Attachment 1 SOS-Section B.xls
XLS spreadsheet 55 KB Posted
- Attached to
- USCG MORRO BAY (WTGB 106) FY20 Dockside Repair
- Solicitation number
- 70Z085-20-Q-P4579000
About this file
This solicitation requests quotes for dockside repair services for the USCGC MORRO BAY, a 140-foot Bay Class Icebreaking Tug. The Coast Guard seeks a contractor to provide all necessary labor, materials, and equipment to perform repairs at the cutter's home port of Cleveland, Ohio between August 18 and September 23, 2020. Services include cleaning and inspecting tanks, ducts, and piping; overhauling valves and fittings; preserving spaces; and inspecting anchors and davits. Quotes are due by April 9, 2020 and the contract will be a firm fixed-price awarded under FAR Part 12 for commercial items. The requirement is set aside for small businesses with a NAICS code of 336611 and size standard of 1,250 employees.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC MORRO BAY (WTGB-140) DOCKSIDE AVAILABILITY FY2020 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Tanks (Hydraulic Oil Stowage And Service), Clean And Inspect | JOB | 1 | $0.00 | |
| D-002 | Tanks (Potable Water), Clean and Inspect | JOB | 1 | $0.00 | |
| D-003 | Tanks (Lube Oil), Clean and Inspect | JOB | 1 | $0.00 | |
| D-004 | Tanks (Ballast), Clean and Inspect | JOB | 1 | $0.00 | |
| D-005 | Tanks (Dirty Oil and Waste), Clean and Inspect | JOB | 1 | $0.00 | |
| D-006 | Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-007 | Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-008 | Boiler Exhaust Stack Uptakes, Commercial Clean | JOB | 1 | $0.00 | |
| D-009 | Bubbler Diesel Engine Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-010 | Vent Ducts (Engine And Motor Room All), Commercial Cleaning | JOB | 1 | $0.00 | |
| D-011 | Vent Ducts (Galley and Pantry Room All), Commercial Cleaning | JOB | 1 | $0.00 | |
| D-012 | Vent Ducts (Laundry Exhaust), Commercial Cleaning | JOB | 1 | $0.00 | |
| D-013 | Vent Ducts (All Other), Commercial Cleaning | JOB | 1 | $0.00 | |
| D-014 | Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift | JOB | 1 | $0.00 | |
| D-015 | Anchor Windlass, Inspect and Service | JOB | 1 | $0.00 | |
| D-016 | Vertical Capstan, Inspect and Service | JOB | 1 | $0.00 | |
| D-017 | Hull Fittings (Mooring and Towing), Inspect and Test - Tender | JOB | 1 | $0.00 | |
| D-018 | Grey Water Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| D-019 | Sewage Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| D-020 | Grey Water Piping, Clean And Flush | JOB | 1 | $0.00 | |
| D-021 | Sewage Piping, Clean And Flush | JOB | 1 | $0.00 | |
| D-022 | Deck Covering (Interior Wet/Dry), Renew | JOB | 1 | $0.00 | |
| D-023 | Anchor Chain(s) and Ground Tackle, Inspect and Repair | JOB | 1 | $0.00 | |
| D-024 | Single Point Davit, Inspect & Service | JOB | 1 | $0.00 | |
| D-025 | Crew’s Berthing, Partial Preserve | JOB | 1 | $0.00 | |
| D-026 | Auxiliary Machine Room #2, Partial Preserve | JOB | 1 | $0.00 | |
| D-027 | Tank (Water Mist), Clean And Inspect | JOB | 1 | $0.00 | |
| D-028 | Potable Water System Valve, Renew | JOB | 1 | $0.00 | |
| D-029 | Fuel Manifold, Overhaul | JOB | 1 | $0.00 | |
| D-030 | Firemain Valves, Overhaul or Renew | JOB | 1 | $0.00 | |
| D-031 | Vent Ducts, Renew | JOB | 1 | $0.00 | |
| D-032 | Fan Room, Preserve | JOB | 1 | $0.00 | |
| D-033 | SS Air Piping/Valve, Replace | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 410 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(1/29/2020) Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |