Attachment 1 - STAMPED SPECIFICATIONS_AFRL Irish Hill Alter Repair Update Design.pdf

PDF 10 MB Posted

Attached to
Alter/Repair Irish Hill B1624 Federal contract opportunity
Solicitation number
FA875124B0002
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

This document is an attachment, titled "STAMPED SPECIFICATIONS_AFRL Irish Hill Alter Repair Update Design.pdf," which provides technical specifications and requirements for the alteration and repair of Building 1624 at the Irish Hill Test Site in Newport, NY. The related federal contract opportunity is Solicitation Number FA875124B0002, titled "Alter/Repair Irish Hill B1624."

The key details include: the requirement to furnish all labor, equipment, devices, and materials to alter and repair Building 1624, including upgrades to HVAC, power, communications, and alarms; establishing new restrooms, break room, offices, and other spaces; removing ceiling tiles, insulating the roof, installing new LED lighting, and laboratory furniture; replacing windows and exterior doors; and performing the work in accordance with the stamped specifications, drawings, and narrative. This is a 100% Small Business Set-Aside acquisition with an estimated construction value between $1,000,000 and $5,000,000. The Invitation for Bid (IFB) will be posted on SAM.gov on or about 30 May 2024, with bids due approximately 30 days later. Award will be a firm-fixed-price contract to the lowest priced responsible bidder.

View the file

Other files for this federal contract opportunity

Other files attached to Alter/Repair Irish Hill B1624, newest first.
File Type Posted
Attachment 2 - STAMPED DRAWINGS_AFRL Irish Hill Alter Repair Update Design.pdf PDF
Attachment 3 - STAMPED NARRATIVE_AFRL Irish Hill Alter Repair Update Design.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

IRISH HILL B1624 ALTERATION & REPAIR

OWNER: SUBMISSION:

FINAL SUBMISSION

SPECIFICATIONS

DIVISION 00-33

ISSUE DATE:

February 2, 2024

ARCHITECT: PROJECT LOCATION:

AIR FORCE RESEARCH LABORATORY

ROME RESEARCH SITE

ROME, NY 13441

CONSULTANTS: PROJECT INFORMATION:

MEPFP ENGINEERING CONSULTANT:

HAZARDOUS MATERIALS CONSULTING:

A/E CONTRACT #.

OWNER PROJECT #:

NKB PROJECT #:

FA8751-16-D-0002

RTWC 16-0307

(16340.01) 22440.04

PROJECT CERTIFICATION:

To the best of my knowledge, belief and professional judgment, the drawings and specifications which comprise the Construction Documents for the project are in compliance with applicable codes, including the latest editions of the International Building Code and

NFPA 101.

AFRL – Rome NY PROJECT NR: RTWC 16-0307AE

IRISH HILL B1624 ALTERATION & REPAIR 02/02/2024

TABLE OF CONTENTS 001000 - 1

SECTION 000100 - TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

000100 TABLE OF CONTENTS

000115 LIST OF DRAWING SHEETS

DIVISION 01 – GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 16 PROJECT SCHEDULE - SMALL PROJECT

01 33 00 SUBMITTAL PROCEDURES

01 35 26 SAFETY REQUIREMENTS

01 45 00 QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS WITH CHECKLIST

01 50 00 TEMPORARY FACILITIES

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 00 ASBESTOS REMEDIATION & SAMPLING RESULTS

