Attachment 1 - Statement of Objectives - Front End Loader - CAO 16 June 2026.pdf

PDF 267 KB Posted

Attached to
Front End Loader Lease
Solicitation number
FA254326Q0033
Issued by

About this file

This is a Statement of Objectives for a US Space Force front-end loader six-month lease for snow removal operations at Buckley Space Force Base, current as of 16 June 2026.

The government requires one John Deere 644 or equivalent front-end loader with a 4.0-4.9 cubic yard bucket for a six-month lease period, along with one transportation cost line item for delivery via lowboy vehicle. The loader must be 4-wheel drive with a closed cab equipped with heat and air conditioning, manufactured in 2018 or newer, and preferably include an ACS Industries, Inc #70 Pro-series front coupler attachment. The primary objective is to enhance base personnel and equipment safety by promptly and safely clearing snow and ice from roadways, walkways, and other critical areas during winter months. Delivery to Buckley Space Force Base is required by 30 September 2026 using a lowboy delivery vehicle due to limited access and unavailable off-loading ramps. The contractor must respond to repair service calls within 48 hours. Upon delivery, government officials will accept and inspect the equipment according to specified requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVES

US Space Force

Front-End Loader Six-Month Lease for Snow Removal Current as of 16 Jun 2026

1. SCOPE: The government requires a 4-yard front end loader to enhance the safety of base personnel and equipment during winter months. Accumulated snow and ice pose significant hazards to movement and operations on Buckley SFB. A front-end loader is a critical asset for promptly and safely clearing snow from roadways, walkways and other critical are

2. REQUIREMENT:

Product Quantity John Deere 644 or equivalent front-end Loader 4.0-4.9 Cubic yard 6 Months

4 Cubic Yard Front End Loader Transportation Cost 1 Each

3. SPECIFICATIONS:

•Loader Shall have a 4-4.9 Cubic yard bucket.

•Loader Shall be 4-wheel drive.

•Loader Shall be closed cab with heat and air conditioning.

•Loader Shall be a John Deere 644 or equivalent.

•Loader, if possible, ACS industries, Inc #70 Pro-series front coupler attachment.

•Loader shall be manufactured in the year 2018 or newer.

•Upon repair service calls, contractor shall respond within 48 hrs.

4. DELIVERY:

Must be delivered to Buckley Space force Base. A lowboy delivery vehicle will be required, as there is limited access and no off-loading ramp available. The contractor shall deliver the above requirements on 30 September 2026.

Items, when delivered, will be accepted and inspected by the government officials responsible for receiving the products and performing any required inspections.

File details come from the government source that posted it. Updated .