This is a Statement of Work (SOW) for the removal and disposal of two adjacent electric lateral file system units at the FEMA Region 9 Office located at 1111 Broadway, Suite 1200, Oakland, California, 94607. The contract is Firm-Fixed-Price with a 60-calendar-day performance period from the date of award. All scheduling shall be mutually agreed upon between the Government and Contractor, with 24-hour notice required for work requests. Work is expected primarily outside normal business hours (Monday–Friday, 7:00 AM–5:00 PM), subject to Contracting Officer approval and coordination with the on-site point of contact.

The primary scope includes dismantling and removing two MediaStation Electrical Lateral File units (Model No. SYS-120-1611-US, dimensions 129" L x 48" D x 106" H), disposing of all associated components and accessories, removing floor anchors with patching, disconnecting electrical components using lockout-tagout procedures, and disposing of waste through recycling or landfill. The contractor must protect existing flooring with temporary protection, implement dust control measures, patch and paint affected wall surfaces using Dunn-Edwards Winter Morn interior eggshell paint, repair and restore the suspended ceiling tile grid with all required components, furnish and install matching carpet tile and cove base, and relocate four 2'x4' LED light fixtures. Additionally, the contractor must furnish, install, and terminate four CAT-6 homerun data cables from the IT server room. Two optional line items include furnishing and installing electrical and data outlets at two designated locations with homerun connections to the IT server room. The contractor is responsible for all damage caused by their work, must maintain a clean working environment, comply with all applicable regulations and UL safety requirements, and carry comprehensive insurance coverage including $1 million workers' compensation, $1 million commercial general liability with $2 million aggregate, $1 million employer's liability, $1 million business automobile, and $5 million umbrella liability. All contractor personnel must provide valid government-issued photo identification and undergo background investigations commensurate with facility access requirements.

View the file

Other files

File Type Posted
70FBR926Q00000031.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

A. GENERAL INFORMATION

1. Title of Project: Lateral File Machine Removal

2. Scope of Work: The contractor shall provide all resources necessary to remove and dispose of a lateral filing system at the Region 9 Office located at 1111 Broadway, Suite 1200, Oakland, California, 94607.

3. Performance Period: The contractor shall complete the work required under this SOW in 60 calendar days or less from date of award, unless otherwise directed by the Contracting Officer (CO).

All scheduling of services shall be mutually agreed upon between the Government and the Contactor prior to the start of services. The contractor shall be given 24-hour notice for when work is required and requested.

Work performed is expected to be outside of normal business hours, depending on specific tasks.

Business hours are Monday through Friday, 7:00 am to 5:00 pm, except holidays. All work performed shall be approved by the CO and coordinated with the on-site point of contact.

4. Type of Contract: Firm-Fixed-Price

B. GENERAL

Work shall proceed expeditiously and during schedule timeframes as coordinated with the on-site point of contact. The contractor shall maintain a clean working environment and remove, from the property of the FEMA facility, all trash, debris, and any broken or unusable systems that accumulate during the completion of the installation.

The contractor’s employees shall provide a valid, government-issued photo ID to enter the FEMA facility.

The contractor shall be responsible for damage to building property and shall repair and/or replace the damaged property. Repairs shall be made, at the contractor’s expense, to correct any building damage caused by the contractor team, including but not limited to damage to walls, ceiling, electrical components, and floors. Any building damage shall be restored to the original condition it was in prior to the start of the project. This applies to all tasks in this SOW.

The contractor and each of its employees shall comply with all applicable local, state, federal, and authority rules, regulations, and practices. All electrical components shall meet UL safety requirements.

The contractor shall also be responsible for all injury to persons or damage to property that occurs as a result of the contractor’s negligence and shall take proper safety and health precautions to protect the work, the workers, the public, and the property of others.

