Attachment 1 - SOW VC140 Repaint.pdf

PDF 705 KB Posted

Attached to
VC-140 Paint Federal contract opportunity
Solicitation number
FA286023Q4013
Issued by
Department of the Air Force Headquarters District Washington

View the file

Other files for this federal contract opportunity

Other files attached to VC-140 Paint, newest first.
File Type Posted
VC-140 Paint Combo.pdf PDF
Attachment 2 - Tech Manual cleaning and corrosion prevention.PDF PDF
Attachment 3 - Paint Matrix.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

VC-140 PAINT REFURBISHMENT SERVICES

AT

JB ANDREWS, MARYLAND

13 June 2023

VC-140 Paint Refurbishment Services

Table of Contents

1.0 SECTION I: DESCRIPTION OF SERVICES

1.1 General Scope

1.2 Background

1.3 Inherently Governmental Function

1.4 Period of Performance

1.5 Place of Performance

1.6 Specific Tasks

1.7 Aircraft Military Specifications: VC-140 Jetstar

1.8 Minimum Qualifications

1.9 Deliverables

1.10 Contractor Travel

1.12 Small Business Subcontracting Program

2.0 SECTION II: SERVICE SUMMARY

2.1 General

3.0 SECTION III: GOVERNMENT FURNISHED PROPERTY and SERVICES

3.1 General

4.0 SECTION IV: GENERAL INFORMATION

4.1 Hours of Operation

4.2 Contractor Personnel

4.3 Contractor Liability

4.4 Conservation of Utilities

4.5 Environmental Protection

4.6 Miscellaneous Paragraphs

4.7 Security

4.8 Safety

5.0 SECTION V: APPENDIX

Attachments:

1) VC-140 Paint Scheme (Presidential Support)

2) Technical Manual 1-1-8, Application and Removal of Organic Coatings, Aerospace and Non- Aerospace Equipment

SECTION I

1.0 DESCRIPTION OF SERVICES

1.1 GENERAL SCOPE. Materials, labor, supervision and equipment for repainting entire aircraft and minor repairs (if discovered) to extend the static display life on one (1) VC-140 Jetstar in accordance with (IAW) this performance work statement (PWS). The VC-140 is on display due West of the 89th Airlift Wing building (building 1419), near the corner of Arnold Avenue and Menoher Drive on Joint Base Andrews, Maryland.

1.1.1 Description of Services/Objectives. The VC-140 Jetstar will be sanded, have corrosion repaired (not visible to visitor/observers’ eye), repainted using high-quality, glossy, automotive two-part polyurethane, including restoration of all existing decal and painted markings using painted re-application. Windows are to be included in the paint work, blacked out with black gloss paint over the windows.

1.2 BACKGROUND. This job is to return the 89 Airlift Wing’s VC-140 Jetstar static display to original shape and cosmetic appearance to meet historically accurate standards. The VC-140 Jetstar should be painted in a glossy, multicolor paint scheme and all emblems applied in full color for curb-side appeal rather than function. Once painted, this VC-140 should match “Museum Quality” standards in gloss and cleanliness and will be in Presidential Airlift Group approved colors (colors listed section 1.7) (see attachment 1).

1.3 INHERENTLY GOVERNMENTAL FUNCTION. The contractor shall not perform inherently governmental functions as defined in FAR Subpart 7.5 in relationship to this PWS.

1.4 PERIOD OF PERFORMANCE. This is a three-month contract. The Period of Performance will begin once the VC-140 has been moved to it's foundation (estimated move date is 18 July 23).

1.5 PLACE OF PERFORMANCE. The contractor shall perform the services in the PWS at Joint Base Andrews, Maryland.

1.6 SPECIFIC TASKS. The subsequent services to be performed in accordance with the PWS.

1.6.1 The contractor shall provide all personnel safety gear, equipment, tools, materials, supervision and safety transportation. A chemical inventory list with SDS for each item, will be approved prior to use by HAZMAT Program Manager, and readily available to all contract personnel.

