Demo of Wooden Gauge Monitoring Station Shelter
Solicitation number
140G0125Q0071
Issued by

About this file

This Statement of Work (SOW) details the demolition requirements for a discontinued wooden monitoring station shelter located in Springfield, Virginia. The project involves removing a 5'x5'x8' wooden structure with concrete footings and wooden stairs situated approximately 50 feet off Danbury Forest Drive on Fairfax County Park land. The contractor will be responsible for completely dismantling the structure, hauling away all debris, and returning the area to a near-natural state, with specific constraints including no use of heavy machinery and minimizing land disturbance.

Key contract specifications include a 90-calendar day completion timeline from the Notice to Proceed, normal working hours of 7:00am-5:00pm Monday-Friday, and strict environmental protection and site cleanliness requirements. The solicitation is a small business set-aside under NAICS code 238910 with a size standard of $19.0 million, targeting a construction project valued under $25,000. The U.S. Geological Survey Virginia Water Science Center is the sponsoring agency, with an anticipated contract award date of 04/09/2025 and quotes due around 04/01/2025.

View the file

Other files

File Type Posted
Questions_and_Answers_0002.pdf PDF
Sol_140G0125Q0071_Amd_0002.pdf PDF
Station_Pic_2_0001.jpg JPG image
Sol_140G0125Q0071_Amd_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
Station_Pic_1_0001.jpg JPG image
Attachment_2_-_Wage_Determination.pdf PDF
Sol_140G0125Q0071.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

I. GENERAL INFORMATION

A. Removal of discontinued wooden monitoring station shelter

B. Location: Lat. 38.80914° Long.-77.23318°, located approximately 50 feet off Danbury

Forest Drive, adjacent to the Long Branch stream channel, in Fairfax County, Springfield, VA, 22151.

C. To procure services to dismantle a discontinued data collection station which is a

5’x5’x8’ wooden shelter with concrete footings and wooden stairs. The awarded contractor will be removing the structure and hauling away all debris. Electrical components pictured in photo have been previously removed. No electrical or plumbing exists at this location.

II. WORK REQUIREMENTS

A. Technical Requirements.

1. Access to the site is made by entering from Danbury Forest Drive. The station is approximately 50' from the road. Land between roadway and shelter may be soft and difficult normal vehicles to access; heavy machinery may not be used. The shelter is on Fairfax County Park Authority property so care must be taken to minimize land disturbance between the roadway and shelter.

2. Work under this contract shall be performed in accordance with the requirements of this Statement of Work, specifications for this contract, and all applicable federal, state, and local regulations. It is very important that the successful bidder understand that this project includes removal of debris made by deconstruction.

B. Deliverables.

1. Contractor will be responsible for ensuring that all debris will be removed from the site.

2. Contractor will be responsible for returning area to as close to natural as possible.

3. The contractor should not reseed the area. Replanting vegetation will be the responsibility of the program office.

III. Pictures

IV. DELIVERIES OR PERFORMANCE

Commencement, Prosecution, and Completion of Work: Normal working hours shall be

7:00am-5:00pm, Monday –Friday. The contractor shall not work Saturdays, Sundays, legal holidays, or non-normal working hours, unless otherwise authorized by the Technical Liaison.

Request to work times other than normal hours shall be made in writing. The contractor shall employ sufficient personnel and equipment and order supplies to accomplish the work of this contract within 90 calendar days of the Notice to Proceed.

Progress Schedule: The Contractor shall submit a project schedule to the Technical Liaison for approval within five days after receipt of the Notice to Proceed. The progress schedule shall be a chart, which graphically depicts the proposed sequence to accomplish each work feature or operation. It shall show start dates and completion dates for each event on a horizontal time scale.

The progress schedule time scale shall begin with the Notice to Proceed and indicate the number of days to completion. The schedule will be the reference to which the contractor progress and effort are compared.

V. SPECIAL CONTRACT REQUIREMENTS

List of Subcontractors: For purposes of monitoring compliance with the insurance and payroll reporting requirements of this contract, the contractor shall furnish a list of all subcontractors to the Contracting Officer. This list shall be sent with the performance and payment bonds.

Transporting of Debris and Material: All materials and construction debris shall be removed from the work area and removed from the site daily.

Disposal of debris: All materials and debris shall be disposed of properly by the contractor.

Organization at the site: The site is located 50 feet east of Danbury Forest Drive on Fairfax

County Park land. This is the only structure at this location.

Site Cleanliness: The contractor shall maintain the site free of construction debris in contractor furnished containers (barrels, bags, dumpsters). The contractor maintains cleanliness of the work site by promptly removing debris, tools, and excess material.

Contractor Parking: Pull off parking is available off the shoulder of Danbury Forest Drive. See photo above.

Environmental Protection: The contractor shall perform all work and activities in accordance with local, state, and federal environmental regulations.

Outages and Interruptions: N/A

Notice to the Government of Delays: In the event the contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the contractor shall immediately notify the Contracting Officer, in writing, giving pertinent details. These data shall be informational only in character. Notice under this provision shall not be construed as a waiver by the Government of any delivery schedule or date or any rights or remedies provided by law or under this contract.

Pre-Construction Meeting: The Contractor shall have the project manager available on site for a pre-construction meeting prior to the commencement of work for this project. The Technical

Liaison will conduct a pre-construction meeting to review the requirements and conditions of this contract.

Additional:

All work listed shall be coordinated with the Technical Liaison.

CODES, STANDARDS AND DEPARTMENTAL PUBLICATIONS

The following manuals, handbooks, industry standards and codes are incorporated by reference.

American with Disabilities Act

ANSI/AIHA Z9.5 2003

Building Factory Mutual verification guidance

Construction Specifications Institute Standards

DOE Energy Conservation Standards 10 CFR Part 435

Facilities Standards for two public buildings service - GSA PBS-PQ100.1

ICBO Uniform Building Code

National Electrical Code

NFPA, National Fire Codes

NFPA, 101 LIFE SAFETY CODE

NFPA 30

NFPA 45

OSHA 29CFR 1910

Underwriters Laboratories Building Materials Directory

Underwriters Laboratories Fire Resistance Directory

Uniform Federal Accessibility Standards

Uniform Mechanical Code

File details come from the government source that posted it. Updated .