Attachment 1 - SOW - Building Envelope Repair - HNRC Boston - 23MAY2024.pdf
PDF 513 KB Posted
- Attached to
- Building Envelope Repair - HNRC Boston
- Solicitation number
- 12305B24R0019
About this file
This document is a Statement of Work (SOW) for building envelope repairs at the Jean Mayer Human Nutrition Research Center on Aging (HNRCA) in Boston, MA. The SOW outlines the scope of work, including improvements to the curtainwall, storefront, and louver systems, replacement of precast concrete panel joint sealants, and roofing repairs. The work is divided into a base CLIN and three CLIN options, with the base CLIN addressing the exterior envelope system deficiencies and the options covering more extensive improvements to the curtainwall, storefront, and window systems. The project is associated with a federal contract opportunity, Solicitation 12305B24R0019, issued by the United States Department of Agriculture (USDA) Agricultural Research Service (ARS) for Building Envelope Repair at the HNRCA. The solicitation is a Request for Proposals (RFP) and is set aside for small businesses with a size standard of $19.0 million. The period of performance is 365 calendar days for the base item, with additional days for the options. A site visit is scheduled for July 24, 2024, and all questions must be submitted by July 31, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building Envelope Repairs Human Nutrition Research Center on Aging, (HNRCA) Boston, MA
STATEMENT OF WORK
PROJECT TITLE:
May 23, 2024
Building Envelope Repairs HNRCA, Boston MA
PROJECT LOCATION: Human Nutrition Research Center on Aging (HNRCA) 711 Washington Street, Boston, MA 02111
PROJECT SUMMARY
The Jean Mayer Human Nutrition Research Center on Aging (HNRCA) is a 15-story building in downtown Boston, constructed circa 1979-1981. The exterior shell of the building (the building envelope) consists of precast concrete panels, aluminum frame dual glazed windows and curtainwalls, and a concrete roof deck covered with thermoplastic and EPDM roof assemblies.
SCOPE OF WORK
BASE CLIN: Consists of improvements to mitigate the exterior envelope system deficiencies. Improvements include but are not limited to removing and replacing sealants at curtainwall, storefront, and louver systems, removing and replacing precast concrete panel joint sealants (vertical and horizontal). Other improvements will replace existing thresholds and repairing interior soffits and jambs at all openings.
CLIN OPTION 1: Consists of roofing improvements. Improvements include but are not limited to removing the existing roofing down to the metal deck at the 15th floor mechanical and elevator machine rooms and replacing the system with a new single-ply membrane roofing system. The 14th floor roof will be removed down to the concrete deck and be replaced with a new single-ply membrane roofing system.
The backside of the parapet wall will have the single-ply membrane extend up and under a new metal coping. All sealant at the parapet wall railing posts will be removed and replaced. The 4th floor roofing area will be removed down to the concrete roof deck and replaced with a new fluid applied roofing system.
CLIN OPTION 2: Consists of more extensive improvements to mitigate the exterior envelope system. Improvements include but are not limited to the removal and replacement of all identified curtainwall and storefront systems.
CLIN OPTION 3: Consists of more extensive improvements to include but are not limited to the removal and replacement of all identified window systems and identified storefront systems to include ADA entrances and masonry knee walls.
Building Envelope Repairs Human Nutrition Research Center on Aging, (HNRCA) Boston, MA
TECHNICAL REQUIREMENTS
The Scope of Work (SOW) is defined by the USDA Building Envelope Repairs, Jean Mayer Human Nutrition Research Center of Aging Plans and Specifications, dated July 20, 2023, that were prepared by The Johnson-McAdams Firm P.A., P.O.
Box 513 Greenwood, MS.
Supplemental General Requirements
USDA Division 01 General Requirements will be part of the Contract and are included as Attachment 3.
PROPOSAL
The Contractor’s Proposal shall be broken down into the various trades and shall provide sufficient detail to indicate an understanding of the project requirements.
The proposal shall contain separate line items for General Conditions, Contractor’s Overhead and Profit, Insurance, and Performance Bonds.
Separate Proposals shall be provided for the Base CLIN and each CLIN Option (1, 2 and 3).
Key Personnel
Contracting Officer (CO) Roger Ammons
270-540-1684 Roger.Ammons@USDA.GOV
ENGINEERING PROJECT
MANAGER/CONTRACTING
OFFICER REPRESENTATIVE
(EPM/COR
WAYNE
SHEKAILO
301-504-0805 302-854-8296
WAYNE.SHEKAILO@USDA.GOV
ADMINISTRATIVE OFFICER (AO) KATHI WILHELM 617-556-3312 KATHI.WILHELM@USDA.GOV
TUFTS UNIVERSITY FACILITIES
MANAGER (FM)
JOSEPH
CURTAIN
617-556-3340 Joseph.Curtain@tufts.edu
SAFETY, HEALTH, &
ENVIRONMENTAL MANAGEMENT
BRANCH (SHEMB)
REPRESENTATIVE
BONNIE
DISALVO
610-304-9999 BONNIE.DISALVO@USDA.GOV
ARCHITECT-ENGINEER (A-E)
THE JOHNSON-MCADAMS FIRM,
P.A.
CHIP JOHNSON 662-455-4943 CHIP.JOHNSON@JMCFIRM.COM
ATTACHMENTS:
Attachment 2: Plans Attachment 3: Specifications Attachment 4: Division 01 General Requirements mailto:Roger.Ammons@usda.gov mailto:wayne.shekailo@usda.gov mailto:kathi.wilhelm@usda.gov mailto:bonnie.disalvo@usda.gov mailto:chip.johnson@jmcfirm.com
File details come from the government source that posted it. Updated .