C. STATEMENT OF WORK

Lateral File System Removal

a. Dismantle, remove, and dispose of two adjacent electric lateral file system units.

i. Units: Two

ii. Model: MediaStation Electrical Lateral File (Model No. SYS-120-1611-US)

iii. Dimensions (each unit): 129” L x 48” D x 106” H.

iv. Protect existing carpet tile and flooring along the equipment removal path with temporary floor protection suitable for rolling loads.

v. Standup dust protection measures to minimize spread of dust to nearby cubicle areas.

b. Remove all components, supports, and accessories associated with the lateral file machines.

c. Remove floor anchors and ensure any penetrations are patched and flush with existing substrate, as applicable.

d. Disconnect and remove electrical components associated with powering each lateral file machine; lockout-tagout (LOTO) procedures.

e. Dispose of waste materials through appropriate means of off-site recycling or landfill.

f. Patch and paint wall surfaces affect by file system removal. Paint to match existing wall color of local area.

i. Paint Type: Dunn-Edwards Winter Morn, interior eggshell paint.

g. Repair and restore the suspended ceiling tile grid.

i. Furnish and install all required grid components including tees, hanger wires, and other miscellaneous accessories as necessary.

ii. Supply and replace damaged or missing ceiling tiles within the affected area.

h. Furnish and install carpet tile and cove base within footprint affected by lateral file removal.

i. Carpet tile and cove base shall match existing flooring in color, texture, and style.

i. Relocate (4) 2’x4’ LED light fixtures to conform with placement of the surrounding area’s lighting system.

j. Furnish, install, and terminate (4) homerun CAT-6 data cables from IT server room and terminate at cubicle cluster next to lateral file system removal location.

OPTIONAL LINE ITEMS

k. Furnish and install (1) electrical outlet and (1) data outlets at location #1 as designated by FEMA representative; homerun connections to IT server room.

l. Furnish and install (1) electrical outlet and (1) data outlets at location #2 as designated by FEMA representative; homerun connections to IT server room.

D. PERMITS, ROYALTIES, AND LICENSES

The contractor shall, without additional an expense to the Authority, be responsible for obtaining all licenses, certifications and permits which are necessary to fulfill the requirements of the Statement of Work.

The contractor shall also obtain and pay the costs of any royalties and licenses for any patented or copyrighted items used in the performance of work.

Building insurance requirements for successful vendor (proof required and must be submitted before the commencement of work).

a. Workers’ compensation Insurance as required by state law in the minimum amount of one million dollars.

b. Commercial general liability insurance in the minimum amount of one million dollars that includes a general aggregate in the minimum amount of two million dollars

c. Employer’s liability insurance in the minimum amount of one million dollars.

d. Business automobile insurance in the minimum amount of one million dollars.

e. Umbrella liability insurance in the minimum amount of FIVE million dollars

E. CONTRACTOR PERSONNEL

The Contractor shall provide qualified personnel to perform all requirements specified in this

SOW.

Contractor’s employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities.

The Contractor shall ensure Contractor employees always present a professional appearance and that their conduct shall not reflect discredit on the United States or the Department of Homeland Security. The Project Manager shall ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations, and policies concerning safety and security.

The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons.

Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

The Project Manager shall be available to meet with the COR upon request to present deliverables, discuss progress, exchange information, and resolve emergent technical problems and issues. These meetings shall take place via teleconference, email, and/or phone.

The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows XP and Microsoft Office Applications).

Inspection and Acceptance of deliverables shall be completed in accordance with FAR 52.212.

Section 508 Compliance: Pursuant to Section 508 of the Rehabilitation Act of 1973 (29 U.S.C.

794d) as amended by P.L. 105-220 under Title IV (Rehabilitation Act Amendments of 1998) all Electronic and Information Technology (EIT) developed, procured, maintained and/or used under this contract shall be in compliance with the “Electronic and Information Technology Accessibility Standards” set forth by the Architectural and Transportation Barriers Compliance Board (also referred to as the “Access Board”) in 36 CFR Part 1194. The complete text of Section 508 Standards can be accessed at http://www.access-board.gov/ or at http://www.section508.gov.