1.6.2 The contractor shall remove all bird and insect nests.

1.6.3 The contractor shall verify all vents, wheel wells, flap openings, elevator openings, rudder openings, cowling openings, cowl flap areas, intakes, air scoops, exhausts ducts and the crest of the tail are bird and insect proofed. Further, if the above items are not covered and/or the current covering does not meet the intent to bird or insect proof, the contractor shall repair/replace any necessary items to ensure this standard is met.

1.6.4 Prior to paint, the contractor shall repair or replace any broken windows, canopies, and missing panels. Further, any damaged or missing components that were identified by the government (outlined in paragraph 1.2.) are to be repaired or remanufactured by the contractor to original or museum quality standards. The contractor shall prime and color match the repaired area to original paint color.

1.6.5 The contractor will match the current paint scheme (Presidential Airlift, (colors listed section 1.7)(see attachment 1)) and use the paint types by military specification as outlined in paragraph 1.7. The contractor shall purchase adequate amounts of paint to comply with the requirements of this PWS.

1.6.6 The contractor will use supplied photo and current paint scheme (Presidential Airlift, (colors listed section 1.7) (see attachment 1)) to reference markings and paint scheme prior to the start of performance.

1.6.7 The contractor will only use approved chemicals, cleaning compounds and solvents. All chemicals, cleaning compounds and solvents will be stenciled as to content and specification, in accordance with labels meeting Occupational Safety and Health Administration (OSHA), Department of Defense (DOD), and Federal Hazardous Communications minimal requirements.

The contractor shall comply with all state and federal environmental code regulations.

1.6.8 The VC-140 Jetstar will be sanded, have corrosion repaired, repainted using high-quality, glossy, automotive two-part polyurethane, including restoration of all existing decal and painted markings using painted re-application. Windows are to be included in the paint work and blacked out utilizing gloss black paint.

1.6.9 The contractor shall thoroughly clean the aircraft’s painted surfaces and thoroughly inspect the aircraft to determine the soundness of paint film. Areas of severely deteriorated paint as indicated by loose or peeling paint, or where bare metal is showing, shall be stripped.

Approved cleaning agents will be water soluble and biodegradable materials.

1.6.10 The contractor will remove all exterior areas of corrosion from the aircraft to include the engine frontal, nose radome, and underside of aircraft. The contractor shall repair these areas and then treat/prime the repairs prior to paint. The contractor shall restore the aircraft to the current (original) paint scheme (Presidential Airlift) (colors listed section 1.7) (see attachment 1).

1.6.11 The contractor shall perform limited disassembly (10-15%) of the aircraft and components only when necessary, in an effort to locate and remove all areas of external corrosion. The contractor shall perform corrosion treatment to all external surfaces or components removed, reassemble all components and items, and apply final chemical coating treatment to prevent corrosion from spreading. Finally, the contractor will apply color matching high-gloss paint to the aircraft exterior.

1.6.12 Before painting, the contractor will completely scuff-sand the entire exterior surface area that is to be repainted using abrasive paper no coarser than 150 grit. Scuff sanding shall include roughing up 100% of the painted surface, removal of oxidized paint, and feather-edging of all flaked paint. It is not intended to remove a sound paint system. Do not sand through to bare metal as damage to the aircraft may occur. No hazardous chemicals are authorized to be used for removing the aircraft topcoat of paint. Sanding is to be accomplished using a HEPA filtration sanding system.

1.6.13 After scuff sanding the aircraft and prior to application of any type paint, the contractor shall wipe down the aircraft with isopropyl alcohol. The solvent used during the wipe down operation shall not be allowed to evaporate from the surface, but shall be wiped from the surface with a dry, clean cloth. At this time, the contractor will also identify and apply lightweight filler compounds to any dents or wrinkles to improve the overall appearance of the aircraft. The contractor will then sand smooth any filler applied to the aircraft and then perform another wipe down process with isopropyl alcohol.

1.6.14 The contractor shall apply primer to the thickness recommended by the paint manufacturer and allow it to dry as specified by the paint manufacturer’s specifications.

1.6.15 After priming, the contractor shall wipe down the aircraft with isopropyl alcohol. The solvent used during the wipe down operation shall not be allowed to evaporate from the surface, but shall be wiped from the surface with a dry, clean cloth to prevent undue residue from accumulating on surface.

1.6.16 The contractor shall apply topcoats of the appropriate “GLOSS” paints to the aircraft exterior surface to the thickness recommended by the manufacturer and allow it to dry as specified by the paint manufacturer’s specification. After the top-coat is dry, the contractor shall wipe down the aircraft with a solvent which is approved by the paint manufacturer. The solvent used during the wipe down operation shall not be allowed to evaporate from the surface, but shall be wiped from the surface with a dry, clean cloth to prevent undue residue from accumulating on surface.

1.6.17 The contractor shall warranty and ensure the applied coatings shall not flake, peel, or crack for two (2) years from the date the contract is completed. Paint shall be smooth, uniform and free of blisters, cracks, loosely adherent particles, nodules, or powdery deposits. No primer shall be visible through top-coat; there shall be no overspray, blisters, fish eyes, runs or sags, roughness or dirt inclusions. After completion of paint and repairs, all aircraft markings shall be applied IAW attachment 1. No stickers or vinyl are to be used for any color, markings, or indicators.

1.6.18 The contractor shall provide and apply the aircraft stencils required to configure the aircraft to the paint scheme in attachment 1, to include, but not limited to lettering for “United States of America” on upper section of fuselage (both sides), lettering on vertical stabilizer (tail) for number “89001” (both sides) and Air Force insignia on outboard engine nacelles (both sides). Also applied will be the United States Flag on both sides of the vertical stabilizer (tail). All insignias will be reapplied using paint.

1.6.19 The contractor shall inspect and clean all water drain holes to allow for proper drainage.

1.6.20 The contractor shall remove all areas of corrosion, from the aircraft mounts. Treat these areas with primer and color match the repaired area to original paint color.

1.6.21 The contractor shall ensure the work area is completely cleaned free of debris prior to the end of contract performance.

1.6.22 The contractor shall remove all paint, or other finish material where it has spilled or spattered. All paint scrapings: trash, old paint, and all debris shall be removed daily from site.

All debris shall be containerized for proper removal and disposal.

1.6.23 The contractor is responsible for the proper collection, handling, and disposal of all wastes generated during performance of this work in accordance with all Federal and State regulations.

1.6.24 The contractor shall notify the government Point of Contact (POC) at least 96 hours in advance of beginning work and within 48 hours of work completion.

1.6.25 Once the contractor determines the work nearing completion (within 48 hours), the contractor will arrange a final inspection/walk-through with contractor’s CM, 316 AW/CVM, COR and 89 AW Historian. The purpose of this inspection is to identify defects/non-standard conformance with the PWS prior to removal of tooling/materials from the immediate area.

1.7 AIRCRAFT MILITARY SPECIFICATIONS: VC-140 JETSTAR

1.7.1 The contractor shall comply with the following specifications. The contractor shall paint this aircraft using glossy paint. The contractor shall secure all windows, doors, panels, fuselage openings, access panels, hatches, rudders, ailerons, and elevators.

• The contractor shall seal the airframe, doors, panels, fuselage openings, and canopies to limit water, bird, and insect intrusion.

• The contractor shall prep and paint all clear windows and windscreens with gloss black paint and paint window edges with appropriate color schemes.

• The government has selected the following colors or commercial equivalent to be applied by the process of spray application by the contractor, the colors selected will be color matched and applied in a high gloss finish.