DIVISION 3 - CONCRETE

033000 CAST-IN-PLACE CONCRETE

DIVISION 5 - METALS

053100 STEEL DECKING

054000 COLD FORMED METAL FRAMING

DIVISION 6 – WOOD, PLASTICS AND COMPOSITES

061053 MISCELLANEOUS ROUGH CARPENTRY

061600 SHEATHING

064113 WOOD-VENEER-FACED ARCHITECTURAL CABINETS

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

070150.19 PREPARATION FOR RE-ROOFING

072100 THERMAL INSULATION

072500 WEATHER BARRIERS

074646 FIBER-CEMENT SIDING

075323 ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING

076200 SHEET METAL FLASHING AND TRIM

079200 JOINT SEALANTS

DIVISION 8 – OPENINGS

081113 HOLLOW METAL DOORS AND FRAMES

081416 FLUSH WOOD DOORS

084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

085113 ALUMINUM WINDOWS

087100 DOOR HARDWARE

088000 GLAZING

DIVISION 9 – FINISHES

TABLE OF CONTENTS 001000 - 2

092216 NON-STRUCTURAL METAL FRAMING

092900 GYPSUM BOARD

093013 CERAMIC TILING

095113 ACOUSTICAL PANEL CEILINGS

096340 STONE FLOORING

096513 RESILIENT BASE AND ACCESSORIES

096519 RESILIENT TILE FLOORING

096813 TILE CARPETING

099123 INTERIOR PAINTING

DIVISION 10 – SPECIALTIES

101423 PANEL SIGNAGE

102800 TOILET, BATH AND LAUNDRY ACCESSORIES

104413 FIRE PROTECTION CABINETS

104416 FIRE EXTINGUISHERS

DIVISION 11 – EQUIPMENT

113100 RESIDENTIAL APPLIANCES

DIVISION 12 - FURNISHINGS

123661 SIMULATED STONE COUNTERTOPS

DIVISION 22 – PLUMBING

220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

220719 PLUMBING PIPING INSULATION

223000 224000

PLUMBING GENERAL

PLUMBING FIXTURES

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING

230513 230514

COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

ELECTRIC WIRING FOR HVAC EQUIPMENT

230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

230518 ESCUTCHEONS FOR HVAC PIPING

230519 METERS AND GAGES FOR HVAC PIPING

230523 GENERAL DUTY VALVES FOR HVAC PIPING

230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

230713 DUCT INSULATION

230719 HVAC PIPING INSULATION

230900 INSTRUMENTATION AND CONTROL FOR HVAC

231126 FACILITY LIQUEFIED-PETROLEUM GAS PIPING

232113 HYDRONIC PIPING

232116 HYDRONIC PIPING SPECIALITIES

232123 HYDRONIC PUMPS

232300 REFRIGERANT PIPING

233113 METAL DUCTS

233300 233423

AIR DUCT ACCESSORIES

HVAC POWER VENTILATORS

233713 233723

DIFFUSERS, REGISTERS AND GRILLES

HVAC GRAVITY VENTILATORS

235216 CONDENSING BOILERS

236200 PACKAGED CONDENSING UNIT

237313 238113

MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNIT

DUCTLESS SPLIT AC UNIT

TABLE OF CONTENTS 001000 - 3

238223 CONVECTORS

238236 FINNED-TUBE RADIATION HEATERS

239119 FIXED LOUVERS

DIVISION 26 – ELECTRICAL

260513 260519

MEDIUM-VOLTAGE CABLES

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260523 CONTROL-VOLTAGE ELECTRICAL POWER CABLES

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

260533 260534 260535

CONDUITS FOR ELECTRICAL SYSTEMS

BOXES AND COVERS FOR ELECTRICAL SYSTEMS

SURFACE RACEWAY FOR ELECTRICAL SYSTEMS

260543 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS

260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

260923 261213

LIGHTING CONTROL DEVICES

LIQUID FILLED, MEDIUM VOLTAGE TRANSFORMERS

262213 LOW-VOLTAGE DISTRIBUTION TRANSFORMER

262413 SWITCHBOARDS

262416 PANELBOARDS

262500 ENCLOSED BUS ASSEMBLIES

262726 WIRING DEVICES

262816 262913 263213 263600

ENCLOSED SWITCHES

MANUAL AND MAGNETIC MOTOR CONTROLLERS

DIESEL ENGINE DRIVEN GENERATOR SETS

TRANSFER SWITCHES

264113 LIGHTNING PROTECTION FOR STRUCTURES

265119 LED INTERIOR LIGHTING

265219 EMERGENCY AND EXIT LIGHTING

265619 LED EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

270526 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS

271100 271300

COMMUNICATIONS EQUIPMENT ROOM FITTINGS

BACKBONE CABLING

271500 HORIZONTAL CABLING

271700

TESTING AND IDENTIFICATION

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

283111 DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

DIVISION 31 – EARTHWORK

310000

EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

321000 321200

ROADWAY AND MISCELLANEOUS SURFACE SUBBASE

ASPHALT CONCRETE PAVING AND SURFACING

TABLE OF CONTENTS 001000 - 4

THIS PAGE INTENTIONALLY LEFT BLANK

LIST OF DRAWING SHEETS 000115 - 1

SECTION 000115 - LIST OF DRAWING SHEETS

A. Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Table of Contents page of the separately bound drawing set titled IRISH HILL B1624 ALTERATION & REPAIR, dated 02/02/2024, and as modified by subsequent Addenda and Contract modifications.

