Attachment 1-SOW Dated 9 Sept 22 4 Pages.pdf

PDF 646 KB Posted

Attached to
Dorm Lock Replacement Federal contract opportunity
Solicitation number
FA301623Q0072
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Dorm Lock Replacement, newest first.
File Type Posted
Questions and Answers 1-5.pdf PDF
Dorm Locks Front (2).pdf PDF
Dorm Locks Front (1).pdf PDF
Final Solicitation - FA301623Q0072.pdf PDF
Attachment 2-Salient Characteristics 6 Jun 23 2 Pages.pdf PDF
Questions and Answers.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

FOR

Installation of Door Locks for bldg. 10802, 10806, and

10650

JBSA-Lackland, TX.

09 Sept. 2022

STATEMENT OF WORK

502 CONS/JBKAE

JBSA Lackland, TX

F2MTR43053AW01

Dorm Lock Replacement

Attachment 1 1 of 4

1. DESCRIPTION OF WORK

Work to be accomplished: the contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to install 252 dormitory door keyed locks for each room, in Bldgs. 10802, 10806/950 Femoyer St, and Bldg.10650/1250 Femoyer St. JBSA-

Lackland, San Antonio, TX.

2. Specific requirements are as follows:

2.1 Remove existing Cipher/CAC enabled locks rom dormitories 10802/10806/10650 and turn over to the Government or disposition.

2.2 Contractor shall install 252 door locks, 84 in each dormitory.

2.3 Contractor shall install 504 remodeler plates.

2.4 Contractor shall provide all installation hardware.

2.5 Contractor shall remove and dispose of all excess material/debris (off-property) from packing/shipping at the end of each workday.

2.6 Contractor shall not work or store materials in a manner that would hinder or otherwise block pedestrian circulation to exit corridors and exit doors in the event of an emergency or fire.

2.7 If applicable, storage of materials shall be coordinated with Mr. Walborn (210) 671-

2164.

2.8 No loading dock/ramp available.

3. PRODUCT SPECIFICATIONS FOR BLDGS. 10802, 10806, 10650 All specifications are approximate:

4. LEVER LOCKSET: (252 TOTAL)

4.1 (84 EA Bldg.) Lever Lockset

4.1.1 Mechanical

4.1.2 Lever handle type

4.1.3 Cylindrical

4.1.4 Lockset Grade1

4.1.5 Style 9K Curved

4.1.6 Lockset Finish Satin Chrome

4.1.7 Keyway Type None

4.1.8 Key Type Not Keyed

4.1.9 Standards (ANSI) American National Standards Institute A156.2, (UL) Underwriters' Laboratories Listed

4.1.10 Lockset Fire Rating 3 hr.

4.1.11 Backset 2 3/4 in

4.1.12 Features Corrosion Treated Internal Steel Mechanisms

4.1.13 Handle Material Zinc

4.1.14 Includes 3-1/2 in D Rose Convex, Mounting Hardware

4.1.15 Location Type Commercial, Institutional

4.1.16 Lockset Performance Strength Extra Heavy Duty

502 CONS/JBKAE

JBSA Lackland, TX

F2MTR43053AW01

Attachment 1 2 of 4

4.1.17 4 Keys per lock

4.1.18 Required Door Thickness1-3/4 in to 2-1/4 in

4.1.19 Strike Dim.4-7/8 in x 1-1/4 in

4.1.20 Strike Type (ANSI) American National Standards Institute

5. KEYED CORES: (252 TOTAL)

5.1 (84 EA Bldg.)

5.1.1 Product Description: 1C 7 Pin Core, w/4 Keys for each core

5.1.2 2 Master Keys per building

5.1.3 1 Master key for all buildings

5.1.4 Pins: 7 Pin

5.1.5 Finish: Satin Chrome

6. REMODELER PLATE: (504 TOTAL)

6.1 (168 EA Bldg.)

6.1.1 5" Width x 14" Height

6.1.2 2-1/8" Hole near Bottom

6.1.3 Gauge: 0.032

6.1.4 Prepped for Thru-bolts

6.1.5 Satin Stainless Steel Finish

7. WORK HOURS AND SPECIAL CONDITIONS

When working at Government facilities, work shall be accomplished during normal duty hours

(0730-1630), Monday through Friday, unless otherwise approved by the Contracting Officer.

The contractor shall not schedule work on the following Federal Holidays: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Juneteenth Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving and Christmas. If the holiday falls on a

Saturday, it is observed on the preceding Friday. If the holiday falls on Sunday, it is observed on the following Monday. If a holiday falls on a scheduled service day, the contractor shall be responsible for rescheduling services for the first day post the holiday observance.

8. NON-STANDARD HOURS OF PERFORMANCE

Written approval from the POC’s must be received before proceeding with the work. The request shall be submitted at least five (5) work days prior to the proposed performance of work, and it shall indicate the day/days, time/amount of work, and reason why performance is necessary during nonstandard hours.

502 CONS/JBKAE

JBSA Lackland, TX

F2MTR43053AW01

Attachment 1 3 of 4

9. BASE FIRE REGULATIONS

The contractor shall comply with all Lackland AFB Post Fire Regulations. No welding shall be permitted without obtaining a welding permit issued by the Post Fire Department. All fire and safety regulations shall be enforced.

10. SITE MAINTENANCE AND CLEANUP

10.1 The contractor shall, as conditions permits, keep a clean and neat working environment, free of such items as excess trash, construction debris, etc., while performing the requirements of this contract.

10.2 All materials, such as, but not limited to: tools, debris, and trash that belong to the contractor shall be removed from JBSA Lackland at the end of each workday.

10.3 Contractor generated refuse shall hauled away from site to a disposal area located outside the physical boundaries of the installation.

10.4 All work performed shall be current to industry and code standards and ready for instantaneous use by the government (fully turnkey systems and components).

11. RECORDS MANAGEMENT

The contractor shall manage all data created for Government use or legally controlled by the

Government, in support of the functional activity or required by AF publication, IAW with the AF

Records Management procedures in Air Force Instruction (AFI) 33-322, Air Force Manual

(AFMAN) 33-363 and Air Force Instruction (AFI) 33-364 (or their subsequent replacements).

12. INSPECTIONS AND ACCEPTANCE

Inspection and acceptance will be at the project site by the Contracting Officer and/or

37 TRSS/DOR, Mr. Donald Walborn, (210) 671-2164/ Mr. Detra Whitfield (210) 671-6177.

502 CONS/JBKAE

JBSA Lackland, TX

F2MTR43053AW01

Attachment 1 4 of 4