Attachment 1 - SOW.pdf

PDF 161 KB Posted

Attached to
NTTR Furniture
Solicitation number
F3G0CA4194AW01
Issued by

About this file

This document is a Statement of Work (SOW) and a related Federal Contract Opportunity for the replacement of office furniture at Building 200 on Nellis Air Force Base in Nevada.

The SOW outlines the scope of work, which includes the removal and disposal of existing furniture as well as the delivery and installation of new furniture as specified in Attachment 2 - Item List. The work must be completed within the standard working hours of 7:00 AM to 4:00 PM, Monday through Friday, excluding federal holidays. The contractor is responsible for cleaning up the work site, protecting the facilities from damage, and providing all necessary tools and materials. The contract will be awarded as a Firm Fixed Price contract, and the anticipated delivery timeframe is 90 days After Receipt of Order.

The Federal Contract Opportunity is a combined synopsis/solicitation for commercial products or services, with a solicitation number of F3G0CA4194AW01. It is a Request for Quotation (RFQ) set aside for small businesses under NAICS code 337211 with a size standard of 1,000 employees. Quotes are due by 4:00 PM PDT on Friday, August 30, 2024, and the contract will be awarded to the responsible vendor with the lowest-priced, technically acceptable quote.

View the file

Other files

File Type Posted
Attachment 4 - Pictures.pdf PDF
Combo Synopsis Solicitation (Updated).pdf PDF
QnA.pdf PDF
Combo Synopsis Solicitation (Updated).pdf PDF
Attachment 3 - Drawings.pdf PDF
Attachment 2 - Items List.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

For

Nevada Test Training Range (NTTR), Bldg 200

Nellis AFB, Neveda

Office Furniture Replacement

12 July 2024

SECTION I

DESCRIPTION OF SERVICES SPECIFIC TASKS

1. SCOPE OF WORK

This requirement is for furniture removal, disposal and clean up; as well as new furniture delivery & installation, as specified within Attachment 2 – Item List. The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary for the delivery and assembly of furniture as defined in this Statement of Work for building 200 on Nellis Air Force Base, NV. The services called for under this task order shall be performed in accordance with the terms, conditions, and specifications stated herein until such time as said services are completed to the satisfaction of the Government.

2. LOCATION

The project sites are located at Nellis AFB. Nellis Air Force Base (NAFB) is located approximately nine (9) miles north of downtown Las Vegas on Highway U.S. 93 (Las Vegas Blvd). NAFB consists of three main areas: the Main Base, Area II, and Area III. The specific project locations will be at building 200 located at 3770 Duffer Dr, Nellis AFB, NV 89191. Building 200 has a loading dock and a two-sided elevator nearby available to be utilized by the contractor.

3. DESCRIPTION OF WORK

Contractor shall provide management, personnel, labor, tools, equipment, transportation, materials and services necessary for the removal of furniture and the delivery/installation of new furniture for building 200 specified within Attachment 2 – Item List. The contractor must:

3.1 Clean-up and haul away of waste to include the preexisting furniture that is not identified for reutilization (Desks, Chairs, etc.).

3.2 Provide dump slips for all disposed furniture items identified by the customer.

3.3 Patch existing mounting bracket screw holes and ensure secure mounting of draperies.

3.4 Touch-up all nicks and scratches on the furniture that occurs during installation.

3.5 Remove all packing materials, debris, and cartons from the job site daily.

3.6 Provide all protective materials to protect the interior of the building, including but not limited to, all floors, walls, door frames, thresholds, etc. from damage and soil during the move and shall cover the floors with protective materials. Adhesive tape must not be used to secure protective materials.

3.7 Notify Customer for the final inspection. Final clean-up will be completed prior to any inspection. All project documentation is required within 30 days of acceptance.

4. FACILITIES DAMAGE

The contractor and customer shall conduct an installation walk-through before the installation date and prepare a list which annotates any pre-existing damage at the new location. The contractor and customer shall sign off on this list and provide it to the contracting officer. The contractor shall correct at contractor’s expense or pay the Government to repair any building damage caused by the installation team, including damage to walls, ceiling, and floors. Restore the building to the condition it was in at the start of furniture installation.

