onsite visit. The post-overhaul testing shall be conducted with the davit mounted on a horizontal test platform.;

a.- Hydraulic System - The hydraulic system shall be hydrostatically tested to 150 percent of the design pressure of the hydraulic system, prior to use for other testing.

b. - Certified Weight Test - The Contractor shall spread a single certified test weight of not less than 11,000 lbs. between the davit’s arms, with the load shared equally. The test weight shall simulate (by weight) a boat in the cradle. The test weight shall be used for the following tests, repeating each test 3 times.

c. - Static Load – Modified Test - The Contractor shall perform a modified static load test against each hook, wire rope system, winch brake and constant tension system to not less than 12,573 lbs. (8,382 x 1.5). The load shall be certified test weights, or equivalent water-bag system. The load shall be held for 10 minutes with no movement, and released under controlled conditions. This test shall be repeated 3 times.

d. - Dynamic Load Test - The Contractor shall perform a dynamic load test of the system against each hook, wire, winch and constant tension system to not less than 10,477 lbs. (8,382 x 1.25). The load shall be certified test weights, or equivalent water-bag system. The load shall be lifted and lowered, and breasted over the entire range of motion of the davit, to the extent practical without the test weight interfering with the davit or structure. This test shall be repeated 3 times.

e. Loaded Test - The survival craft or rescue boat, loaded with its normal equipment or an equivalent mass and a distributed mass equivalent to that of the number of persons, each weighing 75KG, it is permitted to accommodate, should be released by operation of the launching control on deck. The speed at which the survival craft or rescue boat is lowered into the water should not be less than that obtained from the formula:

Load on one arm shall be not less than 8, 382 LBS.

Load on other arm shall not be less than 5,588 LBS.

For testing, the load shall travel a minimum of 5 feet and the rate of descent shall be calculated in feet per minute. The acceptable speed shall by not less than 104 Ft/MIN and not more than 180 FT/MIN

f. Light Loaded Test - The survival craft or rescue boat, loaded with its normal equipment or an equivalent mass should be release by operation of the launching control on the deck to demonstrate that the lifeboats mass is sufficient to overcome the frictional resistance of the winch, falls, blocks and associated gear.

Load on each arm shall be not less than 3,000 LBS.

g. Lowering Test, Brake only - The survival craft or rescue boat loaded with its normal equipment or an equivalent mass and a distributed mass equal to that of the number of persons, each weighing 75 KG, it is permitted to accommodate + 10% of the working load, should be lowered at maximum speed and stopped abruptly to demonstrate that the attachments of the davit and winches to the ship’s structure are satisfactory.

Load on each arm shall be not less than 7,260 LBS.

h Lifting and Lowering Speed - Verify system luffing speed from full inboard to full outboard, and from full outboard to full inboard; (3) Times.

i. Recovery Test - It should be demonstrated that the davit-launched lifeboat or rescue boat can be recovered by means of operating the hand gear.

Demonstrate the ability to hand crank the load Demonstrate the ability to use accumulator pressure to move the arms toward the stowed position.

Minimum Load on each arm shall be not less than 6,600 LBS

j. Gravity - Verify the provisions for gravity launching of the boat without power from the cradle; (3) Times.

k. -. Recovery Test, Powered - Where davits are recovered by power, it should be demonstrated that the power is automatically cut off before the davit arm comes against the stops.

l. -Recovery Test, without Power - Verify the provisions for recovery of the boat without power; (3) Times.

m. - Cylinder Stem Drift Test – With the rated load and the davit in position to have a boat at the rail, mark the cylinder stem and wait 10 minutes. The cylinder stem shall not drift more than 1/2mm in a 10 minutes span.

n. - Leveling Test – Demonstrate the ability to level the Davit Arms if they are not synchronized.

o. _ Hydraulic Oil Sample - A hydraulic oil sample shall be taken before testing and at the completion of testing. The cleanliness level shall not exceed the required contamination level. Contamination Level ISO Code is 17/15/12.

p. - No Load Function Performance Test - With No Load, Run the Davit at Max Speed and Record the Results of Park to Launch and Launch to Park speeds.

q. -. Safety Switches - Verify that Anti-2-Blocks and Down stops are functional

3.5 Notifications and inspections - The Contractor shall be responsible for notifying the Contracting Officer at least ten

(10) calendar days prior to said Contractor being ready for any inspections or testing required herein.

3.6 Overhaul/ Repair of the Dual Point Davit shall include the installation of the upgraded DDP110000 modification kit - Constant Tension upgrade and the machinery space camera system. The upgrade includes converting to solid state drivers.

4.0 QUALITY ASSURANCE (QA)

4.1 Responsibility for Inspection – It is the government’s intent to have a Quality Assurance Representative (QAR) witness all testing prior to acceptance and the Contractor is responsible for the performance of all inspection requirements as specified herein. The Contractor may use his own or any other facilities for the performance of the inspections and tests, unless disapproved by the government. The government’s QAR shall witness the following tests and inspections;

a. -3.4.1.a – Structural Static Load Test if required based on scope of work performed (welding).

b. -3.4.2.a – Hydraulic System

c. – 3.4.2.b – Certified Weight Test

d. – 3.4.2.c – Static Load Test- Modified

e. – 3.4.2.d - Dynamic Load Test

f. – 3.4.2.e – Loaded Test g – 3.4.2.f – Light Loaded Test

h. – 3.4.2.g – Lowering Test- Brake Only

i. – 304.2.h.- Lifting and Lower Speed

j. - 3.4.2.i – Gravity Test

k. - 3.4.2.j Recovery Test, Powered

l. – 3.4.2.k Recovery Test Without Power

m. _3.4.2.k – Cylinder Stem Drift Test

n. – 3.4.2.m – Leveling Test

o. – 3.4.2.n -Hydraulic Oil Sample

p. – 3.4.2.o –No Load Performance Function Test

q. – 3.4.2.p. - Safety Switches

4.1.1 Calibrations - All equipment used for testing was calibrated and traceable to NIST; current calibrations were less than 1 year from last calibration. Each weight had markings to indicate the weight of each piece and the KTR supplied paperwork for each weight used. Since some of the paperwork was over 10 years old, the KTR weighed each group of weights with a calibrated dynamometer to ensure that each test was conducted with the required weight.

4.2 Responsibility for Compliance - All items shall meet the requirements of this SOW. The inspections set forth in this SOW shall become part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the government for acceptance comply with all requirements of the contract. Sampling for quality conformance does not authorize submission of known defective material (either indicated or actual) nor does it commit the government to acceptance of defective material.

4.3 Noncompliance - Shall mean any single failure of any individual part or subsystem during final inspection/testing.

The contractor is responsible for correcting any failures and noncompliance issues encountered during testing and inspection.

4.4 Test and Inspection Reports - One copy of any inspection/test report approved for use from submittals shall be sent to the Contracting Officer for approval. Each Test and Inspection report shall list the davit’s part number, serial number with the person preforming the tests and inspections and the contract’s number and delivery order.

4.4.1 A copy of all test and inspection reports shall be given to the Coast Guard Quality Assurance Representative upon arrival at the Contractor’s Plant or sent via e-mail to the Coast Guard Contracting Officer Representative designated if prior agreement is made between the contractor and Contracting Officer.

4.4.2 A copy of all test and inspection reports generated while the Coast Guard Quality Assurance Representative is in plant shall be provided to the Quality Assurance Representative prior to exiting.

4.4.3 Any inspection, test or tolerance check report submitted shall have all out of tolerance readings circled or otherwise indicated.

4.5 Calibration System - The Contractor as well as any subcontractors shall be required to maintain a test equipment calibration program in compliance with NCSL Z540.3 2006. The program shall be documented and traceable to the National Institute of Standards and Technology (NIST).

4.5.1 The calibration system records shall be maintained for inspection for the duration of any contract referencing this

SOW.

4.6 Packing Inspection - The Contracting Officer shall be notified prior to the preservation, packaging, and marking of the completed units in accordance with 5.0 of this SOW.

5.0 PRESERVATION, PACKING, AND MARKING

5.0.a General. The Davits shall be shipped in storage or shipping containers approved by ABS under ABS Rules for Certification of Cargo Containers (1998). Damage to the equipment resulting from improper packaging and/or preservation shall be the responsibility of the Contractor. Special handling requirements shall be clearly noted on each item and on the Bill of Lading. Any shipments required due to equipment failures, defect correction, and/or non-conformance to specification, shall be the responsibility of the Contractor.

