STATEMENT OF WORK

Overhaul of the Landing Gear Wheels and Tires

Date: October 21, 2020

National Aeronautics and Space Administration Armstrong Flight Research Center Edwards, California

Table of Contents

1.0 Background

2.0 Objectives

3.0 Scope

4.0 Task

5.0 Deliverables

6.0 Performance / Qualifications

7.0 Quality Requirements

8.0 Period of performance

1.0 Background

The National Aeronautics and Space Administration (NASA) at the Armstrong Flight Research Center (AFRC) in California operates multiple research and platform aircraft.

To ensure our fleet maintains a good airborne status, AFRC has a requirement for the servicing and overhaul of the landing gear wheels and tires for all the various AFRC-owned aircraft. The aircraft are located at Edwards AFB, CA, and Palmdale, CA and other locations as designated by NASA.

1.1 AFRC Aircraft Information:

1.1.1 Boeing DC-8-72 Serial Number 46082

1.1.2 Gulfstream G-III Serial Number 389

1.1.3 Gulfstream G-III Serial Number 344

1.1.4 Boeing 747-SP Serial Number 21441

1.1.5 Gulfstream G-II Serial Number 244

1.1.6 Beechcraft King Air B-200 Serial Number 000997

1.1.7 Beechcraft King Air B-200 Serial Number 001164

1.1.8 Global Hawk

1.1.9 ER-2/U-2

2.0 Objectives

2.1 NASA requires overhaul and services for the landing gear wheels and tires for the various AFRC-owned aircraft. These overhauls shall include all necessary inspections, repairs and certifications required to make the wheel assembly airworthy. In order to perform this service, the contractor shall be a FAA-145 Repair Station Limited Accessories.

2.2 NASA requires all components specified in the Attachment 2: Schedule of Supplies and Services will be returned from overhaul.

2.3 The established services do not include “Unusually Damaged components.”

“Unusually Damaged” is defined as components severely damaged due to obvious abuse/misuse, crash damage or cannibalization. Components meeting one or more of these criteria may be considered as “Unusually Damaged”. All other components shall be overhauled in accordance with the established services.

3.0 Scope

3.1 The contactor shall provide all labor, tooling, test equipment and facilities necessary to complete the overhaul process listed in the schedule entitled Attachment 2: Schedule of Supplies and Services. The services to be performed under this contract shall be performed at the Contractor’s facility.

3.2 NASA AFRC shall ship all landing gear wheels and tires to contractor for repair.

3.3 The contractor shall return ship all landing gear wheels and tires to the designated location indicated in Attachment 2: Schedule of Supplies and Services.

3.4 The contractor shall perform all required repairs as define by the appropriate Technical Order (TO) and replace conditional parts that fail inspection in accordance with the applicable TO.

3.5 The contactor shall provide all materials necessary to complete the overall process.

3.6 The contractor shall obtain written authorization from the Contracting Officer (CO) for all over and above requirements.

3.7 Requests for Government Furnished Material (GFM): Requests for GFM will be reviewed by the Government and a determination will be made to either furnish the requested material or deny the request.

3.7.1 Requests for GFM shall be submitted in writing to the CO with a brief narrative that supports the request.

3.8 Aircraft on Ground (AOG) and Work Stop (WS) Requirements:

3.8.1 An AOG or WS situation necessitates a special schedule and requires accelerated overhaul completion and expedited delivery to the applicable NASA location. If an AOG/WS status occurs as a result of a lack of any of the components specified in the schedule, the Contractor will be notified by the Government in writing of the AOG/WS situation. The Contractor's response shall provide the following.

3.8.1.1 Status of the component(s) needed to satisfy the AOG/WS condition that includes what NASA items in-house for repair/overhaul are closest to completion under normal working conditions.

3.8.1.2 An estimate of the labor hours needed to accelerate work completion. The accelerated work will be reviewed by the CO for authorization.

