Attachment_1_SOW.pdf

PDF 393 KB Posted

Attached to
RAWLINS CAMPGROUND VAULT PUMPING Federal contract opportunity
Solicitation number
140L6224R0005
Issued by
Department of the Interior Bureau of Land Management Wyoming Region

About this file

This document is a Statement of Work (SOW) for vault pumping services for the Rawlins Field Office Recreation Sites. The intention is to obtain vault pumping services for 1 base year with 4 option years. The contractor shall provide all labor, supplies, supervision, materials, equipment, mileage, and transportation necessary to clean and pump the vault type toilets and dispose of the waste properly. The specific facilities to be pumped are listed, including the number of double and single units at each site. The SOW outlines the pumping and disposal procedures, including contractor equipment specifications such as a septic tank truck, vacuum pump, and long-handled grappling device. The contractor must complete the pumping within 72 hours of receiving a request from the Government. A hosted pre-bid site visit has been scheduled for July 11, 2024, and the solicitation number is 140L6224R0005.

View the file

Other files for this federal contract opportunity

Other files attached to RAWLINS CAMPGROUND VAULT PUMPING, newest first.
File Type Posted
Map_with_coordinates_0004.pdf PDF
Sol_140L6224R0005_Amd_0004.pdf PDF
Sol_140L6224R0005_Amd_0003.pdf PDF
Sol_140L6224R0005_Amd_0002.pdf PDF
Sol_140L6224R0005_Amd_0001.pdf PDF
Question_and_Answer_for_Rawlins_Vault_Pumping_0001.docx DOCX document
B03_Attachment_2_-_WD.pdf PDF
Attachment_4_Bid_Schedule.pdf PDF
Sol_140L6224R0005.pdf PDF
A06_Attachment_3_Rec_Sites_Map_2023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK/SPECIFICATIONS FOR VAULT PUMPING FOR

RAWLINS FIELD OFFICE RECREATION SITES

Part 1: Work Statement

The intention of this purchase order is to obtain vault pumping services for the Rawlins Field Office Recreation Sites for 1 base year with 4 option years according to these specifications.

Contractor shall provide all labor, supplies, supervision, materials, equipment, mileage, and transportation necessary to provide cleaning and pumping of vault type toilets and dispose of the waste in a designated disposal area off Government property as per pumping procedures and disposal procedures in accordance with these specifications and all state and local law.

A full time employee of the Prime Contractor must be onsite during the vault pumping operation every time at each site.

Part 2: Work Location/Facilities

Facilities to be pumped according to these specifications include:

Shown on attached map

Bennett Peak Campground o 1 Double Unit

Corral Creek Campground o 1 Double Unit

Dugway Campground o 1 Single Unit

Encampment River Campground o 1 Double Unit

Prior Flats Campground o 1 Double Unit

Rim Lake Recreation Site o 1 Double Unit

Teton Reservoir Recreation Site o 2 Double Units

Continental Divide Campground o 1 Double Unit

See bid schedule for quantities associated with each location.

Part 3: Definitions

As used herein, the following terms shall have the meaning set forth below

a) Clean. “Clean” shall be defined as free of dirt, dust, spots, streaks, stains, smudges, litter, debris, and other residue.

b) Contracting Officer. The Contracting Officer is a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer

c) Contracting Officers Representative (COR). The Government employee designated by the Contracting Officer to be responsible for monitoring of Contractor’s performance

d) Disinfect. Cleaning in order to destroy any harmful microorganisms by application of an approved chemical agent.

e) Facility. A structure or assembly of units of equipment designated for a specific function

f) Contractor. Contractor refers to both the prime Contractor and any Subcontractors, the prime Contractor shall ensure that his/her Subcontractors comply with the provisions of this contract.

g) Frequency of Service. Once per year

h) Regular Working Hours. The Government’s regular working hours are from

8.am to 4 pm Mondays through Fridays except Federal Holidays or other days specifically designated by the Contracting Officer

i) Response Time. Response time is defined as the time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work location, with the appropriate tools, equipment, personnel, and materials ready to perform the required work.

Part 4: Contractor furnished Materials

The Contractor shall provide all facilities, equipment, materials, supplies and services to perform the requirements of this contract. Unless otherwise stated, the Government will not provide any materials to the Contractor. The Contractor will furnish commercially available products to disinfect and deodorize toilets and clean up the area directly surrounding the vault toilet at each recreation site. The disposal, transportation, and use of chemicals shall be in accordance with local, state and federal regulations.

Part 5: Management

The Contractor shall manage the total work effort associated with the custodial and maintenance services required herein to assure fully adequate and timely completion of these services. Included in this function will be a full range of management duties including, but not limited to, planning, scheduling, and quality control. The Contractor shall provide an adequate staff of personnel with the necessary management expertise to assure the performance of the work in accordance with the sound and efficient practices.

The Contractor shall employ an adequate work force to complete the work in accordance with the time and quality standards specified herein.

Part 6: Work Control/Response Time

The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking of work in progress.

The Contractor shall plan and schedule work to assure material, labor, personnel, and equipment are available to complete work requirements within the specified time limits and in accordance with the quality standards established herein. Verbal scheduling and reports on the status of service calls shall be provided when requested by the Contracting Officer’s Representative.

Services will be requested during the period May 15 through October 30. The Contractor shall complete pumping within 72 hours after receiving a request from an authorized Government Representative. The Government will be responsible for notifying the Contractor which vaults are to be pumped and when they will need the service. Service to be provided at least once per year. If any vault needs pumping more than once a year due to heavy usage, the contractor will be paid at the bid price for the vault needing pumped.

Part 7: Pumping Procedures

All liquid and solid waste will be removed from each vault whether by pumping or other approved methods.

The work will include washdown of the vaults and cleanup any incidental to the pumping operation.

All toilet vaults pumped shall be left in a clean condition.

Any debris generated during the cleaning and pumping process will be thoroughly cleaned, and all debris will be promptly removed by the contractor.

Add disinfectant to vaults for any unpleasant odors.

Part 8: Disposal Procedures

Contractor equipment specifications

Septic Tank Truck or equal with clean water storage and the capability to spray in order to clean the vault and clean and disinfect any residue created by the vault pumping operation: Minimum capacity of 1,000 gallons

Vacuum pump

Minimum three-inch intake valve and hose

Long handled grappling device

Backup warning device

Water for properly cleaning of vault toilets