Attachment 1 - SOW AMC EVCS Draft 3AUG2022.pdf

PDF 257 KB Posted

Attached to
RFQ - Electric Vehicle Charging Stations (EVCS)(EVSE) - AMC Locations
Solicitation number
W912DY22Q0168
Issued by

About this file

This statement of work outlines requirements for a solicitation seeking electric vehicle charging stations. The U.S. Army Corps of Engineers is procuring electric vehicle charging facilities to support approximately 100 zero emission vehicles for various Army Materiel Command installations. Contractors must provide project management, labor, equipment, and materials to procure and deliver charging stations within 90 days of award. Offerors should provide unit pricing and estimated totals for equipment, delivery, and installation costs for over 20 Army sites. Safety and quality standards outlined in the document must be followed. The statement of work includes performance requirements for the charging stations, deliverables, periods of performance, and points of contact for any questions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY ENGINEERING AND SUPPORT CENTER, HUNTSVILLE

FACILITIES REPAIR & RENEWAL PROGRAM

SOLICITATION NO. W912DY22Q0168

Procure and Deliver Electric Vehicle Charging Facilities for U.S. Army Materiel Command (AMC) Installations

3 August 2022

STATEMENT OF WORK

TABLE OF CONTENTS

1.0. General

1.1. Scope of Work

1.2. Procedure for Award

1.3. Notice to Proceed (NTP)

1.4. Duration of Project

1.5. Site Inspection/Verification

1.6. Applicable Criteria

1.7. Specifications

1.8. Cost Proposal

2.0. Description

2.1. Project Description

2.2. Project Requirements

3.0. General Conditions

3.1. Existing Conditions

3.2. Site Rules and Responsibilities

3.3. Other Considerations

4.0. Work to be Performed

4.1. Scope Requirements

4.2. Deliverables

4.3. Period of Performance

4.4. Contract Contents

4.5. Invoicing and Payment

4.6. Additional Requirements

4.7. Safety Compliance

5.0. Antiterrorism/Operational Security (AT/OPSEC)

5.1. AT Level I Training

5.2. Access and General Protection/Security Policy and Procedures

5.3. iWatch and/or Corps iWatch Training

5.4. Pre-Screen Candidates using E-Verify Program

6.0. Additional Information

7.0. Points of Contact (POCs)

8.0. Addendums, Modifications, etc.

9.0. APPENDICES

STATEMENT OF WORK

US ARMY ENGINEERING AND SUPPORT CENTER, HUNTSVILLE

FACILITIES REPAIR & RENEWAL PROGRAM

CONTRACT NO. W912DY-22-Q-0168

Procure and Deliver Electric Vehicle Charging Facilities for U.S. Army Materiel Command (AMC) Installations

3 August 2022

1.0. GENERAL

1.1. Scope of Work. The objective for this Statement of Work (SOW) is to provide all management, labor, equipment and material necessary for the procurement and delivery of electric vehicle charging facilities (EVCF) at a selected number of U.S. Army Materiel Command (AMC) Installations, to provide on-demand charging services for zero emission vehicles (ZEV’s) being purchased separately by the Government for use as non-tactical light-duty vehicles.

Background: In December 2021, the President issued Executive Order (EO) 14057 on Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability. The EO requires the Department of Defense (DoD) to transition its non-tactical vehicles to a 100% ZEV fleet, including 100% of light-duty acquisitions by 2027 and 100% of medium- and heavy-duty acquisitions by 2035. Toward this goal, some ZEV’s have been purchased for delivery in FY 22 and an adequate number of EVCF must also be purchased to facilitate their continued use.

The Contractor’s Work Plan shall comply with the specifications and requirements contained herein. The project requirements and technical criteria cited within this SOW establishes minimum standards for procurement and delivery quality.

CLIN 1 – Procure EVCF.

CLIN 2 – Deliver and place EVCF in service.

CLIN 3 – Provide onsite warranty support for the installed EVCF for one (1) year after delivery.

1.2. Procedure for Award. The award for services under this SOW will be limited to the priced services identified in the Contract Line Item Numbers (CLINs) in this project and its modifications. In the event of a conflict between this paragraph and any other term or provision in this SOW, this paragraph 1.0 will prevail.

