Attachment 1_SOW 20 Dec 2022.pdf
PDF 278 KB Posted
- Attached to
- B922 CARPET REMOVAL AND INSTALLATION Federal contract opportunity
- Solicitation number
- FA480323QB014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA480323QB014 B922 Carpet QA Rev 1.pdf | ||
| Attachment 2_carpet Floor Plan.pdf | ||
| B922 Carpet Repair_FA480323QB014 RFQ_CO signed.pdf | ||
| Attachment 3_WD 15-4439 Rev 18 dtd 20220627.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
CARPET REMOVAL AND INSTALLATION
FOR
B922 Carolina Skies Club
SHAW AFB SC
20 December 2022
TABLE OF CONTENTS
PARAGRAPH TITLE PAGE(S)
1.0
DESCRIPTION OF SERVICES
3‐4
2.0
GOVERNMENT FURNISHED PROPERTY
3.0
GENERAL INFORMATION
4.0
SECURITY REQUIREMENTS
4‐6
1.0 Description of Service/Scope of Work. The contractor shall furnish all labor, tools, materials, permits, and equipment necessary to perform the work noted below in B922.
Work includes removing existing carpet and existing transitions, and installing new modular carpet squares, and transitions. (see attached drawing). Contractor is responsible for ensuring the actual/correct amount of carpeting required. Color choice is as follows:
Carpet Shaw Contract – SIMPLY BY NATURE Style: Structure tile Style number: 5T297 Color name: Shiny Pebble Color number: 94761
Walk Off Mat Shaw Contract – All Access Style: Jive Style Number: 5T412 Color name: Traverse Color number: 12557
CARPET MUST BE QUICK SHIP AND FINAL QUANTITIES MUST BE VERIFIED TO BE IN THE WAREHOUSE AT THE TIME
OF BIDDING.
The Contractor shall relocate furniture as required to complete the install. The Contractor is responsible for field measuring of carpet to insure exact amount of carpet required to complete this installation. Installation includes delivery, uncarting, set up and debris removal. Work must be done within normal business hours 0730‐
1600 M‐F unless coordinated with the user. The measurements given are an estimation. Offers shall include, but not be limited to: carpet and transitions.
The government requires the contractor to visit the site location and take their own measurements
(dimensions, quantities and square footages) prior to contract award. All dimensions, quantities and square footages included are approximations. The government is not responsible for incorrect measurements of the amount of carpet required. The extra carpet tile shall be given to the Facility Manager after the project is complete. The contractor shall haul away and dispose of removed carpet and transitions.
a. Contractor requirements for carpet replacement: Carpet to be purchased and installed shall be as noted above, lifetime commercial limited warranty, from Mandatory Sources. Time is of the essence.
b. Contractor is responsible for purchasing and installing transitions to be replaced in all applicable doorways where carpet tile is installed. The transitions shall match transitions or approved equal.
c. The existing floor surface shall be suitable for installation after the old carpet is removed. If the floor needs filling of holes or cracks, the contractor shall be responsible for making the floor carpet ready. Contractor shall furnish all cement, tape, thresholds and cap down moldings. Carpet to be installed in accordance with the manufacturer’s instructions. The contractor shall furnish all adhesive as recommended by carpet manufacture.
Contractor shall be responsible for preparation of floor surfaces as necessary to receive carpet. All surfaces to be free of voids and protrusions. Installed carpet shall be smooth, uniform, secure, and installed in a professional manner. Patterned goods shall be accurately matched. Fit cutouts such as doors, jambs, columns, steps, landings, and ducts neatly and securely.
d. Extra attention is to be observed while butting seams together. Contractor shall follow manufactures instructions on in matching the seams to prevent fraying and raveling and for unity in pattern. Contractor is to provide at least a five‐year warranty against fraying, raveling, separating, buckling and on his workmanship.
e. Phasing of work may be required to support the mission of the facility. Facility Manager will be the Point of Contact. Contract performance for each phase (if required) will start after the issuance of a NTP for that particular phase.
f. The Contractor is responsible for protection of existing facilities equipment from damage during removal of existing carpet and installation of new carpet. Contractor shall take into account the special treatment of hazardous waste, as well as the environmental implications related to building demolition management (i.e.
