Questions and Answers

Q1: Are we to assume that the overhaul price is to be a Firm Fixed Price (FFP) or an average repair price?

A1: See RFP Section E.6 ADDENDUM TO 52.212-1- INSTRUCTIONS TO OFFERORS- COMMERCIAL ITEMS / Price Volume 2: Offeror shall propose a firm fixed price for each line item listed under attachment 2.

Q2: SOW Section 3.4: States, the contractor shall perform all required repairs as define by the appropriate Technical Order (TO) and replace conditional parts that fail inspection in accordance with the applicable TO. We'd like to be certain of any differences there may be as compared to the Commercial Maintenance Manual (CMM).

Will NASA provide the TO in order for contractor to review the repair requirements?

A2: The contractor will be responsible for obtaining the TOs.

Q3: SOW Section 4.1.1 - 4.1.3 Corrosion on parts is to be removed per the T.O. limits, if limits are exceeded the part is to be replaced with new. Is NASA expecting the overhaul price to include replacement of corrosion parts that exceed the repair limitations? or would these failed corrosion parts be an O & A to the overhaul pricing.

A3: Corrosion that exceeds the limits established by the T.O. are considered over and above.

Over and Above requests need to be submitted for approval with the necessary evidence to support the request.

Q4: SOW Section 7.3.1: States, Turnaround Time and Delivery Time: The required turn-around-time is ten (10) days after receipt of material (ARM).

To clarify... Is NASA expecting the unit evaluation be done within 10 days? working or calendar days? With a completion overhaul date provided as part of the evaluation report?

A4: The unit evaluation and standard overhaul are expected in the 10-working day period specified. Over and above repairs do not fall on the 10-day turn around.

Q5: For the G-III can you provided the part number for the Nose and Main assembly?

A5: See revised attachment 2_Schedule of Supplies and Services.