N O A A L a J o l l a L a b o r a t o r y R e p l a c e m e n t P r o j e c t
G i b b e n s D r a k e S c o t t G o u l d E v a n s T r a n S y s t e m s H D R A | D W R B
Submittal Review Transmittal | 4041 Mill Street, Kansas City, Missouri 64111 t 816.931.6655 f 816.931.9640
Project: LaJolla Laboratory Replacement
Specification Description:
Solar PV As-Builts Revised Specification No. 005-16800-4
To: NOAA Western Acquisition Division Date Received: 4/5/2013
7600 Sand Point Way NE Date Returned: 4/8/2013 Seattle, WA 98115
GDS Project No:
201066.04
Contract For: NOAA Attention: Mark Eberling, COTR Contract Number: AB1330-10-CN-0114
To: Rudolph & Sletten
10955 Vista Sorrento Pkwy, #100 San Diego, CA 92130
Attention: Mike Samudio
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the drawings and specifications. This check is only for review of general conformance with the design concept of the project and general compliance with the information given in the contract document. The contractor is responsible for confirming and correcting all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with that of other trades and performing his work in a safe and satisfactory manner.
Comments:
Spec No: Section Description: Action 005-16800-4 Solar PV As-Builts Revised AAP
AAP Approved AAN Approved as Noted ANR Approved as Noted-Resubmit DIS Disapproved I/O Information Only
Cc:
Gould Evans Gibbens Drake Scott TranSystems HDR ADWRB
GIBBENS DRAKE SCOTT, INC.
9201 E. 63rd Street, Suite 100 Raytown, Missouri 64133
Project Name: NOAA La Jolla Southwest Fisheries Lab Consolidation
Task Order: T0018
GDS Project No. 201066.04
Section Number: 16800 Description: Solar PV as-built resubmittal
Reference Submittal Number: 005-16800-4
GDS Shop Drawing Number: E21R4 x NO EXCEPTION TAKEN MAKE CORRECTIONS NOTED
REJECTED REVISE and RESUBMIT
REVIEWED FOR COMPLIANCE WITH CONTRACT DOCUMENTS AND
SPECIFICATIONS ONLY, AND NOT FOR APPROVAL OF CONSTRUCTION.
Comments:
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the drawings and specifications. This check is only for review of general conformance with the design concept of the project and general compliance with the information given in the contract document. The contractor is responsible for confirming and correcting all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with that of other trades and performing his work in a safe and satisfactory manner.
Reviewed by:
Gerry Batrez
Date: 4/8/2013
Submittal Packages Detailed with Items and Reviewers
NOAA La Jolla Laboratory Replacement Project # 3141-0 Rudolph and Sletten
8901 La Jolla Shores Dr.
La Jolla, CA 92037
Tel:
Fax:
Solar PV As-Builts005-16800-4
Author Company Contact Author Package # Trade Importance
Rudolph and Sletten Dustin Matteson Solar Panels Normal
Items
Item No. Register No. Rev. Description Type Action Logged By Returned Closed
¨ ¨001 960115838.37 4 Solar PV As Builts As-Builts.
Reviewers
From Company To Company Sent Date DueDate Received Date +/- Action Sent For
Rudolph and Sletten - Dustin Matteson U.S. Department of Commerce, NOAA, Western Acquisition Division - NOAA Designer
4/4/2013 4/18/2013 In Review Review
Package Notes Reviewer General Comments
[10/29/2012 11:28 AM U.S. Department of Commerce, NOAA, Western Acquisition Division - NOAA Designer]
1. PV as-built contractor shall show the locations of all roof mounted PV disconnect switches, conduit routing and where conduits penetrate the roof and route to the inverter.
Revised As-Builts Issued to Address FDE's comments which were issued After the submittal resposne was received.
[3/14/2013 12:19 PM U.S. Department of Commerce, NOAA, Western Acquisition Division - NOAA Designer] Refer to Kim Parson’s comments throughout the submittal, make corrections and re-submit.
[4/3/2013 9:28 AM U.S. Department of Commerce, NOAA, Western Acquisition Division - NOAA Designer] The number of “combiners” does not match sheet to sheet. Drawing PV2.1 indentifies a different number of “combiners” than other drawings. Please correct and re-submit.
Prolog Converge Printed On: 4/4/2013 Page 1 of 1
SHEET INDEX
SHEET NUMBER DESCRIPTION
PV-1 NOTES & SYMBOLS / SHEET INDEX
PV-2 PHOTOVOLTAIC SINGLE LINE DIAGRAM
PV-2.1 ELECTRICAL CALCULATIONS
SL0 ROOF PLAN
SL1 RACKING DETAILS
PV-4 SPECIFICATION SHEETS
PV-5 PLACARDS
STRUCTURAL PACKAGE INCLUDED SEPARATELY
EQUIPMENT SCHEDULE
BUILDING MODULE INVERTER COMBINER
NOAA SHARP NU-U240F2 240W 826 TOTAL SATCON PVS-100 (100KW) 2 TOTAL SOLAR BOS CS75-06-16-4XF 11 TOTAL dustin.matteson
M
SPACE ONLY
INVERTER B
G
N
D
OFF
ON
G
N
D
N
G N D
INVERTER A
G
N
D
G N D
| Shop Drawing Review Form-GE-LaJolla Submittal Review Transmitta Solar PV As-Built #4.pdf |
| 20106604-E21R4-005-16800-4 PV as-built Shop Drawing Review.pdf |
| 005-16800-4 Solar PV As-Builts Revised |
| Submittal Package Detail (23).pdf |
| NOAA La Jolla Laboratory Replacement |
005-16800-4 NOAA- 4.4.13.pdf
File details come from the government source that posted it. Updated .