Attachment 1 SOS BRISTOL BAY.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Dry Dock: USCGC BRISTOL BAY Federal contract opportunity
Solicitation number
70Z08524QIBCT0017
Issued by
Department of Homeland Security US Coast Guard

About this file

This document is an Excel pricing schedule attachment for a federal contract opportunity related to the dry dock availability of the USCGC BRISTOL BAY (WTGB-140) and a 120-foot ATON Barge. The solicitation, 70Z08524QIBCT0017, is a Request for Quotation (RFQ) for commercial services under a firm fixed price contract, with a period of performance from July 9, 2024 through October 1, 2024. The work includes various dry dock repairs and preservation services for the vessels, such as hull plating inspection and preservation, propulsion system maintenance, electrical system testing, and other mechanical and structural work. The solicitation is a small business set-aside with a NAICS code of 336611 - Ship Repair. Quotations are due by June 11, 2024, and the anticipated award date is on or about June 18, 2024. The place of performance is the contractor's facilities, and the cutter's homeport is Detroit, MI.

View the file

Other files for this federal contract opportunity

Other files attached to Dry Dock: USCGC BRISTOL BAY, newest first.
File Type Posted
Attachment 2 Revised BRISTOL BAY (WTGB 140) DD FQ3 PAS 24R1.docx DOCX document
Amendment 0001 USCGC BRISTOL BAY FY24DD.pdf PDF
Attachment 2 Spec BRISTOL BAY WTGB 140.docx DOCX document
Attachment 3 - Past Performance Information Form.docx DOCX document
Attachment 4 - Request for Clarification Form.docx DOCX document
Attachment 6a JOTFOC Work Item 11.pdf PDF
Attachment 6b JOTFOC Work Item 62.pdf PDF
Combined Sysnopsis BRISTOL BAY FY24 DD.pdf PDF
Attachment 5 - USCG Ombudsman Notice.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC BRISTOL BAY (WTGB-140) DRYDOCK AVAILABILITY FY2024
REV 0 17 April 2024
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Fire Prevention RequirementsNSPNSPNSP
D-002Hull Plating, U/W Body, InspectJOB1
D-003Hull Plating, U/W Body, Ultrasonic TestingJOB1
D-004U/W Body, Preserve, 100 percent - TenderJOB1
D-005Bubbler Channels, InspectJOB1
D-006Appendages, U/W, Leak TestJOB1
D-007Propulsion Shaft Rope Guards, InspectJOB1
O-008Appendages, U/W, Internal, PreserveJOB1
D-009Tanks, MP Fuel Stowage and Overflow, Clean and InspectJOB1
D-010Tanks, MP Fuel Service, Clean and InspectJOB1
D-011Propulsion Shaft Seals, Mechanical Overhaul and Inflatable RenewJOB1
D-012Propulsion Shafting; Remove, Inspect, and ReinstallJOB1
D-013Propulsion Shaft Bearings, External CleareanceJOB1
D-014Stern Tube Interior Surfaces, Preserve, 100 PercentJOB1
D-015Propeller , Remove, Inspect, and ReinstallJOB1
D-016Circuit Breakers (60 Hz), Inspect and TestJOB1
D-017Fathometer Transducer, RenewJOB1
D-018Sea Valves and Waster Pieces, Overhaul Or RenewJOB1
D-019Rudder Assembly, Remove, Inspect And ReinstallJOB1
D-020Rudders, Preserve, 100 PercentJOB1
D-021Chain Locker, Preserve, 100 PercentJOB1
D-022Cathodic Protection, Zinc Anodes, Renew,JOB1
D-023DrydockJOB1
D-024Temporary Services, Provide - Tender and BargeJOB1
D-025Sea Trial Performance, Support, ProvideJOB1
D-026Main Mast, Preserve, 100%JOB1
D-027Hull Plating, U/W Body, Inspect - BargeJOB1
D-028Hull Plating, U/B, Ultrasonic Testing - BargeJOB1
D-029Hull Plating, Freeboard, Ultrasonic Testing - BargeJOB1
O-030Hull and Structural Plating, 5/16in Steel Plate, Renew - BargeEA1
D-031Fenders, Bow, Inspect and Repair - BargeJOB1
D-032Appendages, U/W, Leak Test - BargeJOB1
O-033Appendages, U/W, Internal, Preserve - BargeJOB1
D-034Voids (Accessible, Weather Deck Exposed), Inspect - BargeJOB1
D-035Keel Coolers, Clean, Inspect and Hydro - BargeJOB1
D-036Circuit Breakers (60 Hz), Inspect and TestJOB1
D-037Fathometer Transducer, General Maintenance - BargeJOB1
O-038Tanks, Sewage Holding, Preserve, 100 percent - BargeJOB1
O-039U/W Body, Preserve, 100 percent - BargeJOB1
O-040U/W Body, Preserve, Partial, Condition A - BargeJOB1
O-041U/W Body, Preserve, Partial, Condition B - BargeJOB1
D-042Hull Plating Freeboard, Preserve, 100 Percent - BargeJOB1
D-043Superstructure, Preserve, 100 Percent - BargeJOB1
D-044Cathodic Protection, Zinc Anodes, Renew - BargeJOB1
D-045Sea Strainers, Duplex, All Sizes, Overhaul - BargeJOB1
D-046Thruster Unit, Overhaul - BargeJOB1
D-047Hull Fittings, Weight Handling Rigging Hardware, Inspect and Test - BargeJOB1
D-048Grey Water Holding Tanks, Clean and Inspect - BargeJOB1
D-049Sewage Holding Tanks, Clean and Inspect - BargeJOB1
O-050Tanks (Aft Grey Water), Preserve “100%”- BargeJOB1
O-051Tanks (Aft Grey Water), Preserve “Partial”- BargeJOB1
D-052Decks – Exterior (Buoy or Construction Deck), Preserve 100%JOB1
D-053Drydock - BargeJOB1
D-054Bilge and Ballast Valves, Overhaul or RenewJOB1
D-055Bilge, PreserveJOB1
D-056SSDG Duplex Fuel Filter-Water Separator, InstallJOB1
D-057Boat Deck Lighting, InstallJOB1
D-058Auxiliary Sea Water System Valves, Overhaul Or RenewJOB1
D-059Buoy and Cargo Handling Crane, Shrink WrapJOB1
D-060Firemain Valves, Overhaul or RenewJOB1
D-061Boat Cleats, InstallJOB1
D-062Barge Heat Pump System, RenewJOB1
D-063Fenders Bow, Inspect and RepairJOB1
D-064Anchor Chain and Ground Tackle, PreserveJOB1
D-065Anchor Chain and Ground Tackle, Inspect and Repair - BargeJOB1
D-066Hull and Structure Plating 5/16in Steel Plate, Renew - BargeEA1
D-067Bilge and Ballast System Piping Barge, RenewJOB1
D-068Voids, Non-Accessible, Leak TestJOB1
O-00AComposite Labor RateHour560$0.00
D-00BGFP ReportNSPEANSP
D-079Travel and Perdiem$500.00JOB$0.00
O-00ZLaydaysDay5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

(10/18/2023)_x000D_ Draft-00 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .