Attachment 1 SOW.docx

DOCX document 31 KB Posted

Attached to
Z2DA--CON-NRM 668-24-103 Replace Roofing Buildings 1, 2, 3, and 31
Solicitation number
36C26026R0081
Issued by

About this file

This is a Statement of Work (SOW) for a Non-Recurring Maintenance project to replace aged roofing systems at the Mann-Grandstaff VA Medical Center in Spokane, Washington. The project, identified as 668-24-103, requires comprehensive construction services including labor, materials, tools, equipment, transportation, supervision, and related services for replacing roofing systems in Buildings 1, 2, 3, and 31. The total period of performance is 180 calendar days, with work to commence on Building 2 while other buildings' roofing phases are coordinated with the Government. The contractor must review hazmat survey reports for areas requiring abatement and follow project drawings and specifications, with this SOW taking precedence in cases of conflict.

Key administrative requirements include the contractor providing a secured File Transfer Protocol (FTP) site for electronic submittals due to VA email file size limitations of 5MB per message, delivery of as-built drawings and Operation and Maintenance manuals in hard copy 3-ring binders within 30 days of substantial completion, and coordination of contractor laydown areas with the Contracting Officer Representative during the pre-construction submittal process. The Government does not guarantee accuracy of provided information, and the contractor is responsible for assessing existing conditions and providing all equipment and supplies. The contract pricing structure includes a base item for all work per the SOW and four separately-priced deduct items covering Buildings 2, 3, 1, and 31 individually, with deduct item awards made at the sole discretion of the Department of Veterans Affairs based on available funding.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Project No. 668-24-103 Replace Buildings 1,2,3, and 31 Roofing Systems Mann-Grandstaff VA Medical Center Spokane, WA Feb 23, 2026

Attachments to this document include the following. Contact the CO if any items are missing.

· Project Drawings

· Project Specifications

· Hazmat Survey Reports

· 668-24-103 HAZ B1

· 668-24-103 HAZ B2

· 668-24-103 HAZ B3

· 668-24-103 HAZ B31

1. General

1.1. Provide construction services to include labor, materials, tools, equipment, transportation, supervision, and other services necessary for Project 668-24-103, Replace Buildings 1,2,3, and 31 Roofing Systems at the Mann-Grandstaff VA Medical Center, Spokane, Washington. Total project period of performance shall be 180 calendar days. The contractor will start work on Building 2 and coordinate with the Government on phasing the other buildings’ roofs.

1.2. In accordance with FAR 52.242-14, the Contracting Officer may, in writing, order the Contractor to suspend, delay, or interrupt all or any part of the work when weather conditions make performance unsafe or impractical.

2. Scope of Work

2.1. This Non-Recurring Maintenance (NRM) project will replace aged roofing systems in accordance with the project drawings and project specification. Review Hazmat survey reports for areas requiring abatement.

3. Performance of Work

3.1. Where conflicts exist between this SOW and the project specifications or project drawings, this SOW takes precedence.

3.2. Document transmission.

3.2.1. VA email servers limit file sizes to 5MB per message.

3.2.2. Construction Contractor shall provide a secured File Transfer Protocol (FTP) site to transfer all contract electronic submittals. The contractor shall send a corresponding email to the COR stating a file is ready for review for each electronic submittal FTP upload, an automatic email from the FTP site is sufficient. The FTP site shall be accessible by VA staff using Government Furnished Equipment (GFE).

3.3. As-Built Drawings and Operation and Maintenance (O&M) Manual.

3.3.1. The contractor shall deliver the as-built drawings and owner’s manual to the COR no later than thirty (30) days after substantial completion. O&M are to supplied to the COR as a hard copy in 3 ring binders.

3.3.1.1. Owner’s manual shall contain detailed step by step instruction for operation of all equipment as a system.

3.4. Contractor laydown will be coordinated with the COR during pre-construction submittal process. Any references to laydown areas in the project drawings or specifications are not guaranteed.

3.5. The government does not guarantee the accuracy or completeness of any of the information provided in the attachments to this SOW. The contractor shall make assessments to determine existing conditions prior to the inception of work.

3.6. The contractor will not have access to any Government-Furnished Equipment. All equipment and supplies used under the terms of this contract shall be the responsibility of the contractor.