A. List of Drawings: Drawings consist of the following Contract Drawings and other drawings of type indicated:

GENERAL

DRAWING LIST

SHEET NUMBER SHEET NAME

GENERAL

G-001 COVERSHEET

CIVIL

C001 EXISTING SITE PLAN

STRUCTURAL

S100 STRUCTURAL JOIST REINFORCING PLAN AND DETAIL

ARCHITECTURAL

A001 GENERAL NOTES, SYMBOLS & ANNOTATIONS

A002 PARTITION TYPES

A003 CODE REVIEW & EGRESS PLAN

A04 CODE SCHEDULE

AD100 DEMOLITION PLANS

AD101 ROOF DEMOLITION PLANS

AE100 NEW CONSTRUCTION PLANS

AE101 NEW CONSTRUCTION CEILING PLAN

AE102 ROOF NEW CONSTRUCTION PLANS

AE201 EXTERIOR ELEVATIONS

AE202 EXTERIOR ELEVATIONS

AE301 BUILDING SECTIONS

AE401 ENLARGED PLANS & INTERIOR ELEVATIONS

AE402 INTERIOR ELEVATIONS

AE403 INTERIOR ELEVATIONS

AE501 WALL SECTIONS

AE502 WALL SECTIONS

LIST OF DRAWING SHEETS 000115 - 2

AE503 DETAILS

AE504 DETAILS

AE505 ROOF DETAILS

AE601 DOOR AND HARDWARE SCHEDULES & DETAILS

AE602 WINDOW SCHEDULE AND DETAILS

AE603 ROOM FINISH AND ACCESSORIES SCHEDULES

AI101 FURNITURE & EQUIPMENT (NIC)

AI102 FINISH PLAN

PLUMBING

P001 SYMBOLS, ABBREVIATIONS, DETAILS, NOTES AND RISER DIAGRAMS

PD101 PLUMBING DEMOLITION PLAN

P101 PLUMBING UNDER SLAB PLAN

P102 PLUMBING FLOOR PLAN

MECHANICAL

M001 SYMBOLS, ABBREVIATIONS AND NOTES

MD101 HVAC DEMOLITION PLAN

M101 HVAC FLOOR PLANS

M401 ENLARGED MECHANICAL ROOM AND HVAC SECTIONS

M501 DETAILS

M502 DETAILS

M601 SCHEDULES

ELECTRICAL

E001 SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

ED101 DEMOLITION FLOOR PLAN

E101 LIGHTING FLOOR PLAN

E102 POWER, COMMUNICATIONS & SECURITY FLOOR PLAN

E103 FIRE ALARM, SECURITY & SPEAKER FLOOR PLAN

E501 DETAILS

E502 DETAILS

E503 DETAILS

E601 ONE LINE DIAGRAMS

E602 SCHEDULES

E603 FIRE ALARM RISER DIAGRAM

Grand total: 50

END OF SECTION 000115

AFRL � Rome NY PROJECT NR: RTWC160307AE

ALTER/ REPAIR B1624, IRISH HILL 02/02/2024

Summary of Work Section 01 11 00

SECTION 01 11 00

SUMMARY OF

WORK

08/15

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval and for information only.

When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

Project Title: IRISH HILL B1624 ALTERATION & REPAIR

Project Number: RTWC 16-0307AE.

The work includes:

1. Renovation of existing building B1624 to the extent as indicated on the Contract Drawings.

2. Building requires abatement activities prior to demolition.

3. Existing site restoration following building demolition.

4. Site development for the construction of new work, including septic systems.

5. Construction of new entry vestibule structure.

and incidental related work, as indicated in the Construction Documents.

Green Procurement Requirements: The Contractor shall comply with the United States Environmental Protection Agency Comprehensive Procurement Guidelines (CPG).

The EPA's list of designated products grouped into 8 categories and the accompanying recycled-content recommendations listed below:

http://www.epa.gov/cpg/products.htm

1. Construction Products

2. Landscaping Products

3. Non-paper Office Products

4. Paper and Paper Products

5. Park and Recreation Products

6. Transportation Products

7. Vehicular Products

8. Miscellaneous Products

The contractor shall estimate the amount of recycled material that was used in the project and provide the estimate as an official submittal to Contracting. The contractor shall also provide certification in the form of a label on the product, or a statement verified by the vendor and attached to the proposal documents. Measurement of recovered material content should be made in accordance with standard industry practice. The certification on multi-component or multi-material products must verify the percentage of post-consumer waste and recycled material contained in the major constituents of the product.

1.2.2 Location

The work is located at Irish Hill / Newport Test Site, as indicated in these Construction Documents.

1.3 OCCUPANCY OF PREMISES

Building(s) and the surrounding site will be occupied during performance of work under this Contract. The Contractor�s primary points of contact, the Contracting Officer (CO), and the Contracting Officer Representative (COR), will post contractor notifications to occupants as required, in a prominent location in the work area, and at entrances to the building.