Insignia Blue (Gloss) PRC DeSoto International Inc Federal Standard 595B Color, CA8800/B574, 15044

Blue (Gloss) PRC DeSoto International Inc Federal Standard 595B Color, CA8800/B5070, No cross

Red (Gloss) PRC DeSoto International Inc Federal Standard 595B Color, CA8800/B131, 11136

Insignia White (Gloss) PRC DeSoto International Inc Federal Standard 595B Color, CA8800/B793, No cross

Black (Gloss) PRC DeSoto International Inc Federal Standard 595B Color, CA8800/B701, 17038

Gray (Gloss) PRC DeSoto International Inc Federal Standard 595B Color, CA8800/B707, No cross

Gold PRC DeSoto International Inc Federal Standard 595B Color, CA8800/B92503, No cross

Primer Yellow PRC DeSoto International Inc Federal Standard 595B Color, CA7000

Clear PRC DeSoto International Inc Federal Standard 595B Color, CA8800/B900A

1.8 MINIMUM QUALIFICATIONS. Contractor will have at least ten years of aircraft restoration experience. Contractor should have at least one licensed airframe and power plant mechanic on-site and available during any aircraft disassembly & reassembly actions required and corrosion control efforts to be performed listed within PWS.

1.9 DELIVERABLES

1.9.1 Below is a list of deliverables under this contract.

Support Area Title Delivery Date/Description Hazmart Chemical Inventory List No later than 14 calendar days prior to contract start date or prior to purchase.

Hazmart Safety Data Sheets No later than 14 calendar days prior to contract start date or prior to purchase.

316 AW/CVM, COR On-Site Inspection Report Weekly walkthrough inspection with 89 AW

Historian 316 AW/CVM, COR Rescheduled Hours Submit in writing when delays, caused by weather, scheduled ceremonies, government shutdown or base closure occur.

1.10 CONTRACTOR TRAVEL. No government sponsored travel off-site is authorized as part of this PWS.

SECTION II

2.0 SERVICE SUMMARY (SS)

2.1 GENERAL- Non-Applicable

SECTION III

3.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1 GENERAL

3.1.1 Security, Fire and Medical Services. The Government will provide police and fire protection. In the event of a medical emergency, base ambulance service for transporting an injured employee to a local hospital is available on a cost reimbursement basis.

SECTION IV

4.0 GENERAL INFORMATION

4.1 HOURS OF OPERATION. The contractor shall perform the services required under this contract during the following hours: 0730-1630 Monday through Friday, except Federal holidays or when the government facility is closed due to local or national emergencies, administrative closings, or similar government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. On occasion, an employee will be required to work on weekends and Federal holidays. The government will notify the contractor within 24 hours of such occurrence.

4.1.1 Recognized Holidays.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day

Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day

*If the holiday falls on a Saturday, it will be observed on the preceding Friday. If the holiday falls on Sunday, it will be observed on the following Monday.

4.2 CONTRACT PERSONNEL

4.2.1 Contract Manager (CM). The contractor shall provide a contract manager and alternate(s) who are knowledgeable in aircraft restoration. The CM or alternate(s) shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM or alternate(s) shall be available to meet on the installation with government personnel designated by the CO to discuss problem areas. The CM and alternate(s) shall be able to read, write, and speak English. The CM shall be able to effectively communicate with contractor employees. Qualifications for the CM are listed below: Contractor shall have at least ten years of aircraft restoration experience. Contractor must have the ability to fabricate detailed stencils for the application of labeling and markings.

4.2.1.1 Personnel Roster. The contractor may be required to provide a personnel roster consisting of names and other pertinent personnel data to the requiring activity for the purposes of 100% accountability real-world and exercise situations.

4.2.2 Contractor Employees:

4.2.2.1 Certifications. Contractor employees shall have current and valid professional certifications and licenses required to perform the work in this PWS, prior to contract award. All certification and licensing requirements by Federal, State, and local agencies shall be complied with at the contractor's expense.

4.2.2.2 Contractor Qualifications. The contractor shall utilize employees possessing adequate training, skills, and knowledge to perform the requirements of this contract.

4.2.2.3 English Language. Employees who deal directly with customers will be required to communicate clearly and concisely with the customers in English. This requirement is strictly for the purpose of efficiently performing the contract tasks.

4.2.3 Contractor Lodging and Sustenance. Contractors will provide lodging and sustenance for their entire crew at their own expense.

4.2.3.1 Identification of Contractor Employees. All contract personnel attending meetings, answering government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractors will not be required to openly wear a contractor badge during the performance of duties but should have required identification on their person.

