Attachment_1_-_Specifications.pdf
PDF 280 KB Posted
- Attached to
- BLM-WY BUFFALO FIELD OFFICE FENCING MATERIALS
- Solicitation number
- 140L6225Q0024
About this file
This document is a detailed specification sheet for fence materials for the BLM Wyoming Buffalo Field Office. The solicitation requires a total of 6,979 individual fence components to be delivered to two locations in Wyoming: Buffalo and Gillette. The specific items include:
- Steel Brace Posts (Long and Short): 663 total posts (490 long posts, 173 short posts) made from recycled or new Oil Company Tubular Goods (OCTG) steel pipe, with specific requirements for condition, wall thickness, and radiation levels. 2. Steel Brace Rails: 267 9-foot tubular steel rails with specific mounting capabilities. 3. In-Line Steel Tubular Posts: 395 9-foot posts similar to brace posts. 4. Steel T-Posts: 5,400 heavy-duty 5.5-foot painted posts meeting ASTM A702 standards. 5. Wire: 344 total units of wire, including 128 heavy-duty barbless wire and 216 heavy-duty barbed wire. Delivery is required by June 1, 2025, with specific delivery hours (8:00 am to 5:00 pm Mountain Standard Time, Monday through Thursday) and a requirement to coordinate delivery 5 days in advance. The solicitation is a small business set-aside with a firm-fixed price contract anticipated.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L6225Q0024_Amd_0001.pdf | ||
| Attachment_4_Questions_Addressed_0001.pdf | ||
| Attachment_3-_Clauses_and_Provisions.pdf | ||
| Attachment_2_-_Bid_Schedule.xlsx | XLSX spreadsheet | |
| Sol_140L6225Q0024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BFO ESR Fence Material Specifications. Note the two separate delivery locations and quantity for each location.
Delivery must be coordinated 5 days in advance of delivery date and delivery hours are 8:00 am to 5:00 pm (Mountain Standard Time) Monday thru Thursday.
Delivery Location #1 (Buffalo): 780 Volunteer Lane, Buffalo, WY 82834 Delivery Location #2 (Gillette): 5901 Hannum Road, Gillette, WY 82716
Item 1. Steel Brace Post (Long) 2-7/8” by 9’ (TOTAL Quantity: 490)
Steel Brace Posts (Long): Shall be 2-7/8” outside diameter, (OD) by 0.217” minimum wall thickness, by 9’ in length, Oil Company Tubular Goods (OCTG) steel pipe. Pipe shall be used/recycled structural OCTG casing or drill pipe in sound structural condition, clean and radiation free (<12 µR/hr.), or new reject pipe, or unused surplus pipe. Surface rust is acceptable; however, any material that is excessively pitted, rusty, flaking, peeling, or corroded will be rejected. Pipe with splits, bends, or thin spots (hot spots) will not be accepted. Pipe shall be free from oil debris. All pipe that is concrete lined, lined with any synthetic material, has holes or perforations shall not be accepted. All drill stem threads and/or collars shall be removed.
a. Location #1 (Buffalo) – Quantity: 37
b. Location #2 (Gillette) – Quantity: 453
Item 2. Steel Brace Post (Short) 2-7/8” by 5’ (TOTAL Quantity: 173)
Steel Brace Posts (Short): Shall be 2-7/8” outside diameter (OD) by 0.217” minimum wall thickness, by 5’ in length, Oil Company Tubular Goods (OCTG) steel pipe. Pipe shall be used/recycled structural OCTG casing or drill pipe in sound structural condition, clean and radiation free (<12 µR/hr.), or new reject pipe, or unused surplus pipe. Surface rust is acceptable; however, any material that is excessively pitted, rusty, flaking, peeling, or corroded will be rejected. Pipe with splits, bends, or thin spots (hot spots) will not be accepted. Pipe shall be free from oil debris. All pipe that is concrete lined, lined with any synthetic material, has holes or perforations shall not be accepted. All drill stem threads and/or collars shall be removed.