Before work is started, arrange with the CO and the COR a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.4 EXISTING CONDITIONS

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Provide work indicated in the Construction Documents in such a manner as to prevent injury or damage to any portions of the existing conditions which remain.

b. Repair or replace portions of existing conditions which have been damaged or altered during construction operations, to match existing or adjoining work, as approved by the Contracting Officer (CO).

1.5 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground, deck, or paved surface where existing underground utilities are discovered.

Verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.

Verify elevations before installing proposed work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.5.1 Notification Prior to Excavation

Notify the CO and COR at least 48 hours prior to starting any excavation work.

1.6 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Construction Documents to be salvaged (and turned over to the Government) remain the property of the Government. Segregate, itemize, deliver, and off-load the salvaged property at the Government designated storage area.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location.

Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

AFRL � Rome NY PROJECT NR: RTWC 16-0307AE

WORK RESTRICTIONS 011400 - 1

SECTION 01 14 00

WORK RESTRICTIONS

11/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of these specifications to the extent referenced and incorporated by reference.

AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)

ANSI/AHRI 210/240 (2008; Add 1 2011; Add 2 2012) Performance Rating of Unitary Air-Conditioning & Air-Source Heat Pump Equipment

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)

ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures

INTERNATIONAL CODE COUNCIL (ICC)(All Sections)

` ICC IBC (Latest) International Building Code and associated family of Codes (IEBC, IECC, IFC, IMC, IPC) - as well as all the codes and standards incorporated by reference

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)(All Sections)

NFPA 70 (2019; TIA 19-1; TIA 19-2; TIA 19-3; TIA

19-4; ERTA 1 2019) National Electrical Code

NFPA 90A (2018) Standard for the Installation of Air Conditioning and Ventilating Systems

NFPA 101 (2018; TIA 18-1; TIA 18-2; TIA 18-3) Life Safety Code

NAVAL FACILITIES ENGINEERING AND EXPEDITIONARY WARFARE CENTER

(NAVFAC EXWC)

NFESC UG-2029-ENV (1998) Cross-Connection Control and Backflow Prevention Program Implementation at Shore Facilities, User's Guide

U.S. Code (USC)

8 USC 1101 Definitions

10 USC 6011 Navy Regulations

U.S. DEPARTMENT OF DEFENSE (DOD)(All Sections)

WORK RESTRICTIONS 011400 - 2

UFC 3-301-01 (2019) Structural Engineering

U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD)

24 CFR 3280 (2019) Manufactured Home Construction and Safety Standards

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval and for information only.

When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel; G

1.3 SPECIAL SCHEDULING REQUIREMENTS

a. Permission to interrupt any active gates, roads, railroads, or utility services must be requested in writing a minimum of 14 calendar days prior to the desired date of interruption.

1.4 CONTRACTOR ACCESS AND USE OF PREMISES

1.4.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.4.1.1 Subcontractors and Personnel Contacts

Provide a complete list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct, and change the information contained in previous lists.

1.4.1.2 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.4.2 Working Hours

Regular working hours are between 0700 / 7:00 a.m. and 1600 / 4:00 p.m. Monday through Friday, excluding Federal Government holidays. The government may restrict access to work sites to these hours and days, except where alternative arrangements are made.

Legal Holidays: The AFRL recognizes the following legal holidays:

WORK RESTRICTIONS 011400 - 3

New Year's Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth Day 19 June Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran's Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

1.4.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval. Make application / request 14 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress - or that the proposed work will cover, giving the specific dates, hours, location, type of work to be performed, contract number and project title.

Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.

Make utility shutdowns and cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.4.4 Occupied Building[s]

The Contractor shall be working around existing buildings which are occupied. Do not enter the building[s] without prior approval of the Contracting Officer.

The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Provide dust covers or protective enclosures to protect existing conditions and Government material that are to remain in the work area during the construction period.

When indicated in the Construction Documents, relocate movable furniture and equipment out from the work area, protect the furniture, and replace the furniture as indicated, upon completion of the work.

Leave attached equipment in place, and protect against damage, or temporarily disconnect, relocate, protect, and reinstall at the completion of the work, with prior approval of the Contracting Officer.

The Government will remove and relocate Government property in the work areas as indicated in the Construction Documents.

1.4.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE

REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, sprinklers, telephone service, electric

WORK RESTRICTIONS 011400 - 4

service, air conditioning, heating, fire alarm, compressed air, and natural gas, are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.

Submit written request to the CO and the Contracting Officer's Representative (COR) fourteen (14) days prior to all utility cutovers and interruptions. The request shall give the following information: Location of shut-off, Services and areas affected, Hour, date, and duration of shut-off.