4.0 Task

4.1 Corrosion Inspection: NASA missions for aircraft include operating around salt water, at low altitude, and are subject to corrosion. Corrosion should be expected on NASA components and does not constitute unusual damage.

4.1.1 Should corrosion be found during initial inspection and functional testing, disassembly shall be made to the extent necessary to remove all corrosion or replace the part or parts affected.

4.1.2 Corroded parts shall be replaced, except in those cases where removal of corrosion from parts will not impair efficiency or safe operation of the part.

4.1.3 Corrosion removal and treatment of affected areas shall be accomplished in accordance with the NASA TO, or best commercial practices if not addressed by the NASA TO.

4.2 Removal and Treatment:

4.2.1 Corrosion removal and treatment of affected areas shall be accomplished in accordance with the TO specifications or shall meet the Contracting Officer's approval when specifications do not exist or are not clear.

4.3 Paint: Repaint white

4.4 Cannibalized Units: Services shall not include repairable parts, which have been cannibalized from the unit being overhauled.

4.4.1 These components shall be evaluated for the services specified in Attachment 2: Schedule of Supplies and Services.

4.4.2 In the event any of the components listed in the Attachment 2: Schedule of Supplies and Services are received by the contractor in a condition that represents cannibalization, immediate notification to the CO is required.

4.4.3 This notification shall include a detailed description of the noted deficiencies and shall reference the purchase order number, national stock number, part number, and serial number and is subject to the discretion of the Contracting Officer. Items that are received missing consumable components shall be identified but are not considered to be cannibalized.

5.0 Deliverables

5.1 Listed in Attachment 2: Schedule of Supplies and Services

5.2 All parts modified under the provisions of this contract must be airworthy and suitable for installation on NASA aircraft.

5.2.1 Each returned component shall be tagged with a DD Form 1574 Serviceable Condition Code Tag or a FAA Form 8130-3, Airworthiness Approval Tag, completed in its entirety.

5.2.2 The contractor shall furnish a Certificate of Airworthiness in accordance with FAA procedures (or NASA approved alternate procedure) and a Certificate of Conformance (COC) IAW FAR 52.246-15 for all components.

5.2.3 These forms shall be packaged with each component: Provide the implementation status of each applicable FAA airworthiness Directive and manufacturer's Service Bulletin; Identify the Technical Standard Order Authorization (TSO); and Manufacture authorized to make item.

6.0 Performance/Qualifications

6.1 The contractor shall perform all modifications IAW applicable Component Maintenance Manuals (CMMs), other specifications in lieu of an applicable CMM, and/or applicable acceptance criteria.

6.1.1 The NASA CO must approve any proposed deviations.

6.2 Except for ER-2/U2, the contractor must have access to required CMMs, specifications and/or acceptance criteria and any other required data to ensure all components are modified IAW current specifications and procedures. NASA may review manuals and performance acceptance criteria as required. Original design or functional capabilities of the end item and parts thereof shall not be changed unless authorized or directed by the requirements of this SOW.

6.2.1 NASA will supply all ER-2/U2 technical data, as required.

6.3 The Contractor shall have access to all applicable documents and obtain current editions of all applicable documents. Neither the closing date for receipt of offers nor contract award will be delayed pending receipt of these documents for any offeror.

6.4 The contractor shall be certified or in compliance AS9100, AS9110, or equivalent Quality Management Standard.

6.4.1 The contractor is responsible for performing or assuring all modifications necessary to substantiate that the goods or services furnished conform to Government’s requirements.

6.4.2 The contractor shall take prompt action to correct conditions that have or could result in goods or services that do not conform to contractual requirements.

6.4.3 Records of conformance shall be maintained on file at the contractor’s facility and made available or provided for review by the Government upon request.

6.4.4 The Government reserves the right to conduct surveillance at contractor’s facility to verify the existence, adequacy, and effectiveness of the quality system.

6.4.5 Upon request of the Government, the contractor(s) shall forward a copy of their current certification and Quality Assurance Manual for review.

