Attachment 1 - Specifications.pdf
PDF 233 KB Posted
- Attached to
- Pulse Generator Federal contract opportunity
- Solicitation number
- NB672020-26-02355
About this file
This is a Requirements/Specification Document issued by the National Institute of Standards and Technology (NIST) for the procurement of a Pulse Generator to support the Electromagnetic Fields Group's Rydberg Research and Multiple Operational Agreement (OA) Projects.
Product and Technical Requirements:
The procurement requires one (1) high-voltage, unipolar pulse generator with nanosecond pulse width capabilities. The pulse generator must deliver a maximum output exceeding 10 kV into 50 Ohms with a 100 picosecond rise time and 3 nanosecond decay time. Additional specifications include a 1 kHz repetition rate, single shot mode capability, N-type (HN) output connector, and dual internal and external trigger options. The unit must operate on standard 100-240 VAC 50-60Hz power at less than 5 amps, fit in a standard 19-inch rack (3U height), and weigh no more than 7.5 kilograms.
Vendor Requirements and Delivery Terms:
At the time of award, vendors must possess an Export Control Classification Number (ECCN) and an active Unique Entity Identification Number (UEI) registered on the GSA System for Award Management (SAM.gov). Delivery is directed to NIST's Boulder, Colorado facility at 325 Broadway, Boulder, CO 80305, with acceptance expected within 7 business days. No installation services, training, maintenance plans, calibration services, or vendor on-site support are required. The base manufacturer warranty is acceptable, though no specific warranty length or coverage details are mandated in the document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NB672020-26-02355 - RFQ.pdf | ||
| Attachment 2 - Provisions and Clauses.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document
TITLE: Pulse Generator
Requesting Laboratory / Division / Group:
Communications Technology Laboratory Radio Frequency Technology Division Electromagnetic Fields Group (672.02)
General Statement of Need:
The Electromagnetic Fields Group requires a high-voltage, unipolar pulse generator with a nanosecond pulse width to support Rydberg Research / Multiple OA Projects.
Item Specifications and Quantities:
Item 1: Pulse Generator Quantity: 1 EACH Specifications: 1.1 Maximum pulse output > 10 kV in 50 Ohms
1.2 100 ps rise time
1.3 3 ns decay time
1.4 Repetition rate 1 kHz
1.5 Single shot Mode
1.6 Output high voltage N-type (HN)
1.7 Internal and external trigger options
1.8 Input power 100 to 240 VAC 50 to 60Hz at <5 amps
1.9 Fits 19” rack 3U
1.10 Weight =< 7.5 kg
Vendor Requirements
1. Possess at time of award/contracting an Export Control Classification Number (ECCN).
2. Possess at time of award/contracting a Unique Entity Identification Number (UEI) which registration is listed as “Active” on the GSA System for Award Management (SAM.gov).
Procurement Support Information and Ancillary Services:
Section Requirements/Specifications
Planning Considerations
☐ List any visits required to allow potential vendors to see site specific constraints.
☒ N/A [Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☐ Other Considerations:
[List other considerations to ensure an accurate quote.]
Shipping & Delivery ☐ N/A
Shipping Address:
☒ NIST-Boulder
ATTN: TBA
Mail Stop: TBA 325 Broadway Boulder, CO 80305
☐ NIST-Gaithersburg
ATTN:
Mail Stop:
100 Bureau Dr Gaithersburg MD 20899
☐ [Alternate Shipping Address] Shipping Criteria:
☐ Partial Delivery Acceptable
☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]
Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock
Containerization Preference: [Enter Container Type] Other Requirements:
[List Any Other Requirement] Delivery Date Criteria:
☐ Delivery Shall Be Competed No Later Than:
Click or tap to enter a date.
☐ Delivery Shall Be Made No Earlier Than:
Click or tap to enter a date.
☐ Scheduled Deliveries:
Item Number Due Date
☐ Other:
[List Other Shipping, Delivery or Special Requirements.]
Electronic Media ☒ N/A
[Enter Electronic Media Requirements by Item.]
☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:
[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:
[Enter Address]
Installation ☒ N/A
[Enter Installation Requirements by Item]
☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:
[Enter Details] NOTE: TPOC shall be the coordination POC.
Facility / Utility Considerations ☒ N/A
[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers
[List Work Order Numbers]
☐ Power Available
Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]
Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment]
Other Power Considerations:
[List Any Other Power Considerations.]
☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]
☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.]
Inspection and Acceptance ☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site
☒ Acceptance Not Expected to Exceed 7 Business Days
☐ Acceptance Expected to Exceed 7 Business Days:
[Duration]
☐ Inspection and Acceptance Plan:
[Explanation]
[Enter Other Requirements]
Training
Training Requirements (Who, When, What, Where)
☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site
☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting
☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:
[Describe Materials] ☐ Training Materials to be Provided by Vendor:
[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: SME shall be coordination POC.
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable Warranty Length: [i.e. 3 - Years] What is included?
☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns
☐ Other [Enter Other Requirements]
☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)
Calibration
[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Maintenance
[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Government Furnished Material / Equipment ☒ N/A
List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing
☐ Equipment which will leave Government Site
Description:
Serial Number:
NIST Property Number:
[Enter Description] [Enter Serial Number] [Enter NIST Property Number]
☐ Other: [Enter Other Details]
Travel
[Describe any Travel Requirements Per Item] ☐ Explain:
[Enter Justification / Requirement]
[Enter Other Requirements]
NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.
File details come from the government source that posted it. Updated .