1.3. Notice to Proceed (NTP). Reference is made to APPENDIX 1, “Milestone Schedule” of this SOW. Per acceptance and approval of the bonds and insurance, an NTP will be issued. This NTP will be for the entire project.

1.4. Duration of Project. Delivery Date: Delivery shall occur within 90 Days after Receipt of Order or

Exercise of Option CLIN.

1.5. Site Inspection/Verification. All quantities, locations, and measurements provided by the government are estimations only.

1.6. Applicable Criteria. Applicable standards and criteria references are listed within this SOW. Criteria shall be taken from the most current references as of the date of award. Referenced codes and standards are minimum acceptable criteria. Administrative, contractual, and procedural features of the contract shall be as stated in the scope of work of this task order.

1.7. Specifications. Not Used.

1.8. Cost Proposal. Not Used.

2.0. DESCRIPTION

2.1. Project Description. The intent of this project is to provide all management, labor, equipment, and material necessary for the acquisition, delivery, and setup of electric vehicle charging facilities (EVCF) at a selected number of U.S. Army Materiel Command (AMC) Installations, to provide on-demand charging services for ZEV’s being purchased by the Government for use as non-tactical light-duty vehicles.

2.2. Project Requirements. Additional project requirements are detailed in Section 4.0, “Work to be Performed”. Reference paragraph 4.1 for detailed description of project requirements.

3.0. GENERAL CONDITIONS

3.1 Existing Conditions. Not applicable.

3.2 Site Rules and Responsibilities.

a. Government Holidays and Working Hours. Reference Division 01 Specification for a list of

Government holidays. The standard normal working hours are 0730 and 1600 (7:30 AM – 4:00 PM), Monday through Friday (unless otherwise specified), excluding legal holidays. Prior written coordination and approval is required from the Project Point of Contact (POC) (Primary or Alternate) and the Facility Manager for any work on military training and weekends or federal holidays.

b. General Delivery Information. The Contractor shall coordinate all proposed delivery activities with the Site POC prior to beginning delivery activities to minimize interruption to normal operations.

c. Coordination. The Contractor shall provide prior notice to the Contracting Officer’s Representative

(COR) and Site POC of management of EVCF’s and coordinate with the COR and POC as necessary to minimize impacts to the tenant(s). Further details will be provided prior to work commencing during the Kick-Off Meeting.

1. The Contractor shall coordinate with the Quality Assurance Representative (QAR) to schedule and perform work.

2. Work should be conducted in such a manner to minimize interference with day-to-day activities of the Government facility.

3. The Contractors should only occupy areas in which active delivery and installation or associated work in the performance of the contract is required to be done.

4. No impact to Government facility access/facility parking may occur without prior coordination with the QAR.

d. CONDUCT OF EMPLOYEES. The contractor is responsible for the performance and conduct of its employees. No use of alcohol, drugs or any other incapacitating agent will be tolerated.

1. Contractor employees shall abide by the DOD Smoking Policy.

2. Military Police and other law enforcement personnel on post may deny entry or remove from post any contractor employees for misconduct which endangers the health or safety of people or property or for reasons of security. In addition, the Post Commander may bar an individual from entering the post under the authority of 18 U.S.C. 1382.

3. Removal from post of a contractor employee in accordance with above shall not relieve the Contractor from the requirements of the contract.

4. All vehicles are subject to random search by Military Police when entering the installation.

3.3 Other Considerations. None.

4.0. WORK TO BE PERFORMED.

4.1. Scope Requirements

Procure and install Level 2 electric vehicle charging facilities (EVCF), as described below.

The EVCF shall meet or exceed the following performance requirements:

* Stand-alone, off-grid, photo-voltaic solar operation.

* Simultaneous Level 2 charging rate capability with SAE J1772 J-Plug.

* ChargePoint Dual Port Charger, pre-installed by the manufacturer

* Minimum 5.2 m (17 ft) cable length for each charging port.

* No engineering, construction, installation, or utility connection requirements.

* Minimal impact or changes to parking layouts.

* Battery storage with minimum capacity of 40 kWh with verifiable daily range delivered up to 240 e-miles.

* Temperature control for use in ambient temperature ranges of 0-120oF.

* Comply with Buy American Act

* Trickle charge ready to supplement low sun hours.

* Generating/storing clean energy.

* Charging multiple vehicles simultaneously.

