Attachment 1 - Snow Modeling Statement of Work.pdf

PDF 87 KB Posted

Attached to
SNOWPACK MODELING TO SUPPORT WATER SUPPLY FORECASTING Federal contract opportunity
Solicitation number
12FPC324Q0090
Issued by
Department of Agriculture Under Secretary for Farm Production and Conservation

About this file

This document is a Statement of Work (SOW) that outlines the scope, objectives, deliverables, and timeline for a project to improve the skill of existing statistical and machine learning water supply forecasting methods used by the USDA-NRCS National Water and Climate Center (NWCC).

The project has two main components: 1) creating a long-term historical gridded dataset of snowpack modeling data (including snow water equivalent, cold content, and surface water input) from water year 1980 through 2024 for approximately 15 watersheds in the western U.S., which will be provided to NWCC hydrologists to evaluate for improving water supply forecast skill; and 2) demonstrating the capability to run the same modeling systems and framework in near real-time (24-hour latency) to support NWCC's operational water supply forecasting.

The solicitation number is 12FPC324Q0090, and it is being issued by the Department of Agriculture Under Secretary for Farm Production and Conservation. Offerors must employ a physically-based snowpack model capable of high-resolution (1 km or finer) gridded modeling of the required snowpack parameters.

View the file

Other files for this federal contract opportunity

Other files attached to SNOWPACK MODELING TO SUPPORT WATER SUPPLY FORECASTING, newest first.
File Type Posted
Combined Synopsis and Solicitation - 12FPC324Q0090.pdf PDF
Attachment 3 Vendor Info Sheet.docx DOCX document
Attachment 2 - Quote Sheet.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Snowpack Modeling to Support Water Supply Forecasting

STATEMENT OF WORK

Project Overview:

The purpose of this Statement of Work is to outline the scope, objectives, deliverables, and timeline for a project aimed at improving the skill of the existing statistical and machine learning water supply forecasting methods in use at the USDA-NRCS National Water and Climate Center (NWCC). This project investigates the potential use of long-term, historical, physically-based snowpack modeling to enhance existing NWCC water supply forecasting methods by providing additional spatial context of the snowpack state. The proposed project has two components: creation of the historical gridded data set and demonstration of near real-time capabilities.

The first component is long-term historical snow state modeling (including a minimum of SWE, cold content, surface water input), encompassing water year (WY) 1980 through WY 2024 for approximately 15 unique watershed-based modeling domains to be specified through a collaborative effort with NWCC hydrologists. Modeling domains range in size from 1,000-3,000 square miles, encompassing different hydroclimatic and snowpack regimes in the mountainous Western United States where snowmelt sources a majority of available surface water. High resolution gridded modeled snow water equivalent (SWE) data will then be aggregated and summarized by subbasin and elevation bands within the modeling domain. The summarized information will be passed to NWCC hydrologists for evaluation in the existing operational water supply forecasting system to determine viability of these input variables for improving water supply forecast skill.

The second component is the near real-time running of the same modeling systems and framework to support operational water supply forecasting. Thus, any products derived from gridded snow data must also be capable of supporting real-time modeling, which is defined here as the capability of delivering model results from the previous day by 8:00 am Pacific Time (24 hours latency) for all basins of interest within the modeling domains.

Project Requirements:

1. Employ a physically-based snowpack model capable of high-resolution (<=100m) modeling which captures the spatial and temporal context of basin-scale seasonal snowpack.

2. Use high-resolution (<5km), hourly, gridded weather products as model forcing data.

3. Use lidar-derived bare earth elevation data to initiate the snowpack model if available.

Comprehensive lidar-derived vegetation parameterization should also be included within the model if available. This includes characterization of large fire scars, if applicable, as terrain, vegetation, and disturbance at fine scales are an important control on snowpack accumulation and evolution.

4. Assimilate remote sensing data into the model including snow depth, albedo, and snow-covered area as available. Provide data assimilation reports of the changes and results.

5. Implement spatial and temporal bias correction methods for model forcing variables with a focus on precipitation data. The need for bias-corrected input fields should be based on comparison to existing weather and snow monitoring station measurements, including the SNOTEL network. Bias correction methods must be capable of being deployed in near real-time to be applicable for operational water supply forecasting.

6. Deliver a report quantifying model performance / error in snowpack state variables (to include depth, density, and SWE) based on comparisons between model results and snow measurements from observation stations (including the SNOTEL network) across all model runs for each modeling domain.

7. Deliver daily gridded snowpack state and flux fields, and any derived snowpack summary products for WY 1980 to WY 2024 from the physically-based snowpack model.

8. Deliver daily gridded bias-corrected forcing fields for WY 1980 to WY 2024 and a summary report of the bias correction methods and comparisons to observations (including observations from the SNOTEL network).

9. Deliver documentation detailing model operation, input data sources, and calibration / validation results.

10. Demonstrate the capability of near real-time modeling to support operational streamflow forecasting by providing model output and derived data products at the specified latency.

This includes: 1) near real-time daily SWE grids, summarized by subbasin and elevation bands; 2) analysis reports on a semimonthly basis (1st and 16th day of the month) from December 1 through July 16 detailing distributed snowpack state variables (SWE, cold content and surface water input) how they have changed since the previous report.

11. Deliver summary data in a format to facilitate integration and testing within the existing NWCC water supply forecasting system and architecture.

Project Timeline, Deliverable and Invoice Schedule:

Timelines are for delivery from project start. Accelerated delivery schedule is preferred.

Three months: Complete modeling for a single basin for the entire period of record (WY1980 to WY 2024) with applied forcing data bias adjustments and snowpack data assimilation as possible. Deliver gridded, daily model results and summarized data products to NWCC. Invoice opportunity for work completed (15% contract total).

Four months: Demonstrate real-time modeling capability for initial model domain. Invoice opportunity for near real-time modeling capability (10% contract total).

Nine months: Complete optimized/debiased model runs for half of the remaining model domains for the entire historical period of record (WY 1980 to WY 2024). Invoice opportunity for work completed (25% contract total) Fifteen months: Complete optimized/debiased model runs for all remaining model domains for the entire historical period of record (WY 1980 to WY 2024). Final bias correction, data assimilation and model performance reports complete. Invoice opportunity for work completed (30% contract total) First full water year following completion of all historical modeling domain runs: Initiate real-time modeling capability for all model domains for first available full water year.

Provide near real-time daily SWE grids, subbasin and elevation band summaries. Invoice for work completed (20% contract total)

File details come from the government source that posted it. Updated .