fluorescent lighting tubes, t‐stats, etc.). Every effort shall be made to recycle eligible materials, and those not suitable, shall be disposed of off base in accordance with all (SCDHEC) South Carolina Department of Health and
Environmental Control regulations.
g. Ensure that any demolition, utility cut and capping, and debris removal service performed at Shaw AFB, South Carolina in completed in such a manner that will restore a neat and professional appearance of base areas.
h. The facility/area shall be cleaned in its entirety, including exterior areas, before being returned the government.
i. During Performance, the contractor shall take care not to damage existing structures, etc. that will not be replaced as part of this contract. Contractor shall be responsible for the temporary support of all devices as required to perform work. Any demolition work that needs to be accomplished to complete the contract is the responsibility of the contractor. All material shall be installed per manufacturers’ recommendations. All items listed in the SOW are to be supplied and installed by the contractor unless otherwise noted.
j. The Contractor shall take all precautions to insure that his operations are conducted in a manner as to minimally interfere with the normal operations of the base and the safety and convenience of the base personnel.
The contractor shall coordinate utility outages with the Civil Engineering Squadron (CE) service call and the
Government representative.
1.2 Services Not Covered
The contractor shall notify equipment owner of any repairs required that are not listed in the scope of work and if any of the additional repairs would need to be completed before continuing with the maintenance outlined in the scope of work.
1.3 Quality Assurance
The government will periodically evaluate the contractor’s performance by appointing a Contracting Officer’s
Technical Representative(s) (COTR) to monitor performance to ensure services are received. The government representative will evaluate the contractor’s performance through intermittent on‐ site inspections of the contractor's quality control program and receipt of complaints from base personnel.
2.0. Government Furnished Property and Services: The Government shall provide, water, sewage, and electricity from existing sources.
3.0. General Information
3.1. All required work shall be coordinated through the Facility Manager, Sarah 803‐895‐1322, or Chuck Whittington @ 803‐895‐9584 to schedule time and date of installation.
3.2. The Contractor shall take no longer than 15 business days from beginning of installation to completion of installation.
3.3. Upon completion of the inspection or repair work within a facility, the contractor shall have the COR sign a copy of each Service Order/Work Request and a signed copy shall be given to the COR.
3.4. Safety. All work shall be in accordance with Federal, State and Base Safety regulations.
3.5. Hours of Operations. All non‐emergency work shall be accomplished during the normal duty hours of 0800 through 1630, Monday through Friday, excluding US Government holidays.
3.6. Shaw AFB recognizes the following holidays:
New Year’s Day 1 January
Martin Luther King’s Birthday Third Monday in January
President’s Day Third Monday in February
Memorial Day Last Monday in May
Independence Day 4 July
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day 11 November
Thanksgiving Day Fourth Thursday in November
Christmas Day 25 December
NOTE: Any of the above holidays falling on a Saturday will be observed on the proceeding Friday. Holidays falling on a Sunday will be observed on the following Monday.
4.0. Security Requirements for Unclassified Contracts
4.1. Listing of Employees. The contractor shall maintain a current listing of employees. The list shall include the employee's name, social security number and type of investigation if contract work involves unescorted entry to
Air Force restricted areas or other sensitive areas designated by the installation commander. The list shall be provided to the Program Manager and sponsoring agencies Security Manager. An updated listing shall be provided when an employee's status or information changes.
4.2. Pass and Identification Items. The contractor shall ensure the pass and identification items required for contract performance are obtained for employees.
4.2.1. Computer Network Access. N/A
4.3. Retrieving Identification Media. N/A
4.4. Traffic Laws. The contractor and its employees shall comply with base traffic regulations.
4.5. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor‐owned vehicle or privately‐ owned vehicle while on SHAW AFB.
4.6. For Official Use Only (FOUO). The contractor shall comply with DoD 5400‐7‐R, Chapter 4, DoD Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
4.7. Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DOD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on‐base assignment.
4.8. Physical Security. The contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.
4.9. Controlled/Restricted Areas. N/A
4.10. Key Control. N/A
| 2022-12-20T17:03:37-0500 | |
| FOX.JILL.FLETCHER.1387621314 |
File details come from the government source that posted it. Updated .