4.2.3.2 Privately Owned Vehicles. Each contractor employee driving a privately owned vehicle on the installation must carry minimum liability insurance as required by the state. Contractor employees shall adhere to all posted speed limits and shall not use hand-held cellular telephones while driving on the installation for phone calls or texting. Use of seatbelts is mandatory. Any contractor employee cited for driving under the influence will have their driving privileges immediately revoked for a period to be determined.

4.3 CONTRACTOR LIABILITY

4.3.1 The contractor shall assume strict liability for any damage to aircraft, aircraft parts, support equipment, and electrical components, facilities or other government property caused by any activities under, or in violation of, this contract. The contractor shall be assessed the full cost (parts, labor, and administrative activities) of any repairs required to correct damages. The contractor may be given the option to repair any non-aircraft related damage at the government’s discretion, in lieu of payment. Any repairs shall be preapproved by the Contracting Officer. The final product must meet government specifications and be certified as acceptable by the government. Reasonable wear and tear is excluded. If any further damage to the already damaged areas is found, the contractor assumes full liability for all additional damage to the area.

4.4 CONSERVATION OF UTILITIES

4.4.1 The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities.

4.5 ENVIRONMENTAL PROTECTION

4.5.1 The contractor shall comply with all applicable federal, state, and local laws, regulations and standards that are or may become applicable to contractor’s activities in performance of this PWS.

4.5.2 Environmental Compliance and Weather. IAW T.O. 1-1-8 (attachment 2) paint shall be applied during periods of 30 to 80 percent relative humidity and 60 to 90 degrees Fahrenheit. If the temperature is 50 degrees or lower, or rain is forecasted before the paint can cure, painting operations shall be suspended. These humidity and temperature requirements will allow paint, primer and sealant sufficient time and weather conditions to cure.

4.5.3 Overspray. The contractor shall assume all responsibility for paint and primer overspray on all vehicles, buildings, and landscaping.

4.5.4 Permits. The contractor shall be solely responsible for obtaining at its cost and expense any environmental permits required for its operations under the contract, independent of any existing permits held by the government. The contractor acknowledges that the government will not consent to being named a secondary discharger or co-permittee for any operations or activities of the contractor under the contract. In the event the government is named as a secondary discharger or co-permittee for any activity or operation of the contract, the government shall have the right to take reasonable actions necessary to prevent, suspend, or terminate such activity or operations, including terminating this contract, without liability or penalty.

4.5.5 Right to Inspect. The government’s rights under this contract specifically include the right for government officials to inspect upon reasonable notice the work site for compliance with environmental, safety and occupational health laws and regulations, whether government is responsible for enforcing them. Such inspections are without prejudice to the right of duly constituted enforcement officials to make sure inspections. The government normally will give the contractor 24 hours prior notice of its intention to inspect, unless it determines the entry is required for safety, environmental, operations or security purposes.

4.5.5 Non-compliance. If the contractor is found to not be in compliance with any of these regulations, there may be cause for the facility to shut down until the contractor, when within the contractor’s control or the government, has remedied the problem. Any sanitary deficiencies shall require immediate correction.

4.5.6 Spill Response. The contractor is responsible to report and promptly clean up all spills in a manner consistent with current environmental regulations. In the event that it is necessary to utilize government material, equipment, or personnel to clean up a contractor caused spill, the contractor shall be required to reimburse the government for all associated costs.

4.5.7 Audit. This contract may be subject to audit by any and all cognizant government agencies. The contractor shall make available all records, which it maintains with respect to these contracts, to such agencies.

4.5.8 Failure to Insist on Compliance. The failure of government to insist, in any one or more instances, upon performance of any of the terms, covenants or conditions of this contract shall not be construed as a waiver or relinquishment of government’s right to the future Performance of any such terms, covenants or conditions and the contractor’s obligations in respect to such future performance shall continue in full force and effect.

4.5.9 Green Procurement Program (GPP). The GPP is mandatory federal acquisition program that focuses on the purchase and use of environmentally preferable products and services.

