Attachment 1 - SOO.pdf
PDF 141 KB Posted
- Solicitation number
- F3G3CE5036A001
About this file
This is a Statement of Objectives (SOO) for repair work at Nellis Air Force Base, NV requiring the contractor to troubleshoot and repair a nitrogen leak in a Waukesha 69Kv Transformer (T2) located in Building 721 Substation, and replace the existing Waukesha Dual Column Dehydrating Breather (DCB) with new matching equipment. The work is scheduled for February 2025.
The contractor must provide all labor, equipment, and materials to diagnose and repair the nitrogen systems to manufacturer specifications, conduct a 3 PSI pressure test, and provide a final report. The government will handle all switching and lock-out-tag-out operations. The new DCB installation includes all required wiring and must be fully operational without alarms. All work carries a one-year warranty and must comply with manufacturer recommendations, NEC, and applicable codes. The facility is located at 4650 Carswell Avenue, approximately 9 miles north of downtown Las Vegas. The contractor must maintain OSHA/AFOSH compliance and keep the worksite clean and accessible.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| F3G3CE5036A001 Sources Sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Objectives
Repair Nitrogen & Replace DCB Transformer T2 Substation Bldg 721
Nellis AFB, NV
February 2025
SOO-1
1. SCOPE:
The Contractor shall provide all labor, equipment, and materials to troubleshot and repair a nitrogen leak in Waukesha 69Kv Transformer, serial # 51304-A hereby referred to as (T2), located in Bldg. 721 Substation.
The Contractor shall include within its scope any/all diagnostics, repairs, and testing required to restore the existing nitrogen systems back within the manufactures specifications. The Government shall perform all switching, and lock-out-tag out (LOTO) operations ensuring that transformer (T2) is deenergized prior to the Contractor performing any work. Upon completion of the work the Contractor shall seal (T2) and perform a pressure test (3 PSI) to ensure no leaks and provide the Government with a final report. Moreover, the Contractor shall include within its scope all labor, material, and equipment required to replace the existing Waukesha Dual Column Dehydrating Breather (DCB) with new matching same type materials.
The scope shall include any/all wiring to the new DCB and upon completion, shall be fully operational and free from any alarm conditions. All work shall be free from defects, warranted for a period of (1) one year from acceptance of the Government and shall be in compliant with all manufacturer’s recommendations, NEC and all applicable code requirements.
2. LOCATION:
Nellis Air Force Base (NAFB) is located approximately nine (9) miles north of downtown Las Vegas on State Highway 604 (Las Vegas Blvd). NAFB consists of three main areas: the Main Base, Area II, and Area III. The project site is located in Main Base at Bldg 721 and address 4650 CARSWELL AVENUE, Nellis AFB, Nevada 89191.
3. APPLICABLE CODES:
The latest edition of the International Building Code (IBC), International Plumbing Code (IPC), Department of Defense Unified Facilities Criteria Standards (UFC), All Public Laws (P.L.), Executive Orders (E.O.), Code of Federal Regulations (CFR), Department of Defense Instructions (DODI), Department of Defense Directives (DODD), National Electrical Code (NEC), International Mechanical Code (IMC), Nellis – Creech Base Installation Facility Standards (IFS), and Clark County, State of Nevada, and Federal standards, codes, and laws or other higher authority documents as applicable. The Contractor must specifically comply with the most recent copy of the following documents: UFC 03-600- 01, UFC 3-410-01, UFC 3-420-01, UFC 3-520-01, NFPA 72, Americans with Disabilities Act (ADA), Uniform Federal Accessibility Standards (UFAS), Base Fire Protection Standards, AFMAN 32-1084 Standard Facility Requirements and UFC 3-120-10 Interior Design, Federal Aviation Administration (FAA), UFC 3-101-01_c5 Architecture. Any discrepancies between code or standard provisions, and the contract documents shall immediately be brought to the Contracting Officer’s attention, and the more stringent requirements shall apply unless otherwise directed.
4. HEALTH SAFETY:
The Contractor shall be responsible for compliance with OSHA and AFOSH standards. The Contractor shall maintain a clean and debris free work site. The Contractor will always keep driveways and entrances into and around the work site clear. The Contractor will not use driveways or entrances as employee parking or storage of materials unless otherwise stated. The Contractor will minimize storage of materials and equipment on site.
---------------------------------------------END OF OBJECTIVES----------------------------------------