F. SAFETY

The contractor shall perform all its activities pursuant to this contract in a safe manner.

The contractor shall assume responsibility on the job site for the actions of all its personnel and subcontractor(s) who are associated with performance on this contract. The contractor shall take adequate measures to prevent injury to the public or Authority property on the job site

G. SECURITY

All individuals will be U.S. citizens. The contractor shall follow the standards established within DHS and FEMA policy.

For Official Use Only (FOUO) Information:

In accordance with DHS Management Directive 11042.1 contractors, consultants and others to whom access is granted will abide by 11042.1; DHS policy regarding the identification and safeguarding of sensitive but unclassified information originated within DHS. It also applies to other sensitive but unclassified information received by DHS from other government and non-governmental activities.

The contractor will:

1. Be aware of and comply with the safeguarding requirements for “For Official Use Only” (FOUO) information as outlined in this directive.

2. Participate in formal classroom or computer-based training sessions presented to communicate the requirements for safeguarding FOUO and other sensitive but unclassified information.

3. Be aware that divulging information without proper authority could result in administrative or disciplinary action.

Contractors and Consultants shall execute a DHS Form 11000-6, Sensitive but Unclassified Information Non Disclosure Agreement (NDA), as a condition of access to such information. Other individuals not assigned to or contractually obligated to DHS, but to whom access to information will be granted, may be requested to execute an NDA as determined by the applicable program manager. Execution of the NDA shall be effective upon date of the DHS Policy and not applied retroactively.

Foreign Travel and Government-Issued Equipment Per DHS and FEMA IT policy, FEMA employees and contractors are not authorized to take government-issued equipment, including cell phones, computers, or tablets such as iPads, outside of the United States regardless of the reason for travel. If government-issued equipment is required for official foreign travel, FEMA government employees may request a temporary loaner device through the Mobility Service Center, Office of the Chief Information Officer, Service Center for the duration of their trip. FEMA contractors must contact their contracting officer’s representative (COR) for further guidance.

If your device is detected as operating outside of the United States and its territories it will be disabled, and your information will be forwarded to the Office of Professional Responsibility for review.

Background Investigations

All contractor personnel who require access to DHS or FEMA information systems, routine access to DHS or FEMA facilities, or access to sensitive information, including but not limited to Personally Identifiable Information (PII), shall be subject to a full background investigation commensurate with the level of the risk associated with the job function or work being performed. FEMA’s Personnel Security Division (PSD) will determine the risk designation for each contractor position by comparing the functions and duties of the position against those of a same or similar federal position, applying the same standard for evaluating the associated potential for impact on the integrity and efficiency of federal service.

Low Risk without Information System Access

Contractor personnel occupying positions or performing functions with a Low Risk designation and who do not require access to DHS or FEMA information systems may undergo a Tier 1 investigation with a credit check and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract. (also reference Facility Access).

Low Risk with Information System Access

Contractor personnel occupying positions or performing functions with a Low Risk designation and who require access to DHS or FEMA information systems shall undergo a Tier 2 Suitability Background Investigation (T2) and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract.

Moderate Risk

Contractor personnel occupying positions or performing functions with a Moderate Risk designation shall undergo a Tier 2 Suitability Background Investigation (T2) and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract.

High Risk

Contractor personnel occupying positions or performing functions with a High Risk designation shall undergo a Tier 4 Suitability Background Investigation (T4) and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract.

Background Investigation Process

To initiate the request to process contractor personnel, the Contractor shall provide the FEMA Contracting Officer’s Representative (COR) with all required information and comply with all necessary instructions to complete Section II of the FEMA Form 121-3-1-6, “Contract Fitness/Security Screening Request.” The FEMA COR shall ensure that all other applicable sections of the FEMA Form 121-3-1-6 are complete prior to submitting the form to FEMA PSD for processing. The Contractor shall also provide the FEMA COR with completed OF 306, “Declaration for Federal Employment,” forms for all contractor personnel.