Many different items are covered by the GPP. Recycled-content products are designated by the Environmental Protection Agency (EPA). “Bio-based” products made from renewable plant materials are designated by the United States Department of Agriculture (USDA). Energy and water efficient products are designated by the Department of Energy (DOE). GPP also requires the government to avoid purchasing Ozone Depleting Substances (ODS) and EPA-designated priority chemicals. Environmentally preferable purchasing (EPP) is a voluntary program, and it encourage the purchase of goods and services that have decreased effects on human health and the environment (compared to the competing goods and services that serve the same purpose) but are not already required by one of the mandatory GPP elements.

(1) Green Procurement is mandated except when the contractor can show that the product with recycled content does not meet intended specifications, has excessive costs, or cannot be delivered in time to support the schedule of the contract. If the contractor is unable to locate a specified product meeting the GPP requirement, identify the issue to the CO or GPM for guidance. GPP is based on legal requirements and the Department of Defense facilities are subject to enforcement action if these requirements are ignored.

(2) The contractor shall make maximum use of products containing recovered materials that are EPA designated items IAW FAR Clause 52.223-17, Affirmative Procurement of EPA- Designated Items in Service and Construction Contracts. The list of EPA-designated items is available at https://www.epa.gov/smm.comprehensiveprocurement-guidelines-cpg-program.

4.6 MISCELLANEOUS PARAGRAPHS

4.6.1 Freedom of Information Act (FOIA). All official government records affected by this contract are subject to the provisions of the FOIA (5 U.S.C. 552/DoD 5400.7-R/AF Supplement).

Any request received by the contractor for access/release of information from these records to the public (including government/contractor employees acting as private citizens), whether oral or in writing, shall be immediately brought to the attention of the CO for forwarding to the Base FOIA Manager to ensure proper processing and compliance with the Act.

4.6.2 Controlled Unclassified Information (CUI). Not required.

4.6.3 Notification of Debarment/Suspension Status. The contractor shall provide immediate notice to the CO in the event of being suspended, debarred, or declared ineligible by any other federal department or agency, or upon receipt of a notice of proposed debarment from another DoD Agency, during the performance of this contract.

4.6.4 Correspondence. The government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The government issued contract number is to be referenced on all official communication starting upon notice of award.

4.6.7 Records. All records created and received by the contractor in the performance of this contract shall be maintained and readily accessible. Records shall remain the property of the government.

4.6.8 Insurance. The contractor shall obtain the necessary insurance as required by FAR part

28.3. The minimum amounts of insurance will be maintained IAW FAR 28.307-2.

4.6.9 Data Rights. The government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be government owned and are the property of the government with all rights and privileges of ownership/copyright belonging exclusively to the government. These documents and materials may not be used or sold by the contractor without written permission from the CO. All materials supplied to the government shall be the sole property of the government and may not be used for any other purpose. This right does not abrogate any other government rights.

4.6.10 Fire Prevention. The contractor shall take all necessary precautions to prevent fires in the units and contractor-furnished and government-furnished facilities while performing any work under this contract. In the event fires do occur, the contractor shall immediately notify the Base Fire Department at 911. The contractor shall then notify the requiring activity and the CO. The contractor shall brief and document its employees monthly in fire safety issues and procedures in reporting fires.

4.6.11 Hazardous Materials.

1) Prior to use, the contractor shall provide the Base Hazardous Material Pharmacy, through the CO, a list of all hazardous materials the contractor brings onto government property and shall submit and AF Form 3952 along with a Safety Data Sheet (SDS) for each Hazardous Chemical listed in OSHA Hazard Communication Standard 29 CFR 1910.1200. The purpose of the inventory is to provide information for Emergency Planning and Community Right-to-Know Act (EPCRA) reporting.

2) Any products that meet the criteria of “Hazardous Waste” must be bar coded and tracked until permanently removed from government property. Criteria for identifying hazardous waste are contained in Subpart C of 40 CFR Part 261. NOTE: Products containing chlorofluorocarbons (CFC’s) or ozone depleting substances shall not be allowed or approved for use.

