This document is a Statement of Work (SOW) for a contract opportunity to retrofit air handling units at the National Laboratory for Genetic Resource Preservation (NLGRP) in Fort Collins, Colorado. The objective is to replace pneumatic dampers and valve actuators with Direct Digital Control (DDC) actuators, and replace legacy DX 9100 controllers supporting hot and chilled water systems. The scope includes retrofitting controls for multiple air handling units, replacing the N2-AHU controllers with M4-CGM/XPM controllers, and replacing the legacy DX9100 controllers with new M4-CGM controllers.
The related federal contract opportunity is solicitation number 12805B24Q0611 for an Air Handling Unit Retrofit in Fort Collins, CO. This is a firm-fixed-price contract set aside for 100% small business. Offers are due by 5:00 PM EST on August 22, 2024. The contract will be awarded based on Lowest Price Technically Acceptable (LPTA) factors, evaluating technical acceptability and past performance. The government reserves the right to cancel the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_12805B24Q0611_Amd_0001.pdf | ||
| Attachment 2 - Wage Determination.pdf | ||
| Combined Sol - Synopsis.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture
Research, Education, and Economics Agricultural Research Service
STATEMENT OF WORK
TITLE: Johnson Controls Inc. Control Retrofit at National Laboratory for Genetic Resource Preservation
(NLGRP)
52.211-6 Brand Name or Equal (Aug 1999)
1. BACKGROUND:
The Agriculture Research Service (ARS) is the chief in-house agency of the United State Department of
Agriculture (USDA) located on Colorado State University (CSU) campus. The USDA ARS Facility department is responsible for providing an adequate and safe work environment supporting crops research and genetic resource preservation. National Laboratory for Genetic Resources Preservation (NLGRP) is located at 1111 South Mason Street, Fort Collins, Colorado, 80521-4500.
2. OBJECTIVE:
The National Center for Genetic Resources Preservation (NCGRP) of the United States Department of Agriculture (USDA), Agricultural Research Service (ARS), in Fort Collins, CO intends to a firm fixed for replacement and repairs to pneumatic dampers and valve actuators with DDC (Direct Digital Control) actuators.
Replacement of Legacy DX 9100 controllers supporting Hot and Chilled water systems with controls. This will include logical programming and a remap of existing graphics.
3. SCOPE:
3.1. Retrofit AHU-1 controls retrofit, AHU-2 controls retrofit, AHU-3 controls retrofit, AHU-4 controls retrofit, and CHWS/HWS DX 9100 replacement.
3.2. Replace N2-AHU Controller with M4-CGM/XPM controllers for AHU-1. Replace pneumatic damper and valve actuators with DDC actuators. Update programming and download/commission new devices for normal sequence of operations. Integrate new devices under existing network engine and remap graphics.
Location Support Staff 2150 Centre Ave, Bldg. D, Ste. 3225 • Fort Collins, CO 80526
Voice: (970) 492-7762 • Fax: (970) 492-7719 • E-mail: mike.bernal@usda.gov An Equal Opportunity Employer mailto:mike.bernal@usda.gov
3.3. Replace N2-AHU Controller with M4-CGM/XPM controllers. Replace pneumatic damper and valve actuators with DDC actuators. Update programming and download/commission new devices for normal sequence of operations. Integrate new devices under existing network engine and remap graphics.
3.4. Replace N2-AHU Controller with M4-CGM/XPM controllers. Replace pneumatic damper and valve actuators with DDC actuators. Update programming and download/commission new devices for normal sequence of operations. Integrate new devices under existing network engine and remap graphics.
3.5. Replace N2-AHU Controller with M4-CGM/XPM controllers. Replace pneumatic damper and valve actuators with DDC actuators. Update programming and download/commission new devices for normal sequence of operations. Integrate new devices under existing network engine and remap graphics.
3.6. Replace (2) legacy DX9100 controllers and for Hot and Chilled Water and System controls with the new M4-CGM controller. Convert DX9100 logic programming for CGM. and update for HW Pump VFD Controls. Run conduit and pull wire for HW Pump VFD Controls. Commission HWS and remap existing graphics.
4. PERIOD OF PERFORMANCE: Performance period will begin 30 days after acceptance of contract.
4.1. Recognized Holidays. Holidays to be observed are as follows. When scheduled services fall on an observed federal holiday contractor shall perform services on next business day.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Day Christmas Day Independence Day
4.2. HOURS OF OPERATION: The contractor is responsible for conducting business between the hours of 0730 to 1630 hours Monday through Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
4.3 Campus closures. When an unforeseen closure occurs on a regularly scheduled day of work, the Government shall have the following options:
4.3.1 Reschedule the work to be performed the following workday.
4.3.2 Reschedule the work on any day mutually satisfactory to both the contractor and Contracting Officer or his designated representative.
5. PREMISES TO BE SERVICED: The work to be performed under this contract will be located at NLGRP office structure on the main floor and mechanical room on third floor, located at 1111 South Mason Street, Fort Collins, Colorado.
6. SUPPLIES AND MATERIALS FURNISHED BY THE CONTRACTOR: The Contractor shall supply any additional PPE such as nitrite gloves, goggles, and face masks. All supplies and materials shall be of a type and quality that conforms to applicable Federal specifications and standards. All supplies and materials to be used in the performance of the work described herein are subject to the approval of the Contracting Officer Representative (COR).
6.1. Government- Furnished Property, Material, Equipment, or Information (GFM, GFM, GFE, or GFI) Refrigerant is not included under this Agreement and will be billed separately to the ARS.