a. Location #1 (Buffalo) – Quantity: 13
b. Location #2 (Gillette) – Quantity: 160
Item 3. Steel Brace Rail 2-3/8” by 9’ (TOTAL Quantity: 267)
Steel Brace Rail: Shall be singular piece of round tubular steel constructed with a minimum 2- 3/8” outside diameter, by 9' in length, by minimum 11-gauge wall thickness. Brace rail ends shall be pressed flat on both ends and be equipped with both a 90- and 45-degree angle capable of being mounted both horizontally as well as diagonally on all bracing structures.
a. Location #1 (Buffalo) – Quantity: 17
b. Location #2 (Gillette) – Quantity: 250
Item 4. In Line Steel Tubular Posts 2 - 7/8" by 9' (TOTAL Quantity: 395)
In Line Steel Tubular Posts 2-7/8" by 9': Shall be 2-7/8” outside diameter, (OD) by 0.217” minimum wall thickness, by 9’ in length, Oil Company Tubular Goods (OCTG) steel pipe. Pipe shall be used/recycled structural OCTG casing or drill pipe in sound structural condition, clean and radiation free (<12 µR/hr.), or new reject pipe, or unused surplus pipe. Surface rust is acceptable; however, any material that is excessively pitted, rusty, flaking, peeling, or corroded will be rejected. Pipe with splits, bends, or thin spots (hot spots) will not be accepted. Pipe shall be free from oil debris. All pipe that is concrete lined, lined with any synthetic material, has holes or perforations shall not be accepted. All drill stem threads and/or collars shall be removed.
a. Location #1 (Buffalo) – Quantity: 200
b. Location #2 (Gillette) – Quantity: 195
Item 5. Steel T-Posts 5.5’ (TOTAL Quantity 5400)
Heavy Duty Steel Fence Posts 5-1/2’: (Chicago Steel or Approved Equal) Shall be a heavy-duty grade 5-1/2’ steel posts painted green with white, silver, or lime green tops or painted gray with red, white, or silver tops, “T” bar type, with a swaged or riveted anchor plate which does not easily bend or twist when an obstruction is hit during the driving process. Other steel post painted colors can be allowed on a case-by-case basis with the approval of the Contracting Officer (CO). Posts shall be furnished with clip-type fasteners. Punched tabs for fastening wires are not acceptable. Steel posts shall be manufactured from wrought, rail, or new billet steel, and shall weigh a minimum of 1.33 lb./ft exclusive of the anchor plate, which shall weigh a minimum of 0.67 lbs., with a minimum of 18 sq. inches in area. Posts shall meet all ASTM A702 requirements and must be tagged accordingly. Failure to meet any of these requirements shall result in the rejection of material at the time of inspection.
a. Location #1 (Buffalo) – Quantity: 1000
b. Location #2 (Gillette) – Quantity: 4400
Item 6. Heavy Duty Barbless Wire (TOTAL Quantity 128)
Heavy Duty Barbless Wire: (Redbrand or Approved Equal) Two 12-1/2 ga. galvanized wires twisted together. Wire shall be zinc-coated steel wire of at least 0.28 oz/ft2 of coated surface area and a minimum breaking strength of 950 lb.-force. The wire shall be heavy duty with a high tensile strength, low stretch, tight braiding per rod, conform to all ASTM A641 requirements and must be tagged accordingly. Failure to meet any of these requirements shall result in the rejection of the material at the time of inspection.
a. Location #1 (Buffalo) – Quantity: 32
b. Location #2 (Gillette) – Quantity: 96
Item 7. Heavy Duty Barbed Wire (Quantity 216)
Heavy Duty Barbed Wire: (Redbrand or Approved Equal) Two 12-1/2 ga. galvanized wires twisted together with 2-point barbs of 14 ga. wire spaced 4”- 6” apart. Wire and barbs shall be zinc-coated steel, with a zinc coating of at least 0.28 oz/ft2 of coated surface area and a minimum breaking strength of 950 lb-force. The barbed wire shall be a heavy-duty wire conforming to ASTM A121 requirements. Failure to meet any of these requirements shall result in the rejection of the material at the time of inspection.
a. Location #1 (Buffalo) – Quantity: 27
b. Location #2 (Gillette) – Quantity: 189
File details come from the government source that posted it. Updated .