* Application Programming Interface (API) access to EVCF usage data with remote monitoring services.

* Solar tracking system with verifiable capability to increase charging capability.

* Certified wind load minimum 120 mph without tethering to ground.

* Flood proof to minimum 9 feet

* Optional: Emergency power panel, allowing 120 VAC outlet use during loss of utility power.

The Contractor shall deliver and place in service the specified EVCF. The delivery shall include placement and positioning the EVCF at the designated location, in accordance with the manufacturer’s instructions.

The Contractor shall provide onsite warranty services for the EVCF for a period of one (1) year after delivery.

4.2. Deliverables: The Contractor shall deliver the EVCF deliverables within the required periods identified in the contract.

4.2.1. Performance and Payment Bonds: Performance and Payment Bonds penal amount must equal

100 percent of the Original Contract price and if the Contract price increases and additional amount equal to 100 percent of the increase, in accordance with FAR 28.102-2.

4.2.2. Not Used.

4.3. Period of Performance. Delivery shall occur within 90 Days after Receipt of Order or Exercise of Option

CLIN.

4.4. Contract Contents. This document contains or references the provisions that shall apply to the performance of the work under this contract.

4.5. Invoicing and Payment. The Contractor shall prepare payment requests for invoicing in accordance with the contract and as follows:

a. The Contractor shall prepare payment requests for invoicing in accordance with the applicable provisions of the Division 01 specifications. Prior to submitting payment requests, the Contractor shall obtain the signature acceptance of the QAR, for work in place for which the payment request is being submitted. The requested payment request shall correspond to the updated schedule submittal as required by the Division 01 specifications. Payment requests for invoicing shall include the signature acceptance of the QAR, signed Prompt Payment Certification, ENG Form 93 and an updated schedule.

b. Verification of percentages of work completed during the construction phase will be coordinated with and signed by the Government QAR prior to payment request to RMS or email. A notification stating the payment request has been exported to RMS shall be made via email to the Government’s Project Manager (PM). The email notification to the PM and the CEHNC-FD- Invoice Box (FDInvoice@usace.army.mil) shall contain the scanned copy of the signed verification by QAR, ENG Form 93, Prompt Payment Certification, and an updated Schedule. Once the project requirements are completed and a final payment request for invoicing is submitted, the payment request shall also include the signed Release of Claims (form to be provided by the PM near project completion).

4.6. Additional Requirements.

Quality and Safety. Quality workmanship and safety are two of the key elements expected of the Contractor to ensure the product delivered meets the requirements of both EM 385-1-1 and the SOW.

Kick-Off Meeting. Contracting Officer or COR will schedule a Kick-Off Meeting after contract award and prior to commencement of work. The Contracting Officer will notify the contractor of the time, date, and place set for the meeting, which will be held at a location to be designated by the Contracting Officer. For bidding purposes, the Contractor should assume the Kick-Off meeting will be held onsite at Huntsville, AL.

Contracting Officer, COR and/or their QAR may inspect the work at any time during the contract period, and reserves the right to stop or terminate the contract if all work does not comply with the specifications provided by the manufacture’s recommendation of this SOW. The presence or absence of the Contracting Officer or QAR shall not relieve the Contractor from strict compliance with these plans and specifications.

4.7. Safety Compliance.

The Contractor shall execute all work IAW the latest version of Safety Manual EM 385-1-1 (found at https://www.publications.usace.army.mil/Portals/76/Publications/ EngineerManuals/EM_385-1-1.pdf).

This manual includes all safety requirements for contractors performing work on any USACE project. It also contains information and templates for preparing documents required prior to work commencing, such as the APP and AHA. USACE safety policy, regulations, documents and reporting forms are available at: https://www.hnc.usace.army.mil/Missions/Command-and-Staff-Offices/Safety-Office/.

5.0. ANTITERRORISM/OPERATIONAL SECURITY (AT/OPSEC)

5.1. AT Level I Training. Not applicable.

mailto:FDInvoice@usace.army.mil https://www.publications.usace.army.mil/Portals/76/Publications/%20EngineerManuals/EM_385-1-1.pdf

5.2. Access and General Protection/Security Policy and Procedures. All contractor and associated subcontractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by Installation Provost Marshall Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personnel identity verification requirements as directed by Department of Defense (DoD), and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

5.3. iWatch and/or Corps iWatch Training. The Contractor and all associated subcontractors shall brief all employees on the local iWATCH, Corps iWatch or See Something, Say Something Program (training standards provided by the requiring activity Authority to Operate (ATO)). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR and Contracting Officer. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR no later than (NLT) five (5) calendar days after contract award.

