This document outlines the scope of work for replacing components in a greenhouse located at the USDA Center of Grain and Animal Health and Research in Manhattan, Kansas. The contractor will replace the side vent hurricane hinge, rack gears, and ridge vent insect screening. Key requirements include removing and replacing the existing side wall vent system and driving components with larger durable parts, replacing the accordion pleated insect screening and mohair seal along the approximately 36 foot by 4 foot ridge vent, and ensuring the vent and ridge vent operate properly on the Link4 control system. The contractor must have commercial greenhouse experience and provide all necessary materials, tools, permits, and safety equipment. The work must be completed within 30 days of award under the solicitation number 12805B23Q0545 issued by the USDA Agricultural Research Service Plains Area for the greenhouse repairs at their research center location.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replacement of the greenhouse side vent hurricane hinge, rack gears and ridge vent insect screening in Building #543000B0064
USDA Center of Grain and Animal Health and Research
Manhattan, KS. 66502
Project Title: Replacing the greenhouse side vent hinge and insect screening on Building #7
1. Government Points of Contact
a) Contracting Officer (CO):
Connie Faulkner 970-305-6228 Connie.faulkner@usda.gov
b) Occupational Health and Safety Representative:
Jason Krantz 785-776-2733 jason.krantz@usda.gov
c) Engineer Project Manager (EPM)/Contracting Officer’s Representative (COR):
Mark McWilliams
(970) 631-7513 mark.mcwilliams@ars.usda.gov
d) Location Monitor (LM):
David Hinkson 785-539-5579 david.hinkson@usda.gov mailto:jason.krantz@usda.gov mailto:mark.mcwilliams@ars.usda.gov mailto:david.hinkson@usda.gov
A. Introduction At the USDA Grain and Animal Health Research Center (CGAHR) 1515 College Avenue, Manhattan KS, 66502. The greenhouse is a component of the Hard Winter Wheat Genetics Research Unit. It is a key component for their research and development.
B. Background C. The Greenhouse was built in 2011 and has been in service for 12 years. The typical life expectancy of a greenhouse is 10 to 20 years. Due to the extreme Kansas weather and continuous use. We have already done some major repairs. We’ve endured high winds and extensive hail damage. We have replaced damaged acrylic roof panels, and the ridge vent hinge in 2021. The greenhouse side vent hinge has deteriorated, and the top rail and the ridge socket is separating, and the hinge is coming apart. We would like to replace this hinge with a larger more durable hinge that can withstand the weather conditions of our location. The ridge vent accordion pleated screening and associated seal has deteriorated because of age and is needing replaced.
D. Scope
1. An onsite site walkthrough per-contract meeting is necessary. The work will consist of removing and replacing the existing exterior side wall vent. The exterior vent system’s driving system will also need to be replaced. All driving system components should be made of steel and will include a 3/8 drive shaft pipe. The 3 rack and pinion operators will also need replacing.
The 138” sidewall vent header and hinge will need to be replaced. The ¼” diameter hurricane hinge will need to be replaced with a larger 5/16” diameter hurricane hinge, or comparative in size (8mm). The side vents drive shaft hangers and upright supports as well as the acrylic panels and frame structure will be reused. The greenhouse is operated by the Link4 control operating system.
2. The ridge vent accordion pleated insect screening will also need to be replaced. A new mohair seal will also need to be installed with the new insect screening. The insect screening will need to fit on a ridge vent that is approximately 36ft long by 4 ft wide.
E. Applicable Documents Greenhouse drawings
2. Work Requirements
A. Technical Requirements
Disassembly of the vent system
1 The contractor shall isolate the vents driving system from operating during the vents hurricane hinge and driving components are being replaced.
2 The contractor shall verify that all applicable equipment is locked and tagged out and is tested to be non-operable.
3 The contractor shall disassemble the vent assembly from the 3 rack and pinion operators.
4 The contractor shall remove the driving system from the hangers and upright supports.
5 The contractor shall support the vent assembly while unfastening the top rail hardware from vent opening of the greenhouse wall and remove the vent assembly.
6 The contractor shall support the vent assembly on the ground and remove the lower ridge socket from vent assembly.
7 The contractor shall remove the hinge header assembly.
Assembly of the vent system
1 The contractor shall clean the surface area of the vent where the hinge will fasten.
2 The contractor shall seal and install the lower ridge socket side of the hinge to the vent assembly.
3 The contractor shall clean the greenhouse wall area where the top rail portion of the hinge will fasten to the wall.
4 The contractor shall install the hinge header assembly.
5 The contractor shall support the vent assembly to the greenhouse wall.
6 The contractor shall seal and fasten the top rail side of the hinge to the greenhouse wall.
7 The contractor shall re-install the side vent drive system on the hangers and upright supports.
8 The contractor shall install the 3 rack and pinion operators to the drive shaft.
9 The contractor shall time the rack and pinions to drive shaft to sinking the vent to open freely from closed to fully open positions.