Submit a written method of procedure to the CO and COR for approval. Do not proceed:

Services shall not be interrupted until receipt of approval of the proposed hours and date from the CO and COR. If utility services are damaged by the contractor, the contractor shall restore them within 24 hours. Execute all work in a thoughtful, organized, expeditious fashion to minimize downtime.

Provide piping connections with public and/or site utilities providers (water supply, sanitary drainage, storm drainage, steam, steam condensate, heating hot water, chilled water, condenser water, heat pump loop water, natural gas, propane gas, fuel oil, and air distribution connections) in accordance with the sizes and locations shown in the construction documents, in strict compliance with the rules and regulations set forth by the local Authority Having Jurisdiction (AHJ) and the utility provider, complete with test and final connections, with provisions for shut-off, isolation, and adapters as required.

Disruptions to life safety systems (fire alarm/fire suppression systems) shall be restored to functional status at the end of each workday. For an exemption to the requirements of this paragraph, submit a written request to the CO and COR for approval.

AFRL will pay all public utility charges related to permanent service.

d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, HVAC, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

1.5 SECURITY REQUIREMENTS

Contract Clause FAR 52.204-2 Security Requirements and Alternate II and the following apply:

The work to be done on this project is located in and around area's that are under the scrutiny of the Department of Defense Police assigned to the AFRL Information Directorate.

To gain access to the area(s) to examine the work to be done for job estimation purposes;

arrangements must be made through the Contracting Officer. Contractor personnel will be escorted into the area(s) for the purpose of project estimation.

Required forms will be forwarded requesting the needed information for site access.

AFRL/RI visitors must request access to our facility via the link below:

https://dbids-global-enroll.dmdc.mil/

Once all screens on the site are completed, a QR code will generate. This QR code should then be sent via email to the facility sponsor / Contracting Officer and will also need to be printed out to have the day of visit. Once the email is sent to the sponsor / Contracting Officer they will do what is needed.

If you have multiple individuals needing access for the same event / reason they must all complete the request via the link and one email can be sent with all individuals names and QR code generated for them.

WORK RESTRICTIONS 011400 - 5

On the Day of the visit:

Visitors need to report to the Visitor Control Center (VCC) located just outside the fence, next to the new Installation Access Control Point (IACP) � request a map / diagram from your sponsor.

Visitors will present a Driver's License / ID and their QR Code confirmation page to the VCC representative.

Visitors will be provided the appropriate credential / badge and be directed to their Sponsor's entry facility.

RI Sponsors will meet their Visitors at the Building 3 Main Lobby.

Long duration work badges will be accomplished latter after initial access.

The following is the guidance on how Non-CAC visitors will receive their DBIDS card.

Step 1: Sponsors will refer their visitors to https://dbids-global-enroll.dmdc.mil to pre-register their information.

Step 2: Once complete visitors will email the QR code and 6 digit code to their sponsor.

Step 3: The Sponsor will notify the Visitor Center via digitally signed email at AFRL/RIOFSP VCC, afrl.riofsp.vcc@us.af.mil - with the following:

- Names of visitors

- QR code

- Six digit code

- Date of visit

- Length of visit

- Is facility access needed? Simply indicate, Yes/No for Facility access.

Step 4: The VCC will notify the sponsors receipt of their visitor information.

The Visitor Center is located at

Building 103:

304 Brooks Road Rome, NY 13442.

The hours of operation are: 0700-1530

Visitors who are granted access will get one of the following:

-DBIDS Paper Pass: Visit is 7 days or less.

-DBIDS Card (Non-Proximity): Visit is more than 7 days (no facility access).

-DBIDS Proximity Card: Visit is more than 7 days and requires facility access.

We ask that all visit request information be sent to the Visitor Center five days in advance. If a sponsor has five or more visitors needing entry we will need this information 10 days in advance.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

WORK RESTRICTIONS 011400 - 6

ADMINISTRATIVE REQUIREMENTS 013000 - 1

SECTION 01 30 00

ADMINISTRATIVE

REQUIREMENTS

08/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

15 CFR 772 Definition of Terms

15 CFR 773 Special Licensing Procedures

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only.

Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

View Location Map; G

Progress and Completion Pictures; G

1.3 PROGRESS AND COMPLETION PICTURES

Photographically document existing conditions prior to start of construction operations. Submit monthly, and within one month of the completion of work, digital photographs, in JPEG file format showing the sequence and progress of work.

Take a minimum of 20 digital photographs each week throughout the entire project, from a minimum of ten views, from points agreed to by the Contractor, the Contracting Officer and the

COR.

Submit with the monthly invoice, digital photographs, on a compact disc (CD) or data versatile disc (DVD), cumulative of all photos to date. Indicate photographs demonstrating environmental procedures. Review with The Government the possibility of digital transfer rather than disc submission. Note: jump drives and data sticks are not allowed.

Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch file in each submission. Include a date designator in file names. Cross reference submittals in the appropriate daily report. Photographs provided are for unrestricted use by the Government.

ADMINISTRATIVE REQUIREMENTS 013000 - 2

1.4 MINIMUM INSURANCE REQUIREMENTS

Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by the Contracting Officer and State law.

1.5 SUPERVISION

1.5.1 Minimum Communication Requirements

Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.

1.5.2 Superintendent Qualifications

The project superintendent must have a minimum of 10 years� experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity to this one.

The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction documents. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project.

For projects where the superintendent is permitted to also serve as the Quality Control (QC) Manager as established in Section 01 45 00.00 QUALITY CONTROL, the superintendent must have qualifications in accordance with that section.

1.5.2.1 Duties

The project superintendent is primarily responsible for managing and coordinating - day-to-day activities, access, production, behavior, and schedule adherence of all construction personnel (prime and subs) on the project. The superintendent is required to attend Project Meetings, partnering meetings, and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.

1.5.3 Non-Compliance Actions

The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project, and sub-contractors, to insure timely completion. Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.

1.6 PRECONSTRUCTION

After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer and their designated persons to discuss and develop a mutual understanding and expectations relative to the administration of the construction, discovered conditions, RFI's, value engineering, safety program, preparation of the schedule of values, shop drawings and other submittals, scheduling programming, execution of the work, and clear expectations of the "Interim DD Form 1354" Submittal. Major subcontractors who will be engaged in the work must also attend.

1.7 PARTNERING

ADMINISTRATIVE REQUIREMENTS 013000 - 3

To most effectively accomplish this contract, the Government requires the formation of a cohesive partnership within the Project Team whose members are from the Government, and the Contractor and their Subcontractors. Key personnel from the Supported Command, the End User (who will occupy the facility), the Government Design and Construction team and Subject Matter Experts, the Installation, the Contractor and Subcontractors, and the Designer of Record will be invited to participate in the Partnering process. The Partnership will draw on the strengths of each attendee in an effort to achieve successful project completion, without safety mishaps, that conforms to the Contract, and stays within budget, and on schedule. The Contracting Officer will provide Information on the Partnering Process and a list of key and optional personnel who should attend the Partnering meeting.

1.7.1 Partnering Sessions

The Contracting Officer will organize the Partnering Sessions with key personnel of the project team, including Contractor personnel and Government personnel.

The Initial Partnering session will be a part of the Pre-Construction Meeting. Partnering sessions will be held at a location agreed to by the Contracting Officer and the Contractor (typically a conference room provided by the Government). The Initial Partnering Session may be conducted and facilitated using electronic media (a video and accompanying forms) provided by the Contracting Officer. This activity may be conducted by the same persons and at the same intervals as the regularly scheduled project meetings.

1.8 ELECTRONIC MAIL (E-MAIL) ADDRESS

Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments as text files, pdf files, and other similar formats. Within 10 days after contract award, provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as weather, hurricanes, or physical threats. Multiple email addresses are not allowed.

It is the Contractor's responsibility to make timely distribution of all correspondence within its own organization including sub-contractors and field office(s). Promptly notify the Contracting Officer, in writing, of any changes to this email address.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

ADMINISTRATIVE REQUIREMENTS 013000 - 4

PROJECT SCHEDULE 013216 - 1

SECTION 01 32 16

PROJECT SCHEDULE

08/18

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval or for information only.

When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Baseline Construction Schedule; G

SD-07 Certificates

Monthly Updates

1.2 PRE-CONSTRUCTION SCHEDULE REQUIREMENT

Prior to the start of work, prepare and submit to the Contracting Officer a Baseline Construction Schedule in the form of a Bar Chart Schedule in accordance with the terms in Contract Clause FAR 52.236-15 Schedules for Construction Contracts, except as modified in this contract. The approval of a Baseline Construction Schedule is a condition precedent to:

a. The Contractor starting demolition work or construction stage(s) of the contract.

b. Processing Contractor's invoice(s) for construction activities/items of work.

c. Review of any schedule updates.

Submittal of the Baseline Construction Schedule, and subsequent schedule updates, is understood to be the Contractor's certification that the submitted schedule meets the requirements of the Contract Documents, represents the Contractor's plan on how the work will be accomplished, and accurately reflects the work that has been accomplished and how it was sequenced (as-built logic).

1.3 SCHEDULE FORMAT

1.3.1 Bar Chart Schedule

The Bar Chart must, as a minimum, show work activities, submittals, Government review periods, material/equipment delivery, utility outages, on-site construction, inspection, testing, and closeout activities.

