This statement of work outlines requirements for a federal contract to remove asphalt and cinder debris piles from the Craters of the Moon National Monument and Preserve in Idaho. The contractor shall provide all personnel, equipment, transportation, and disposal for approximately 200 cubic yards of asphalt debris and 75 cubic yards of cinders staged at the monument's boneyard area. Work must be completed within 20 days of notice to proceed and include signage, cleanup, and receipts for proper off-site disposal of all debris. The contractor shall coordinate with the monument's technical contact and contracting officer to address any issues and schedule a final inspection upon job completion by early September.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8323Q0072.pdf | ||
| Attachment_3_Forms_to_Return_with_Quote_140P8323Q0072nc.docx | DOCX document | |
| Attachment_2_SCA_Wage_Determination_2015-5507_Butte_County.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation no. 140P8323Q0072 Remove Asphalt and Cinders Piles Attachment 1, Statement of Work Craters of the Moon National Monument and Preserve (CRMO)
1 | P a g e
STATEMENT of WORK (SOW)
Remove Asphalt and Cinders Piles from Boneyard
National Park Service Craters of the Moon National Monument and Preserve (CRMO)
1266 Craters Loop Road, Arco, ID 83213
1. DESCRIPTION OF SERVICES. The contractor shall provide all necessary personnel, equipment, tools, materials, supervision, permits and other items necessary to load, transport and properly dispose of approximately 200 cubic yards (approximately 400 tons) of asphalt debris and approximately 75 cubic yards (approximately 40 tons) of cinder that have been staged in a designated storage area known as the ‘boneyard’ at CRMO. The asphalt is the debris remaining from the demolition of a walking trail and the cinders were relocated from another area within the park. Both piles are relatively free of other debris.
2. TECHNICAL_REQUIREMENTS: The Contractor shall provide all the necessary labor, equipment, materials, transportation, and supervision to meet all of the following requirements:
Provide a minimum of 5 working day notice of intent to start work Provide appropriate signage to control public traffic near the work area Approximately 275 total cubic yards of material shall be loaded and removed The Period of Performance is not to exceed 20 days Correct any discrepancies that may occur in conjunction with this project Contractor is to clean-up the work area and properly dispose of all related debris Contractor shall provide receipts that indicate quantity and location of debris disposal Contractor is to notify the POC upon completion of work
**NOTE: The equipment operator should demonstrate caution when excavating materials from the cinders and asphalt piles in regard to the areas being adjacent to known archaeological sites. A blade with a smooth leading edge is required (rather than a toothed edge) bucket to limit disruption to the existing grade. The contractor understands that a representative from the cultural resources division may be onsite during materials removal to observe materials for possible culturally significant artifacts.**
Any adjacent areas dissembled, damaged, or removed by the contractor during restoration shall be properly repaired by the contractor at no expense to the Government. Any and all debris/trash generated by this project shall be removed and properly disposed of by the contractor. The contractor or his representative/Quality Assurance Person (QAP) shall be on site during duty hours or the hours of work being accomplished. The contractor shall coordinate the time that work will be accomplished with the points of contact listed. The contractor shall be responsible for daily clean up at the work site and complete restoration of the area after completion of the work. All work shall be accomplished in accordance with all Federal, state, and local laws and regulations, applicable building codes and standards, and OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) codes.
3. SUBMITTALS
Receipts indicating quantity and location of debris disposal must be sent to the POC.
5. SPECIAL REQUIREMENTS:
Anticipated equipment includes a loader and dump truck(s) to transport material. The work site shall remain clean and clutter free since this area is an active work site. National Park Service staff and vehicles may need access into and/or through the work site throughout the duration of the work.
2 | P a g e
6. POINTS OF CONTACT:
The Contractor or contractor’s manager or an alternate shall be available within sixty (60) minutes’ notice during normal duty hours, 8:30am to 5:00pm, to meet with Government personnel to discuss any problems encountered at the work site. Contractor will supply National Park Service - Contacting Officer’s representative (COR) with phone number for contacting purposes.
NPS Technical Contact:
April Felker Craters of the Moon National Monument and Preserve (CRMO) Email: April_Felker@nps.gov Phone: 208-527-6352
NPS Contracting Officer Quinn Rankin Pacific West Region – Olympic Major Acquisition Buying Office (MABO) Email: Quinn_Rankin@nps.gov Phone: 360-565-3021
7. PERFORMANCE PERIOD:
All work shall be completed within two weeks from Notice to Proceed, excluding holidays. It is anticipated for work to be completed by early September.
8. INSPECTION / ACCEPTANCE OF PROJECT COMPLETION:
A final inspection will be scheduled upon completion of all work. Contact the National Park Service - Contracting Officer’s Representative two (2) days prior to completion for a site visit.
9. Map and Pictures (3-6):
3 | P a g e
Location of CRMO Boneyard, access road, asphalt pile and cinder pile.
CRMO Boneyard area.
Cinder pile outlined in blue.
CRMO boneyard access road.
Asphalt pile outlined in green.
4 | P a g e
Asphalt pile viewed from the northeast. Approximately 7 feet tall x 10 feet wide x 90 feet long (200 cubic yards and 400 tons).
5 | P a g e
View of asphalt pile to be removed. Viewed from the northwest.
6 | P a g e
Cinders pile to be removed outlined in orange. Viewed from the south. Pile is approximately 8 feet high and approximately 30 feet by 10 feet wide. Approximately 75 cu yards and 40 tons.