7. RESPONSIBILITIES:
7.1 SUPERVISION OF EMPLOYEES. Contractor shall provide for supervision of employees. Prior to commencement of services under this contract, the Contractor shall furnish to the COR a list of employees who will work on-site performing the services, and the name of the individual who will be responsible for supervision of such employees and who will function as the Project Manager. The Project Manager shall:
7.1.1 Have the Contractor’s full authority to act on matters pertaining to the performance of services.
7.1.2 Designated work lead will be on-site or on-call whenever work is being performed.
7.1.3 Report damage to Government property, loss of keys or badges, personal injuries, and/or hazardous conditions to the COR within twelve work hours after occurrence.
8. PROPERTY: Except for reasonable wear and tear, the Contractor assumes full responsibility for and shall indemnify the Government for any and all loss or damage of whatsoever kind and nature to any and all Government property including any equipment, supplies, accessories, or parts furnished while in the Contractor’s custody and care for storage, repairs or services to be performed under the terms of this Contract, resulting in whole or in part from the negligent acts or omissions of Contractor, and subcontractor, or any employee, agent or representative of Contractor or subcontractor.
9. PERSONS: The Contractor will be responsible for any negligent or wrongful acts or omissions of the Contractor, his employees or agent’s incident to the performance of this contract. The Contractor will hold and save the Government harmless from all liability for any death or damage to all persons (other than the liability of the contract as provided under the Federal Employees Compensation Act) or to real or personal property, which results from the operation of, or incident to, equipment furnished by the Contractor.
The Contractor will not be responsible for any negligent or wrongful acts or omissions of the U.S. Department of Agriculture; its employees, the U.S. Department of Agriculture’s Cooperators, or their employees.
10. LIABILITY INSURANCE: The Contractor shall maintain such insurance as will protect him/her from claims under Workmen’s Compensation, General Liability, Property Damage and from any other claims for damages for personal injury including death which may arise from operations under this Contract, whether such operation by himself or by any subcontractor or anyone directly or indirectly employed by either of them.
11. LOST AND FOUND PROPERTY: The Contractor shall ensure that all articles of possible personal or monetary value found by the Contractor’s employees on the premises of this installation are turned over to the COR. At the time of their discovery, such items shall be tagged to identify the location at which they were found.
12. SECURITY: Only authorized Agricultural Research Service, Agricultural Research Service employees, the Contractor and Contractor’s employees shall be allowed in the building during performance of this contract. The Contractor will close any open doors, turn off lights (except those left on for security), and lock designated interior and all exterior doors. The building is considered closed for business from 4:30pm to 7:30am daily, all weekend hours, and Federal Holidays.
12.1. The contractor will coordinate with the COR or designated personnel assigned to get permission from the Contracting Officer prior to any deviations in work schedule such as after hours, weekends and holidays in accordance with service proposal.
12.2. SECURITY CLEARANCES: Upon contract award, all contractor personnel who will be working in the building will be required to complete a background investigation. Upon clearance, contractor personnel will work with the designated USDA, Agricultural Research Services employees to obtain a Linc Pass, which will serve as a permanent ID and authorize building access during business hours.
13. CONDUCTION OF CONTRACTOR AND EMPLOYEES: Contractor personnel shall not smoke or use vaporizing tobacco products in the building, as this is a non-smoking/non-vaporizing building.
Contractor personnel shall comply with the installation traffic laws and other regulations and instructions pertaining to the conduct of persons on Government facilities.
13.1. Contractor personnel shall in no event enter any area to which access is restricted unless such area has been specifically identified as an area in which services are to be rendered.
13.2. Contractor shall place his/her employees on notice if infraction of any of the above rules, regulations or prohibitions may be grounds for removal from Federal Property.
14. INSPECTIONS:
14.1 Definition: “Services” includes services performed, workmanship and materials furnished or utilized in the performance of services.
14.2 The COR may require the Contractor to remove any employee the COR deems incompetent, careless, or otherwise objectionable.
14.3 The COR, or other designated representative, will make random inspections of parts of the building where services are to be performed. Inspections will not interfere with or delay the Contractor’s work.
15. DEFICIENCIES:
15.1 Any deficiencies in performance found will be brought to the Contractor’s attention. Any changes to the scope of work will be required to notify the Contracting Office and Contract Officer Representative on site.
15.2 If any service performed does not conform to the contract, the Government may require the Contractor to requirements, at no increase to the contract amount.
16. ADMINSTRATIVE:
16.1. Contractor Documentation and Pre-Coordination Meetings: The contractor will attend site location pre-conference with designated facility personnel.
16.2. The contractor will meet with designated COR or facility staff at a minimum monthly to discuss issues or challenges related to this service contract. Feedback through surveillance will be shared between parties to ensure all expectations are being met in a timely manner.
16.3. All documentation related to this project will be turned over to the government prior to closing of project. This may include warranties, drawings, schematics, and as-builts.
17. PAYMENTS: For payment, all invoices must be submitted to the Department of Treasury's Invoice Processing Platform (IPP) via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. Payments shall be made monthly, in arrears, upon electronic submission of invoices to the IPP.
https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm
| STATEMENT OF WORK |
| 1. BACKGROUND: |
| 2. OBJECTIVE: |
| 3. SCOPE: |
| 7. RESPONSIBILITIES: |
| 14. INSPECTIONS: |
| 15. DEFICIENCIES: |
| 16. ADMINSTRATIVE: |