3) The contractor shall ensure that all contractor employees complete the local Air Force

Hazardous Communication, HAZMart, and hazardous waste training. The contractor shall appoint a primary and alternate HAZMART and Hazardous Waste monitor. Monitors are responsible for training all contractor personnel regarding hazardous material containers maintained on base and complete SDSs immediately upon receipt of new chemicals, products, or materials.

4.6.12 Inclement Weather. If the base closes due to inclement weather, the contractor will be released, by the installation commander, with the general population of the base at no decrement to contract price. The contractor will follow the local procedures for reporting in inclement weather as advertised on local television and radio stations.

4.6.13 Section 508 Compliance. The contractor shall support the government in its compliance with Section 508 throughout the development and implementation of the work to be performed. Section 508 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794d) requires that when federal agencies develop, procure, maintain, or use electronic information technology, federal employees with disabilities have access to and use of information and data that is comparable to the access and use by Federal employees who do not have disabilities, unless an undue burden would be imposed on the agency. Section 508 also requires that individuals with disabilities, who are members of the public seeking information or services from a Federal agency, have access to and use of information and data that is comparable to that provided to the public who are not individuals with disabilities, unless an undue burden would be imposed on the agency.

4.7 SECURITY

4.7.1 General

4.7.1.1 The contractor shall comply with all base security regulations and with actions dictated by force protection condition changes/measures. For real-world situations/exercises, changes to force protection conditions could impact contractor performance of work and can include denial of access to the installation to perform work.

4.7.1.2 The contractor and its employees shall comply with all base traffic regulations.

4.7.1.3 Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within contractor-owned or privately owned vehicle while on Air Force installations.

4.7.1.4 The contractor shall report suspicious activity to Security Forces Base Defense Operations Center at 301-981-7222 in a timely manner.

4.7.3 Security Clearance Levels. Contractor personnel performing work under this contract is not required to have an active security clearance at time of the proposal submission, or at any time during the performance of the contract.

4.7.4 Additional Security Requirements:

4.7.4.1 Physical Security. The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

4.7.5 Contractor Access To Air Force Installations. All contractor employees will be subject to a criminal history background check IAW Air Force Manual (AFMAN) 31-113, Installation Perimeter Access Control. Vehicle registration, proof of insurance, and a valid driver's license must be presented for vehicles. Installation Commanders may deny access and credentials based on information obtained during identity vetting that indicates the individual may present a threat to the good order, discipline, and morale of the installation.

4.7.5.1 Due to the suspension of the Trusted Traveler program, all escort authority for installation access to JBA is also suspended, indefinitely. Unofficial visitors must request an Unofficial Visitor Base Pass from the VCC. Passes may be requested through JBA's new base access program called DBIDS Virtual Enrollment and Pass System (DVES).

4.7.5.2 The JB Andrews Visitor Control Center (VCC) requires requesting base access through DVES at least 3 days (72 hours) prior to the planned visit. The VCC will create the pass and send the pass via email to the sponsor, who in turn will forward the pass to their guest. The guest can then print out the pass (recommended) or electronically present the pass via their mobile phone, tablet, or other electronic device, to a Defender at any of JBA's Base Entry Control Points to enter the installation. As an added convenience to those who already possess a state-issued REAL-ID Act compliant Identification Card or Driver's License, their base access permissions can be programmed on their ID, eliminating the extra step of printing the pass. The guest would simply present to the base entry Defender their ID to scan in order to be granted access to the installation. Passes may be requested through JBA's new base access program called DBIDS Virtual Enrollment and Pass System (DVES). State-issued driver’s licenses and identification cards with the statement of "Not Valid For Federal Purposes," "Federal Limits May Apply" or any other similar phrases can no longer be used for establishing identity.