5. WORKING HOURS

Working hours for the Contractor shall normally be between the hours of 7:00 A.M. and 4:00 P.M., Monday through Friday, excluding Federal holidays and the day after Thanksgiving. If the Contractor desires to work during periods other than the above, he/she must identify by letter to the Contracting Officer at least five working days in advance of the dates desired and identify the work that will be accomplished if approval is given. The Contractor shall not be reimbursed for any changes or work accomplished outside the scope of the contract without prior approval by the Contracting Officer. In addition to the above, close coordination with the Government must be maintained.

6. COMPLETION

Upon completion of installation, the contractor shall:

Protect all warranties by immediately correcting all omissions, mistakes, or damage.

Review the installation of the site with the customer to prepare a punch list of any problems that needs corrected.

Remove and replace any defective product or material that has been delivered to the site.

Correct all other punch list items, to the satisfaction of the Contracting Officer within ten

(10) working days after completing the furniture installation.

The contractor shall maintain the work site free from debris and trash daily.

The Contractor shall notify the customer for the final inspection. Final clean-up will be made prior to any inspection. All project documentation is required within 30 days of acceptance.

Remove all old furniture debris from the project area and dispose of it in accordance with applicable federal, state, and local requirements.

Debris will be transported in a safe and appropriate manner in accordance with applicable federal, state, and local requirements.

7. ADDITIONAL INFORMATION

7.1 Warranty: All products shall include the standard commercial warranty.

7.2 Disposal: Contractor is responsible for the removal of debris and trash daily. No trash or debris shall be disposed of on the base or any other Federal Lands, nor shall it be disposed of in violation of any Municipal, County, or State Ordinances. Contractor may provide trash bins for debris, but the bins must not be filled beyond the height of the bin walls and shall be emptied regularly. The Government is not responsible for non-construction debris dumped in a container without proper posting and reasonable security measures to prevent local use.

7.3 Protection of Property: The contractor shall provide all protective materials to protect the interior of the building, including but not limited to, all floors, walls, door frames, thresholds, etc. from damage and soil during the move and shall cover the floors with protective materials. Under no circumstance shall adhesive tape be used to secure the protective materials.

SECTION II

GENERAL INFORMATION

1. CONTRACTOR PERSONNEL REQUIREMENTS

The contractor shall provide the name of the responsible person who has full authority to act for the contractor on all matters relating to the performance of this contract. The name of this person or alternate(s) who shall act for the contractor when the responsible person is absent shall be designated in writing to the contracting office. Normal duty hours for Nellis AFB are 08:00 am to 04:00 pm, Monday through Friday excluding Federal Holidays.

2. ADDITIONAL CONTRACTOR PERSONNEL REQUIREMENTS

Construction personnel will comprise of cleared U.S. citizens only. All contractor and Subcontractor employees must be vetted prior to entrance into the facility. Therefore, the contractor shall submit to the Government GSSO’s, a NTTR Visit Request form (Will be provided at time of award) identifying each employee requiring access to the project site. Additionally, the contractor shall provide the GSSO’s with a daily employee roster (EAL) which will document the personnel performing work for the day. U.S. citizens must perform all phases of construction.

The Government Security Manager will maintain documentation and logs of all construction personnel, construction material delivered to the site, details of each phase of construction, and any anomalies or issues which may have occurred.

3. UNIFORM AND APPEARANCE

Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. While on duty, all employees shall wear a company unique uniform of the style and color normally used by industry. The uniform shall be always clean and neat in appearance.

4. SAFETY

There are no identified hazards on the designated property. The fact that no conditions have been identified does not warrant or guarantee that hazards do not exist, or that work-around procedures will not be necessary. Compliance with the OSHA and other applicable laws regulations for the protection of employees is exclusively the obligation of the contractor.

No processes or materials shall be employed in such a manner that they will introduce additional hazards into occupied spaces. Further, the government will assume no liability or responsibility for the contractor’s compliance or non-compliance with such requirements.

2. LOCATION
3. DESCRIPTION OF WORK
4. FACILITIES DAMAGE
5. WORKING HOURS
6. COMPLETION
7. ADDITIONAL INFORMATION
SECTION II GENERAL INFORMATION
3. UNIFORM AND APPEARANCE
4. SAFETY

File details come from the government source that posted it. Updated .