6.5 The contractor shall be a FAA Part 145 Repair Station.

6.6 The Contractor shall provide immediate notification to the CO upon loss of any required certifications. The contractor shall also:

6.6.1 Comply with the certification/documentation requirements specified herein.

6.6.2 Attach certifications/documentation to the outside of the shipping container.

6.7 Unusual Damage

6.7.1 Reporting Requirements:

6.7.1.1 When a component is processed for unusual damage evaluation, the contractor shall within 5 calendar days of receipt of the item, submit an inspection condition report explaining the rationale for the pricing exclusion, including photographic evidence as necessary.

6.7.1.2 The report shall also include a price proposal, covering all parts for needed to return the unit to serviceable condition that meets all applicable OEM or TO specifications.

6.7.1.3 The report shall contain the purchase order number, line item number, national stock number (NSN), part number (PN), nomenclature, and serial number of the component, a listing of the material required, the time needed to complete the work, and a cost breakdown including the cost of each required part and the number of labor hours.

6.8 The contractor's delivery obligation shall stop from the date of notification that an item has been determined to be a candidate for "Unusual Damage Evaluation."

6.8.1 The delivery requirement will be specified in the purchase order modification and will apply only to those items specifically addressed by the modification.

6.8.2 The contractor shall deliver all other components not individually addressed by the modification under the original delivery date specified on the purchase order.

6.8.3 The report shall not include the work involved in the teardown and inspection, which will have already occurred, as part of the basic service.

6.8.4 Within 30 calendar days, the CO shall provide approval or deny authorization for the work based on information in the report and any other information which may be available.

6.8.5

6.8.6 If work is not authorized, the CO will provide the contractor with disposition instructions for the item in question. In the event an item is returned to the Government in a disassembled condition.

6.9 Environmental Requirements.

6.9.1 All parts must be thoroughly cleaned in accordance with applicable Component Maintenance Manuals or FAA Advisory Circular 43-205, Guidance for Selecting Chemical Agents and Processes for paint stripping and General Cleaning of Aircraft and Aviation Products, to ensure they are as free as practicable of all hazardous dust to include hexavalent chromium, cadmium, lead, etc.

6.9.2 Prior to being returned to AFRC, AFRC may take random samples of parts to ensure they are free as practicable of all hazards. Information on these hazards can be found in Occupational Safety and Health Standards 1910.1025 (lead), 1910.1026 (Hexavalent Chromium) and 1910.1027 (Cadmium).

7.0 Quality Requirements

7.1 NASA considers components ready for issue (RFI) upon acceptance.

7.1.1 Components determined to be non-RFI upon installation may be returned to the contractor with deficiencies described in a Non-Conformance Report.

7.1.2 Procurement quality requirements:

7.1.2.3, Attachment 3: Q-1 Section A: Aircraft Assemblies, Parts and Materials

7.1.2.3 Attachment 4: Q-3 Source Inspection and/or Test is Required by NASA Quality Representative

7.2 Serviceable Parts and Replacement Parts:

7.2.1 Parts of a component found to be in a serviceable condition because of inspection and functional testing shall be reused.

7.2.2 Missing parts or parts found to be defective shall be replaced with new parts that meet the current specifications and drawings.

7.2.3 Only new replacement parts, traceable to the OEM, are acceptable for use for this requirement.

7.3 Data Delivery Package

7.3.1 Turnaround Time and Delivery Time: The required turn-around-time is ten

(10) days after receipt of material (ARM).

7.3.2 In the event of an AOG/WS situation, the task Order and applicable Line Item Number will be modified as needed to reflect the NASA delivery address .

The Contractor shall be required to ensure the task order is included on shipping documents/delivery tickets so that the Material Receipt can be processed by the applicable NASA receiving personnel.

7.3.3 Deliveries or Performance: F.O.B. Destination is requested as the F.O.B.

point for all deliverables.

8.0 Period of Performance

8.1 The period of performance for this contact is five years from the effective date, including one base year with four option years. Task orders may be issued at any time during the effective period.