This is a Statement of Work (SOW) for the 99th Civil Engineer Squadron (CES) Water Tank Survey, dated December 12, 2025.
The 99th CES requires water quality condition assessment, inspection, washout, and disinfection services for nine water storage tanks: three elevated tanks and six ground storage tanks located at Nellis/Creech Air Force Base. The vendor must furnish all equipment, labor, and materials to complete the scope. Specific tank details are provided in a table identifying tank locations, shapes (sphere and cylinder), capacities ranging from 24,000 to 3,000,000 gallons, heights, bowl diameters, and last inspection dates. The vendor must deliver an Assessment and Disinfection Report summarizing all work performed with photographs, condition assessments, and detailed disinfection program results including pre- and post-testing documentation. Work must comply with 40 CFR Parts 141.401 and 141.723 and Nevada Division of Environmental Protection requirements. The vendor must be a Certified Water Operator per Nevada Revised Statutes 445A.875 through 445A.880. All work must be completed within 90 days of contract award. Access to Nellis AFB/MUNS controlled areas requires base pass approval through the 99 CONS Contracting Officer, with vendors submitting access requests at least 20 workdays prior (or 30 workdays for 10 or more personnel). Foreign-born personnel must provide citizenship proof or permanent residency documentation. The point of contact is Mr. James K. Hardiman at james.hardiman.2@us.af.mil or 702-652-2894.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW 99th CES Water Tower Tension Rod and Support Repair
3. Deliverable Requirements Vendor shall provide an Assessment and Disinfection Report which shall include:
• Summary of all work performed, a photo, and condition assessment for the Water Storage Tanks.
• Details of the disinfection program performed and all results of testing before and after disinfection and cleaning.
4. Vendor Qualification Requirements Vendor shall be a Certified Water Operator per the Nevada Revised Statutes 445A.875 through 445A.880 and any other requirements mandated by the Nevada Division of Environmental Protection.
5. Schedule All tasks associated with this Statement of Work shall be completed, including contract close-out, within 90 days after contract award.
6. Security and Access Requirements Entry control for Nellis/Creech AFB installations requires the permission of 99 ABW/CC. All vehicles entering the installation are subject to search. All personnel entering the installation who do not have unescorted access are subject to a criminal history check. The vendor will submit a base pass request for access for their employees to the 99 CES POC/sponsor. Vendor personnel born in a foreign country will provide proof of citizenship (i.e., Department of Homeland Security E-Verify and naturalization document), Permanent Residency Card or Work Permit. The vendor must contact and coordinate with the 99 CONS and/or 99 CES POC for completion of all access application documents for access to Nellis AFB/MUNS controlled areas at least 20 workdays prior, or 30 workdays prior for 10 or more personnel. After the base access application documents have been approved, vendor personnel will retrieve passes from the Visitor Control Center (4625 Fitzgerald Blvd, Nellis AFB, NV 89191/702-652-3216). If escorts are required, the sponsoring department shall appoint escorts for vendor personnel. Vendor will immediately notify the 99 CES POC if vendor personnel are barred from accessing the base or are detained and/or arrested by government security or civil law enforcement personnel.
END OF STATEMENT OF WORK