The Bar Chart must be time scaled and generated using an electronic spreadsheet program.

(Microsoft Project - or equal).

1.3.2 Schedule Submittals and Procedures

Submit Schedules and updates electronically, in the format as acceptable to the Contracting Officer

PROJECT SCHEDULE 013216 - 2

and the COR.

1.4 SCHEDULE MONTHLY UPDATES

Update the Construction Schedule at monthly intervals or when the schedule has been impacted and requires revision. Keep the schedule updated and current, reflecting actual activity progress and plan for completing the remaining work. Submit copies of purchase orders and confirmation of delivery dates as directed by the Contracting Officer.

a. Narrative Report: Identify and justify the following:

(1) Progress made in each area of the project.

(2) Longest Path: Include printed copy on 11 by 17-inch paper, landscape setting;

(discuss electronic submission prior to progress meetings)

(3) Date/time constraint(s), other than those required by the contract.

(4) Listing of changes made between the previous schedule and current updated schedule including added or removed activities, original and remaining durations for activities that have not started, logic (sequence, constraint, lag/lead), milestones, planned sequence of operations, longest path, calendars or calendar assignments, and cost loading.

(5) Any decrease in previously reported activity Earned Amount.

(6) Pending items and status thereof, including permits, changes orders, and time extensions.

(7) Status of Contract Completion Date and interim milestones.

(8) Current and anticipated delays (describe cause of delay and corrective actions(s) and mitigation measures to minimize);

(9) Description of current and future schedule problem areas.

For each entry in the narrative report, cite the respective Activity ID and Activity Name, the date and reason for the change, and description of the change.

1.5 3-WEEK LOOK AHEAD SCHEDULE

Prepare and electronically submit a 3-Week Look Ahead schedule to provide a more detailed day-to-day plan of upcoming work identified on the Construction Schedule. Key the work plans to activity numbers when a NAS is required and update each week to show the planned work for the current and following two-week period. Additionally, include upcoming outages, closures, preparatory meetings, and initial meetings.

Identify critical path activities on the Three-Week Look Ahead Schedule. The detail work plans are to be bar chart type schedules, maintained separately from the Construction Schedule.

Activities must not exceed 5 working days in duration and have sufficient level of detail to assign crews, tools and equipment required to complete the work.

Submit electronic file of the 3-Week Look Ahead Schedule to the Contracting Officer no later than 8 a.m. each Monday, and review during the weekly CQC Coordination or Production Meeting.

1.6 CORRESPONDENCE AND TEST REPORTS:

Correspondence (e.g., letters, Requests for Information (RFIs), e-mails, meeting minute items, PROJECT SCHEDULE 013216 - 3

Production and QC Daily Reports, material delivery tickets, photographs) must reference Schedule Activities that are being addressed. Test reports (e.g., concrete, soil compaction, weld, pressure) must reference Schedule Activities that are being addressed.

1.7 ADDITIONAL SCHEDULING REQUIREMENTS

Any references to additional scheduling requirements, including systems to be inspected, tested and commissioned, that are located throughout the remainder of the Contract Documents, are subject to all requirements of this section.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

PROJECT SCHEDULE 013216 - 4

SUBMITTAL PROCEDURES 013300 - 1

SECTION 01 33 00

SUBMITTAL

PROCEDURES

08/18, CHG 4: 02/21

PART 1 GENERAL

1.1 SUMMARY

1.1.1 Submittal Information

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

1.1.2 Project Type

The Contractor's Quality Control (CQC) System Manager(s) are to check and approve all items before submittal - and stamp, sign, and date indicating action taken.

Proposed deviations from the contract requirements are to be clearly identified.

1.1.3 Submission of Submittals

Schedule and provide submittals requiring Government approval before acquiring the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Safety Data Sheets (SDS) and in compliance with existing laws and regulations.

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:

SD-01 Preconstruction Submittals

Submittals that are required prior to or commencing with the start of work on site.

Preconstruction Submittals include schedules and a tabular list of locations, features, and other pertinent information regarding products, materials, equipment, or components to be used in the work.

Certificates Of Insurance

Surety Bonds

List Of Proposed Subcontractors

List Of Proposed Products

SUBMITTAL PROCEDURES 013300 - 2

Initial Project Schedule

Submittal Register

Schedule Of Prices Or Earned Value Report

Accident Prevention Plan

Health And Safety Plan

Work Plan

Quality Control (QC) plan

Environmental Protection Plan [Explosive Safety Submission ESS Work Plan]

SD-02 Shop Drawings

Drawings, diagrams, and schedules specifically prepared to illustrate some portion of the work.

Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.

Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.

Samples of warranty language when the contract requires extended product warranties.

SD-04 Samples

Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.

Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.

Field samples and mock-ups constructed on the project site establish standards ensuring work can be judged. Includes assemblies or portions of assemblies that are to be incorporated into the project and those that will be removed at conclusion of the work.

SD-05 Design Data

Design calculations, mix designs, analyses or other data pertaining to a part of work.

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product, or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.

SUBMITTAL PROCEDURES 013300 - 3

Report that includes findings of a test required to be performed on an actual portion of the work or prototype prepared for the project before shipment to job site.

Report that includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

Investigation reports, Daily logs, and checklists

Final acceptance test and operational test procedure

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.

Confined space entry permits

Text of posted operating instructions.

SD-08 Manufacturer's Instructions

Preprinted material describing installation of a product, system, or material, including special notices and (SDS)concerning impedances, hazards, and safety precautions.

SD-09 Manufacturer's Field Reports

Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.

Factory test reports.

SD-10 Operation and Maintenance Data

Data provided by the manufacturer, or the system provider, including manufacturer's help and product line documentation, necessary to maintain and install equipment, for operating and maintenance use by facility personnel.

Data required by operating and maintenance personnel for the safe and efficient operation, maintenance, and repair of the item.

Data incorporated in an operations and maintenance manual or control system.

SD-11 Closeout Submittals

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.

SUBMITTAL PROCEDURES 013300 - 4

Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).

Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.

1.2.2 Approving Authority

Office or designated person authorized to approve the submittal.

1.2.3 Work

As used in this section, on-site and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction. In exception, excludes work to produce SD-01 submittals.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or �S� classification are required submittals that will not be marked for approval, � but are for Contractor Quality Control approval and for information only.

When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Submittal Register; G

1.4 SUBMITTAL CLASSIFICATION

1.4.1 Government Approved (G)

Government approval is required for extensions of design, critical materials, variations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Government.

Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, submittals are considered to be "shop drawings."

1.4.3 For Information Only

Submittals not requiring Government approval will be for information only. Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are not considered to be "shop drawings."

1.5 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL

As soon as practicable after award of contract, and before procurement or fabrication, forward to the Contracting Officer, the submittal register, all administrative submissions, and then submittals required in the technical sections of this specification, including shop drawings, product data and samples. The Contracting Officer will forward to the appropriate reviewing party.

SUBMITTAL PROCEDURES 013300 - 5

1.5.1 O&M Data

Submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.

In the event the Contractor fails to deliver O&M data within the time limits specified, the Contracting Officer may withhold from progress payments 50 percent of the price of the items to which such O&M data apply.

1.6 PREPARATION

1.6.1 Transmittal Form

Transmit each submittal, or related grouping of submittals, except sample installations and sample panels to the Contracting Officer using the transmittal form prescribed by the Contracting Officer.

Include all information prescribed by these specifications.

1.6.2 Identifying Submittals

The Contractor's Quality Control Manager must prepare, review and stamp submittals, including those provided by subcontractors, before submitting to the Government.

Do not submit items that are incomplete or that do not meet the requirements of the Construction Documents.

Identify submittals, except sample installations and sample panels, with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal form. Mark each copy of each submittal identically, with the following:

a. Project title and location

b. Construction contract number

c. Dates of the drawings and revisions

d. Name, address, and telephone number of Subcontractor, supplier, Manufacturer, and any other Subcontractor associated with the submittal.

e. Section number of the specification by which submittal is required.

f. Submittal description (SD) number of each component of submittal

g. For a resubmission, add alphabetic suffix on submittal description, for example, submittal 18 would become 18A, to indicate resubmission.

h. Product identification and location in project.

1.6.3 Submittal Format

1.6.3.1 Format of SD-01 Preconstruction Submittals

When the submittal includes a document that is to be used in the project, or is to become part of the project record, other than as a submittal, do not apply the Contractor's approval stamp to the document itself, but to a separate sheet accompanying the document.

Provide data in the unit of measure used in the contract documents.

SUBMITTAL PROCEDURES 013300 - 6

1.6.3.2 Format for SD-02 Shop Drawings

Provide shop drawings not less than 8 1/2 by 11 inches nor more than 30 by 42 inches, except for full-size patterns or templates. Prepare drawings to accurate size, with scale indicated, unless another form is required.

Ensure drawings are suitable for reproduction and of a quality to produce clear, distinct lines and letters, with dark lines on a white background.

a. Include the nameplate data, size, and capacity on drawings. Also include applicable federal, military, industry, and technical society publication references.

b. Dimension drawings, except diagrams and schematic drawings.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .