This Statement of Objectives (SOO) details a contract for the 96 Test Wing at Eglin AFB and Duke Field to purchase and lease bird, drone, and maritime surveillance systems, services, and support. The solicitation (FA282325Q0079) seeks comprehensive radar and camera systems to enhance airfield safety and security, with installations planned at multiple locations across Eglin AFB and Duke Field in Florida.

Key objectives include deploying Bird Detection Radar (BDR), Drone Detection Radar (DDR), Maritime Surveillance Radar (MSR), and Electro-Optical/Infrared (EO/IR) camera systems capable of real-time detection and tracking of birds, unmanned aerial systems (UAS), and maritime targets. The systems must provide detailed 2D and 3D tracking data, visual alarms, target passage rate reports, and integration with existing infrastructure. The contract will run for a one-year base period with four potential 12-month option years, with avian radar and airfield cameras to be purchased outright and other surveillance equipment to be leased. Notably, Duke Field is currently unfunded and will be an exercisable option in the contract scope.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVE (SOO)

for

EGLIN AFB & DUKE FIELD

96 Test Wing

Purchase and Lease of Bird, Drone, and Maritime Surveillance Systems, Services & Support

FA282325Q0079

20 August 2025

Page - 2 - of 14

Contents

1.0 GENERAL

1.1. Description

1.2. Background

1.3. Inherently Governmental Function

1.4. Period of Performance

1.5. Place of Performance

1.6. Required Equipment and Included Services

2.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES

2.1. Government Services

3.0 GENERAL INFORMATION

3.1. Recognized Holidays

3.2. Contractor Personnel

3.3. Other

3.4. Contractor Access to Air Force Installations

4.0 ATTACHMENTS:

4.1. The physical location of the BDR/DDR equipment will be located between runways 02-

20 and 12-30 at a pre-existing site at Eglin AFB Florida airfield.

4.2. The physical location of the BDR/DDR equipment will be located West of Taxiway A at a pre-existing site at Duke Field Florida airfield.

4.3. The physical location of the 2x MSR equipment and 1x EO/IR camera will be located

East of building 462 on the shoreline at a pre-existing site at Eglin AFB Florida.

4.4. The physical location of 1x MSR equipment and 1x EO/IR camera will be located by the Eglin Bayview Events Center at a pre-existing site at Eglin AFB Florida.

4.5. The physical location of airfield EO/IR cameras will be 1x located on building 104 and 1x located on building 1412 on Eglin AFB Florida airfield.

Page - 3 - of 14

1.0 GENERAL

1.1. Description. This is a non-personnel contract to provide the 96th Test Wing equipment and included services to facilitate installation and support for a Bird Detection Radar (BDR) system, Drone Detection Radar (DDR) system, Maritime Surveillance Radar (MSR) system, and camera/video system to be installed on Eglin AFB Florida 32542, and installation and support for BDR, DDR, and camera/video system to be installed on Duke Field Florida 32542.

The Government shall not exercise any supervision or control over the installation or removal of equipment to the providers performing the services herein. Providers shall be accountable solely to the Contractor who in turn is responsible to the Government.

* Duke Field is currently NOT FUNDED and will be placed as an exercisable Option into the scope of the contract. *

1.1.1. Scope. The Contractor shall provide all management, personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform installation, maintenance, and required hardware/software upgrades as defined in this Statement of Objectives (SOO). The Contractor shall perform to the standards within this SOO to include the planning, coordination, and surveillance of the activities necessary to ensure disciplined work performance and timely resource application to accomplish all tasking under the contract. The Contractor shall be responsible for maintaining communication with the contracting officer (CO) to immediately notify of any problems that would prevent timely delivery and installation of this contract.

1.2. Background. Eglin AFB and Duke Field currently do not have systems to meet the airfield safety and security requirements, including avian radar systems with drone detection capability and maritime surveillance capability as well as an operational current-technology airfield camera system. Eglin and Duke’s location along the coastal area with high avian activity requires an avian radar for effective bird hazard mitigation to conduct safe and effective commercial and military flight operations. With emerging threats to aircraft by personally operated Unmanned Aerial Systems (UAS), a drone detection capability is critical to the safety and security of flight operations at Eglin AFB and Duke Field. Maritime surveillance of restricted waterways is essential due to the large unsecured access points along the South and East sides of Eglin AFB. A 360-degree camera/video system with storage and playback capability will bolster surveillance of any movements in the airfield environment and allow the detection systems to positively identify targets detected by the system to enable mitigation efforts.

1.3. Inherently Governmental Function. The Contractor shall not perform inherently governmental functions as defined in FAR Subpart 7.5 in relationship to this PWS.

1.4. Period of Performance. Performance shall commence at date specified in resultant contractual document for a one-year base plus four (4) twelve month option periods, in accordance with Option for Extension of Services clause FAR 52.217-9.

1.5. Place of Performance. The Contractor shall perform required onsite installation at Eglin AFB Florida at multiple locations, as referred in Attachments 1,3,4 and 5, including on

Page - 4 - of 14 the airfield between runways 02-20 and 12-30 at a pre-existing site, multiple buildings on the installation for cameras and user interfaces, coastal sites, as well provide upgrades remotely as dictated by software capabilities to or on-site as required by network system capability.

1.5.1 The Contractor shall perform required installation at Duke Field Florida on the airfield West of Taxiway A at a pre-existing site, as referred in Attachment 2, in buildings on the installation for user interfaces, as well as remote support as dictated by software capabilities to provide upgrades on-site or remotely as required by network system capability. Visual depictions of installation locations can be found in Attachments 01 to 05.

1.6. Required Equipment and Included Services. Contractor shall provide support services with regular maintenance along with help desk support provided through phone or email twenty-four hours a day, seven days a week, 365 days a year. Contractor shall maintain systems through preventive maintenance/health inspection and replace or repair defective components via existing warranties/contract agreement for a co-integrated (combined) BDR, DDR, MSR, and Camera System and their corresponding user interface systems located on Eglin AFB and Duke Field at designated sites on and off the airfield.

1.6.1. Equipment Characteristics. Installed equipment shall have the capabilities described below.

1.6.1.1. On Eglin AFB, the Contractor shall provide equipment with the capability for real-time bird, UAS, and maritime detection as well as an airfield and maritime camera/video system to be installed on the airfield and coastal sites.

1.6.1.2. On Duke Field, the Contractor shall provide equipment with the capability for real-time bird and UAS detection as well as an airfield camera/video system to be installed on the airfield.

1.6.1.3. The BDR system must be able to provide avian target counts, total avian radar cross-section, location (bearing, range, and altitude), direction of travel, speed, and size data for the departure/arrival corridors and patterns for Runways 12/30 and 02/20 at Eglin AFB and Runway 18/36 at Duke Field from an Above Ground Level (AGL) height of 0 to 2,500 feet, and provide alerts to specific risks in these critical flight areas during flight operations.

1.6.1.4. The BDR system must provide full volume 3-dimensional data (bearing, range, and altitude) out to 4 nautical miles (NM), to include avian target counts, total avian radar cross-section, direction of travel, speed, and size data, and provide presentation of that data, for 360-degrees during flight operations. The system must update target data across the entire 3D volume continually with a refresh rate of no less than 4 times per second.

1.6.1.5. The BDR system must provide 2-dimensional data (bearing and range) out to 8 nm, to include avian target counts, total avian radar cross-section, direction of travel, speed, and size of large targets, to include presentation of that data, for 360-degrees of coverage with a full volume refresh rate of no less than once per 3 seconds during flight operations.

1.6.1.6. The MSR system on Eglin AFB must provide 2-dimensional data (bearing and range) out to 3 nm, to include maritime target counts, total maritime radar cross-section, direction of travel, speed, and size of large targets, to include presentation of that data, for continuous coverage along the Eastern shore of Eglin AFB.

Page - 5 - of 14

1.6.1.7. Thermal modeling shall be employed into the risk analysis to better target altitudes of concern with thermals utilized by raptors/vultures.

1.6.1.8. The DDR system must provide 360-degree UAS detection equipment with real time coverage at no less than 4NM and a height of 0 to 5,000 feet AGL.

1.6.1.9. The DDR system must be capable of displaying identification and location information broadcasted by UAS.

1.6.1.10. The DDR system must be capable of detecting UAS that are not broadcasting flight information or communicating with a ground station.

1.6.1.11. The BDR/DDR/MSR systems must include a radar-controlled Electro-Optical/Infrared (EOIR) camera/ video for bird, UAS, and maritime target confirmation. The camera must be able to be controlled remotely by the user and be capable of being slewed to the radar to enable it to follow targets via automatic pan, tilt, and zoom (PTZ). The camera must have built-in capability to operate in precipitation and in freezing temperatures (For example, windscreen wiper and heated defogger). The camera/video system must include capability for video/still image storage and playback.

1.6.1.12. The system must be capable of providing visual alarms for condition changes.

1.6.1.13. The system must provide daily, weekly, and monthly target passage rates and directional distributions of bird, drone, and maritime targets by hour with position information. These reports are vital in creating historical data and in determining patterns and peak target passage areas and rates.

1.6.1.14. All major components of the system equipment must be configured to accept external power. During power outages, the system must be able to provide data for 2 hours. Backup Uninterrupted Power Supply (UPS) with additional battery units or backup generator will be added to the system to provide at least 2 hours run time during power outages.

1.6.1.15. The system must be self-contained and will not be connected to any government owned/operated computer systems or networks unless authorized. Data collection and dissemination will be achieved by a Contractor provided computer system or network with high-speed data service or capability with bandwidth sufficient to stream a minimum HD video resolution of 720p or 1080p and other required data for normal operations to include remote updates; web page feeds; and other data visualization requirements. Data shall be monitored and displayed in a secure manner that allows for access through a standard web browser by computers provided by and connected to the BDR/DDR/MSR.

1.6.1.16. The system shall include displays at offices on Eglin AFB and Duke Field with point-to-point wireless receive capability (or other available data connections) from the BDR/DDR/MSR.

The system display software must include the capability to provide a graphical, color shaded presentation of the current bird strike risk level presented as Low (Green), Moderate (Yellow) or Severe (Red) by user selectable zones. The risk zones must be capable of being custom set by the user and the risk threshold at which the risk level changes will also be user selectable. The integrated risk graph must allow the user to see the current risk levels while still keeping the main features of the display in view.

Page - 6 - of 14

1.6.1.17. The display software must allow user to switch between map view and the camera. The system must take inputs from the different sensors and automatically slew the camera and zooms in to a user selected location for target confirmation.

1.6.1.18. All system data collected shall be with the 96 TW upon contract fulfillment or termination in a format consistent with data accessibility principles. The Contractor must provide sufficient data storage of all raw data collected for up to 5 years to allow for historical data analysis.

1.6.1.19. Avian radar and associated airfield camera equipment shall be purchased outright by the 96 TW. All other equipment supporting UAS and maritime surveillance shall be leased for a base year of twelve months and a potential of four option years at 12 months each. The equipment shall be covered for this duration as stated in section 1.6.2 of this performance work statement.

1.6.1.20. Contractor shall have an approved Joint Frequency Equipment Allocation Process, also called the J/F-12 process, before installation of equipment at Eglin AFB or Duke Field. The certification of the J/F-12 shall be the contractor’s responsibility.

1.6.2. Equipment Installation. Contractor shall install the permanent p u r c h a s e d a n d leased equipment at a date no later than 120 calendar days after award of the contract.

1.6.3. Temporary Equipment. Temporary equipment with the same capabilities as the permanent equipment to be installed, may be installed in the place of the permanent equipment while the permanent equipment is prepared for delivery and installation at Eglin AFB and Duke Field.

1.6.4. Equipment Covered. Contractor shall cover the leased equipment installed in each system for the tenure of the contract per the contract agreement. This warranty will be a minimum of five years, the overall duration of the basic contract. Contractor shall cover the purchased equipment installed in each system for a minimum of five years.

1.6.4.1. Equipment provided by the host that is not controlled or part of the contractor-installed system is not covered under this contract although testing of these components may occur during on-site technician visits if problems in the system are caused by these sources.

1.6.5. Multiple Systems Integration. Multiple Systems Integration is a key process in the systematic application of these various systems. This process focuses on the radar, UAS, maritime, and camera systems to be co-located and centrally controlled/utilized over a secure web-based application that can be accessed by a limited user group (minimum of 10 users).

1.6.5.1. The radar and its associated software shall be able to communicate and integrate with the existing systems/software in place at Eglin AFB.

1.6.6. System Maintenance. Contractor shall provide technical support, preventive maintenance, and engineering expertise to maintain co-integrated (combined) BDR/DDR/MSR/Camera systems located on Eglin AFB and Duke Field for the duration of the lease. The service level agreements (SLA) determined for these systems include the following services:

Page - 7 - of 14

1.6.6.1. Toll-Free Hotline Support. The contractor shall provide toll-free hotline support that is critical for any system under a maintenance agreement. Hotline support shall be included in each level of coverage in this contract.

1.6.6.2. Email Support. The contractor shall provide 24/7 email support; the user may send an email to the contractor’s support staff to reach the engineering support team. Emails shall be answered the next business day upon receipt of the email.

1.6.6.3. Ticket System. Trouble ticket tracking is essential to support open issues. Contractor’s ticketing system must provide full visibility for end users:

• Once a call or email is received by support staff, a ticket must be opened with the information on the issue within 24 hours.

• Users must have online access to view customer tickets in the system.

• Support staff must review the open trouble tickets each day and work toward a resolution for the open issues.

• A plan shall be put in place and described in the ticket to reach the goal of every ticket being closed within 48-72 hours.