Contractor personnel who already have a favorably adjudicated background investigation, may be eligible to perform work under this contract without further processing by FEMA PSD if:

the investigation was completed within the last five years, it meets or exceeds the minimum requirement for the position they will occupy or functions they will perform on this contract, the contractor personnel have not had a break in employment since the prior favorable adjudication, and, FEMA PSD has verified the investigation and confirmed that no new derogatory information has been disclosed which may require a reinvestigation.

FEMA PSD will notify the COR of the names of the contractor personnel eligible to work based on prior, favorable adjudication. The COR will, in turn, notify the Contractor of the names of the favorably adjudicated contractor personnel, at which time the favorably adjudicated contractor personnel will be eligible to begin work under this contract.

For those contractor personnel who do not have an acceptable, prior, favorable adjudication or who otherwise require reinvestigation, FEMA PSD will issue an electronic notification via email directly to the contractor applicant/personnel that contains the following documents, which are incorporated into this contract by reference, along with a link to the Office of Personnel Management’s (OPM) Electronic Questionnaires for Investigation Processing (e-QIP) system and instructions for submitting the necessary information:

Standard Form 85P, “Questionnaire for Public Trust Positions”

Optional Form 306, “Declaration for Federal Employment”

SF 87, “Fingerprint Card” (2 copies)

DHS Form 11000-6, “Non-Disclosure Agreement”

DHS Form 11000-9, “Disclosure and Authorization Pertaining to Consumer Reports Pursuant to the Fair Credit Reporting Act”

FEMA PSD will only accept complete packages consisting of all of the above document and Standard Form 85P, which must be completed electronically through the Office of Personnel Management’s e-QIP system. The Contractor is responsible for ensuring that all contractor personnel timely and properly submit all required background information.

Once contractor personnel have properly submitted the complete package of all required background information, FEMA’s Personnel Security Division, at its sole discretion, may grant contractor personnel temporary eligibility to perform work under this contract prior to completion of the full background investigation if the Personnel Security Division’s initial review of the contractor personnel’s background information reveals no issues of concern. In such cases, FEMA’s Personnel Security Division will provide notice of such temporary eligibility to the COR who will then notify the Prime Contractor, at which time the identified contractor personnel will be temporarily eligible to begin work under this contract. Neither the Prime Contractor nor the contractor personnel has any right to such a grant of temporary eligibility. The grant of such temporary eligibility shall not be considered as assurance that the contactor personnel will remain eligible to perform work under this contract upon completion of and final adjudication of the full background investigation.

Upon favorable adjudication of the full background investigation, FEMA’s Personnel Security Division will update the contractor personnel’s security file and take no further action. In any instance where the final adjudication results in an unfavorable determination FEMA’s Personnel Security Division will notify the contractor personnel directly, in writing, of the decision and will provide the COR with the name(s) of the contractor personnel whose adjudication was unfavorable. The COR will then forward that information to the Contractor. Contractor personnel who receive an unfavorable adjudication shall be ineligible to perform work under this contract. Unfavorable adjudications are final and not subject to review or appeal.

Continued Eligibility and Reinvestigation

Eligibility determinations based on a Low Risk T1, Moderate Risk T2S or High Risk T4 are valid for five years from the date that the investigation was completed and closed. Contractor personnel required to undergo a background investigation to perform work under this contract shall be ineligible to perform work under this contract upon the expiration the background investigation unless and until the contractor personnel have undergone a reinvestigation and FEMA’s Personnel Security Division has renewed their eligibility to perform work under this contract.

Exclusion by Contracting Officer

The Contracting Officer, independent of FEMA’s Personnel Security Division, may direct the Contractor be excluded from working on this contract. Any contractor found or deemed to be unfit or whose continued employment on the contract is deemed contrary to the public interest or inconsistent with the best interest of the agency may be removed.

FEMA does not intend to share PII with this contractor, however it is possible during the course of their duties that they may come into contact with documents containing PII. Privacy and cyber security clauses are in place to ensure contractor compliance with proper PII handling procedures.