5.1 Preservation. Repaired & Overhauled Dual Point Davits are intended for warehouse storage & shall be prepared for Long Term Storage according to OEM recommendations in Chapter 8 of TP 7902. In addition, the Contractor shall ensure the below preservation, packing, and marking requirements in accordance with Specification Packaging and Labeling

MIL-STD-2073-1E.

5.1.1 Any exposed threads shall be protected by a cardboard sleeve.

5.1.2 The Contractor shall ensure any exposed areas on the hydraulic cylinders are drained and lubricated with an appropriate light preservative and wrapped with moisture barrier paper during storage.

5.1.3 Intake and discharge ports shall have plastic caps installed.

5.2 Packaging. The Contractor shall package each davit assembly individually in accordance with MIL-STD-2073-1E using shipping container(s). Each Assembly shall be secured using blocking, bracing or straps to prevent movement inside the shipping containers. Immediately available and inside each Shipping Container(s), a protected document shall be placed near the rear door of the shipping container with major assembly and/or contents of each container.

5.3.1 WPM Requirements - All packing and packaging materiel shall meet the Phytosanitary Requirements for Wood Packaging Materiel IAW ISPM 15 Regulation of wood packaging material in international trade. WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames and cleats.

5.4 Marking - Each preserved and packaged item shall be marked in the upper left-hand side of the two longest sides, (two opposite sides if square) of each crate. The lettering shall be black painted stencil and permanently affixed to each container. The lettering shall be at least 1” high, and be applied on a white painted background. If two shipping containers are used, the Contractor shall add ‘Part 1 of 2 & 2 of 2’ shall be included.

a. This marking shall consist of the following:

1. Stock Number.

2. Item Name.

3. Part Number.

4. Serial number

5. Gross Weight (in lbs.).

6. Condition “A”

7. Unit of issue with quantity (i.e. 1-EA).

8. Contract #:

9. Delivery Task #:

10. U.S. COAST GUARD SFLC MATERIAL.

5.6 Bar Coding- The stock number shall be bar-coded in addition to the numerical markings. All bar-coded labels shall be in accordance with MIL-STD-129R, Code 60 Symbols

5.7 Shipping - The Contractor shall notify the Contracting Officer Representative (COR) and KO about the shipment 7 days in advance. Provide timely shipping information to COR including the name of the shipping company, date of shipment leaving Contractor’s facility, and expecting arrival date and time at the government facility. No shipment shall arrive outside of government normal business hours as determined by the KO.

5.7.1 Unless otherwise specified, the Contractor shall ship, and deliver all overhauled davits to the following government addresses:

Defense Depot Barstow California (DDBC) SW3215 Def Dist. DEPOT BARSTOW Central Receiving WHSE 7

BARSTOW CA 92311-5014

5.8 Government Acceptance- Acceptance will be made at destination by a government representative.

Acceptance will be contingent upon representative’s verification of no damage in transit, correctness and completeness of order and Contractor’s conformation to preservation, packing and marking requirements.

6.0 NOTES

6.1 Government & Commercial Document Sources

a. Specification and Standards (DODISS Documents) Standardizations Document Order Desk 700 Robbins Avenue Building #4, Section D Philadelphia, PA. 19111-5094 Phone: 215-697-1187

b. DOD & Navy Publications and Forms (Other Than DODISS)

Naval Publication and Forms Center 5801 Tabor Ave.

Philadelphia, PA. 19120 Phone: 215-697-2000

c. International Maritime Organization

4 Albert Embankment London SE1 7SR United Kingdom

Email: PUBLICATIONS-SALES@IMO.ORG Phone: + 44 (0)20 7735 7611 Fax: + 44 (0)20 7587 3241

d. USCG Surface Forces Logistics Center

2401 Hawkins Point Road Baltimore, MD. 21226-5000 Phone: 410-762-6171 ATTN: Contracting Branch, CPD2

6.2 Allied Systems Marine Crane

21433 SW Oregon St.

Sherwood, OR 97140 Phone: 503-625-2560