4.7.5.3 To receive a DBIDS card you will need the following:

1) Sponsorship Paperwork (Long-term request letter signed and given by a 577 Sponsor)

2) Valid Driver's License compliant w/ REAL ID ACT, Passport, or Valid State ID

3) Current Vehicle Registration w/ Expiration Date

4) Current Vehicle Insurance w/ Expiration Date

4.7.6 During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel. The contractor shall be responsible for prompt return of credentials and vehicle passes for 1) any employee who no longer requires access to the work site; 2) upon request by a CO; and 3) upon completion or termination of the contract. The prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office. Failure to comply with these requirements may result in withholding of payment.

4.8. SAFETY

4.8.1 OSHA Requirements. It is the contractor's responsibility to ensure its employees and managers have a comprehensive understanding of and full compliance with OSHA requirements. Detailed information is available on the OSHA website at http://www.osha.gov.

It is the contractor's sole responsibility for compliance with OSHA, Public Law 91-596. The contractor shall comply with all federal, state, and local laws, and Air Force Instructions for the protection of their employees while working on an Air Force Installation or property. The protection of contractor employees is exclusively the obligation of the contractor. Contractor shall manage all work areas to ensure the safety of building occupants, base personnel, or visitors in or near the areas.

4.8.2 Mishap Reporting. Contractor must ensure that personnel are properly trained on the equipment they are tasked to operate. The contractor shall develop site specific mishap reporting procedures which result in damage to government property or injury to Air Force personnel. These procedures are to be included in the safety and health plan for review. In accordance with AFI 91-202, AFMC Supplement, Safety Program, the contractor shall submit a Safety and Health Plan to the CO for review and acceptance by the safety office prior to contract award.

4.8.1 Safety Equipment. The contractor shall furnish personal safety equipment for its employees in performance of this contract. Safety equipment includes shoes or boots, eyewear, respirators, hearing protection, gloves, and harnesses.

4.8.2 Safety Threats. The government reserves the right to restrict the employment, under this contract, of any contractor employee, or prospective contractor employee who is identified as a potential threat to health, safety, security, general wellbeing, or the operational mission of the installation and its population. Contractor shall perform background checks, at contractor's expense, to ensure that said employee has not been convicted of any sexual crime or any crime against children.

4.8.3 Substance Abuse Testing. The consumption of alcoholic beverages or illegal drugs by contractor personnel, while on duty, is strictly forbidden. Contractor employees shall be subject to substance abuse testing as a result of a mishap investigation when an individual’s actions or inactions are suspected as factors in a mishap sequence. The CO or COR may identify the employees to be tested and the drugs and substances for which those employees must be tested. The service provider shall accomplish the specified testing using a certified (i.e., a certified lab that meets Department of Health and Human Services (DHHS)/ Substance Abuse and Mental Health Services Administration (SAMHSA) certification) medical substance abuse testing facility. Results of the test(s) shall be provided to the government solely for the purpose of completing an investigation. The contractor shall immediately remove any employee who is found to be under the influence of alcohol or drugs.

SECTION V

APPENDIX 1

DEFINITIONS

Contract Administrator (CA). The individual within the contracting office who performs the day-today administration of the contract. The contract administrator may also be the contracting officer.

Contracting Officer (CO). The duly appointed Government agent authorized to award or administer contracts. The contracting officer is the only person authorized to contractually obligate the Government.

Defect. Any non-conformance with requirements specified in the contract.

Fair Wear and Tear. The deterioration of items attributed to normal usage.

Government Furnished Property (GFP). Facilities, equipment, tools, supplies, parts, or any other items furnished for the concessionaire's use by the Government.

Contracting Officer Representative (QA or COR). Individual who monitors a Contractor on a daily basis and who is involved in every aspect of a contract to ensure the Contractor is in compliance with that contract.

ACRONYM LISTING

AFI Air Force Instruction ADPE Automated Data Processing Equipment AFOSH Air Force Occupational Safety and Health AGE Aerospace Ground Equipment CM Contract Manager CO Contracting Officer COR Contracting Officer Representative DV Distinguished Visitor FC Functional Commander IAW In Accordance With VCC Visitor Control Center

ATTACHMENT 1

VC-140 Paint Scheme (Presidential Support)(See para 1.7)