5.4. Pre-Screen Candidates using E-Verify Program. The Contractor must pre-screen candidates using the E-Verify Program (http://www.dhs.gov/E-Verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E-Verify system. An initial list of verified/eligible candidates must be provided to the COR no later than three (3) business days after the initial contract award. All assigned contractor employees shall have the required security clearance to perform work at the facility. To have unescorted access to the building/project site but not to areas storing classified information, a National Agencies Check (NAC) must be started and closed with favorable results.

To have unescorted access to the areas containing classified information, a Secret Clearance is required.

6.0. ADDITIONAL INFORMATION

Not applicable

7.0. POINTS OF CONTACT (POCs)

Jason Bray, Project Manager/COR U.S. Army Engineering & Support Center, Huntsville 475 Quality Circle Huntsville, AL 35816-1822 Ph: (256) 426-3397 (Cell)

(256) 895-1514 (Desk); Email: Jason.A.Bray@usace.army.mil

Gail M. Gandy, Contracting Officer U.S. Army Engineering & Support Center, Huntsville 475 Quality Circle Huntsville, AL 35816-1822 Ph: (256) 895-1156 (Desk); Email: Gail.M.Gandy@usace.army.mil

Jerrell C. Henley, Project Engineer/Architect U.S. Army Engineering & Support Center, Huntsville 475 Quality Circle Huntsville, AL 35816-1822 Ph: (256) 895-3120 (Desk); Email: Jerrell.C.Henley@usace.army.mil

8.0. ADDENDUMS, MODIFICATIONS, ETC

mailto:XXXX@usace.army.mil mailto:XXXXX@usace.army.mil mailto:XXXXX@usace.army.mil

Not applicable.

9.0. APPENDICES

Appendix A – Price Proposal Format

Base/Option CLIN Site/Installation Number of Units (ESTIMATED) Equipment Price Per Unit

Total Equipment Price Delivery Price Per Unit

Total Delivery Price

Total Purchase

BASE 0001 Anniston AD, AL 13 -$ -$ -$ OPTION 0002 Tooele AD, UT 13 -$ -$ -$ OPTION 0003 Red River AD, TX 13 -$ -$ -$ OPTION 0004 Bluegrass AD, KY 12 -$ -$ -$ OPTION 0005 McAlester AAP, OK 12 -$ -$ -$ OPTION 0006 Iowa AAP, IA 2 -$ -$ -$ OPTION 0007 Pine Bluff Arsenal, AR 7 -$ -$ -$ OPTION 0008 Sierra AD, CA 7 -$ -$ -$ OPTION 0009 Tobyhanna AD, PA 7 -$ -$ -$ OPTION 0010 Letterkenny AD, PA 6 -$ -$ -$ OPTION 0011 Pueblo, CO 1 -$ -$ -$

OPTION 0012 MOTCO, CA 4 -$ -$ -$

OPTION 0013 Hawthorne AD, NV 3 -$ -$ -$ OPTION 0014 Watervliet Arsenal, NY 3 -$ -$ -$ OPTION 0015 Corpus Christi AD, TX 2 -$ -$ -$ OPTION 0016 Radford AD 2 -$ -$ -$ OPTION 0017 Crane, IN 1 -$ -$ -$ OPTION 0018 Holston AAP, TN 1 -$ -$ -$ OPTION 0019 Lake City AAP, MO 1 -$ -$ -$ OPTION 0020 Scranton AAP, PA 1 -$ -$ -$

OPTION 0021 MOTSU 1 -$ -$ -$

APPENDIX A - PRICE PROPOSAL FORMAT

Instructions: The number of units included on this spreadsheet is an estimate. The Government anticipates the purchase of the estimated number of units;

however, the number required per installation is subject to increase or decrease based on the needs of the individual installation. Additionally, the site list may change after award of the contract. The Government may add additional sites if any are identified during the period of performance of the resultant contract from this solicitation. The evaluation of the Offeror's price will be based on this initial estimate.

Total Purchase Price

File details come from the government source that posted it. Updated .