10 The contractor shall install the driving motor onto the driving shaft.
11 The contractor shall set up Link4 operating system to the fully closed and fully open position, all limit switches to the vent system shall be calibrated to the Link4 controllers.
12 The contractor shall test the assembly to check for possible rainwater leakage internally and externally.
13 The contractor shall remove all lockout tagout devices.
14 The contractor shall ensure that the side vent is working correctly and that all work is complete.
15 After the system is back in service the location monitor and contractor shall inspect the overall operation of the system functions fully with the link4 operating system.
Ridge vent insect screening removal
1. The contractor shall removal all fasteners from the insect screening and remove the insect screening from the ridge vent
2. The contractor shall remove the fasteners from the greenhouse roof and remove the insect screening
3. The contractor shall remove the fasteners from the mohair seal and remove the mohair seal.
4. The contractor shall clean the old sealing compound and debris from the ridge vents outer edges.
5. The contractor shall clean the old sealing compound and debris from the greenhouse roof
Ridge vent new Insect screening replacement
1. The contractor shall measure the outer edges of the ridge vent and the size of the opening
2. The contractor shall measure and determine the proper size of the insect screening for replacement
3. The contractor shall measure the front edge of the ridge vent.
4. The contractor shall mark the location of the corners on the insect screening from the middle of the insect screening.
4. The Contractor shall cut the top leading edge of the first pleat at the markings made from the comers of the ridge vent.
5. The contractor shall carefully fold both sides of the accordion pleated insect screening at a 90-degree angle at the top cut down the pleats to the bottom edge of the insect screening.
6. The contractor shall install the top edge of the accordion screening to the outside edges of the ridge vent.
7. The contractor shall apply any needed sealer to the greenhouse for the installation of the mohair seal onto the front of the ridge seal of the greenhouse roof.
8. The contractor shall fasten the lower edge of the insect screening under the mohair seal.
9. The contractor shall cut the excess amount of the insect screening along the sides of the greenhouse roof.
10. The contractor shall apply any necessary sealer on both sides of the greenhouse roof.
11. The contractor shall install the mohair seal to the sides of the greenhouse roof.
12. The contractor shall install the sides of the insect screening under the mohair seal of the sides of the greenhouse where the ridge vent closes.
13. The contractor shall install any elastic strapping to the middle of the pleated insect screening to prevent the screening from losing it shape and protruding outside of the ridge vent and over the mohair sealing area.
14 The contractor shall ensure that fully open and closed limits are adjusted properly and fully function with the Link 4 operating system.
D. Deliverables
a. Before and after pictures will be taken to determine that the replacement of the vent meets acceptable standards for the Government. Costs are expected to remain within budget.
b. A final report will be prepared by the contractor and presented to the CO. with a description of any pictures being used to describe any deficiencies and ensure that all repairs have been properly completed.
c. The location monitor and contractor will inspect the vent to ensure it operates from fully open to closed positions to ensure no binding, popping, or dragging occurs. They will inspect that all operator limit switches are adjusted properly to stop the door at fully open and closed positions. The location monitor and contractor will ensure all seals are installed properly and make full contact with the vent top, sides, and bottom to minimize any leakage of water or heat.
d. The location monitor and contractor shall inspect the greenhouse Link 4 operating system is operating properly and is fully controlling the operation of the ridge and side vents.
3. Supporting Information
A. Required skills and resources.
a. Contractor skills
1. The contractor shall have skilled commercial greenhouse builders performing these repairs
b. Contractor Resources
1. The contractor shall provide all materials, parts, tools, and equipment needed to complete this project
2. The contractor shall obtain all necessary permits to perform this work.
3. The contractor shall provide all necessary materials to complete the replacement
4. All excess material, dirt, and debris shall be disposed of by the contractor.
5. Contractor shall provide all workers with necessary safety training and proper protective safety equipment (PPE): i.e., gloves, glasses, goggles, respirators, boots, hard hats, and safety straps.
c. Government resources
1. The Government will provide Storage areas
2. The Government will provide domestic Water 3.The Government will provide gas and electricity
4. The government will provide washroom facilities
B. Risks Assessment
a. Flying object debris: 10% highly likely.
1. Mitigating with Safety glasses, face shields 5% low risk.
b. Impact hazard from hammers and impact drivers: 10% highly likely.
1. Mitigating with impact resistant gloves 5% low risk.
c. Electric shock: 7% moderately high.
1. Mitigating factor lock out tag out devices installed 5% low risk.
d. Falls: 7%
1. Use of appropriate ladders and ladder feet, or upper ladder restraints 5% low risks
e. High head tool impact
1. Wear OSHA approved hard hats
C. Security
All contractors will report to the front office and will be screened for illness and citizenship or current work visa. They will be issued a contractor’s identification card once proper credentials have been validated.
D. Place of Performance The location of the work will begin at the USDA Center for Grain and Animal Health Research, (CGAHR) 1515 College Avenue, Manhattan KS., 66502.
E. Period of Performance These repairs will be completed no later than 30 days after the contract is awarded.
F. Special Considerations This work should be completed in moderate temperatures well above freezing.