• When equipment is being replaced by the manufacturer, contractor must follow up to obtain tracking information to determine when the system can be fully operational again.

1.6.6.4. Equipment Replacement or Repair. Contractor must repair or replace all defective or damaged equipment. An annual maintenance/preventive maintenance inspection (PMI) is a minimum requirement. Validated tests of Avian Radar, UAS detection, and Maritime Surveillance should be performed during these visits.

1.6.6.5. On-site Support. The contractor will be required to dispatch a technician or engineer to Eglin AFB or Duke Field with a response time of 48-72 hours for any issue that cannot be resolved over the phone or by email.

1.6.6.6. Preventive Maintenance. Contractor shall provide preventive maintenance for the covered equipment that shall include a contractor technician or engineer performance of a full diagnostic on the installed system. While on site to perform preventive maintenance, the following functions are performed but are not limited to (when applicable):

• Interview users to see if there are any known problems.

• Install system patches and firmware updates if needed.

• Clean filters, lenses for cameras, etc.

• Clean rack and chassis (dust)

• Inspect all components and external peripherals

• Repair anything not working properly with the system if additional equipment or programming is not required.

• Perform all functions of the system to verify proper performance.

• Check mounts for security and sturdiness

• Verify all components power on/off properly

Page - 8 - of 14

This includes preventive maintenance visits that shall be at a minimum semi-annually. The visits may be sooner or later than scheduled if coordinated directly with the system users and the Contracting Officer.

2.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES

2.1. Government Services. The Government will provide electrical and communications fiber infrastructure to support the avian radar/UAS/maritime radar/camera system.

Note: power and communication fiber will be in-place at the selected sites. The contractor shall use existing power and communication fiber for the equipment and the contractor will coordinate connection of the equipment to be installed with the COR.

3.0 GENERAL INFORMATION

3.1. Recognized Holidays.*

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Juneteenth Day Thanksgiving Day Independence Day Christmas Day

*If the holiday falls on a Saturday, it will be observed on the preceding Friday. If the holiday falls on Sunday, it will be observed on the following Monday (Normal Base Hours of Operation are 0700-1600).

3.2. Contractor Personnel.

3.2.1. Privately Owned Vehicles. Each Contractor employee driving a privately owned vehicle on the installation must carry minimum liability insurance as required by the state. Contractor employees shall adhere to all posted speed limits and shall not use hand-held cellular telephones while driving on the installation for phone calls or texting. Use of seatbelts is mandatory. Any Contractor employee cited for driving under the influence will have their driving privileges immediately revoked for a period to be determined.

3.3. Other. While on base, contractor shall adhere to all rules, regulations, safety and security policies. The 96 TW/COR is responsible for providing the contractor this information.

3.4. Contractor Access to Air Force Installations. All Contractor employees will be subject to a criminal history background check IAW Air Force Manual (AFMAN) 31-113. Vehicle registration, proof of insurance, and a valid driver's license must be presented for vehicles.

Installation Commanders may deny access and credentials based on information obtained during identity vetting that indicates the individual may present a threat to the good order, discipline, and morale of the installation.

3.4.1. Base Access. The Contractor shall ensure the pass and identification items required for contract performance are obtained for employees and non-Government owned vehicles.

Page - 9 - of 14

3.4.2. During performance of the contract, the Contractor shall be responsible for obtaining required identification for newly assigned personnel. The Contractor shall be responsible for prompt return of credentials and vehicle passes for: 1) any employee who no longer requires access to the work site; 2) upon request by a CO; and 3) upon completion or termination of the contract.

The prime Contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office. Failure to comply with these requirements may result in withholding of payment.

Page - 10 - of 14

4.0 ATTACHMENTS

Attachment 01

The physical location of the BDR/DDR equipment will be located between runways 02-20 and 12- 30 at a pre-existing site at Eglin AFB Florida airfield.

Page - 11 - of 14

Attachment 02

The physical location of the BDR/DDR equipment will be located West of Taxiway A at a pre-existing site at Duke Field Florida airfield.

Taxiw ay A

Page - 12 - of 14

Attachment 03

The physical location of the 2x MSR equipment and 1x EO/IR camera will be located East of building 462 on the shoreline at a pre-existing site at Eglin AFB Florida.

Page - 13 - of 14

Attachment 04

The physical location of 1x MSR equipment and 1x EO/IR camera will be located by the Eglin Bayview Events Center at a pre-existing site at Eglin AFB Florida.

Page - 14 - of 14

Attachment 05

The physical location of airfield EO/IR cameras will be 1x located on building 104 and 1x located on building 1412 on Eglin AFB Florida airfield.

3.1. Recognized Holidays.*
3.2. Contractor Personnel.