Attachment 1 Site Survey Template.pdf
PDF 483 KB Posted
- Attached to
- Facility Related Control System Camera Documentation Project Federal contract opportunity
- Solicitation number
- HQ003424R0296
- Issued by
- DOD Washington Headquarters Service
About this file
This document is a Site Survey Template for the FRCS Camera project, which is related to the federal contract opportunity for the Facility Related Control System Camera Documentation Project.
The template provides detailed instructions and documentation requirements for conducting a site survey to determine the necessary infrastructure and equipment needed to install FRCS cameras at a specific location. It covers information about the existing rack space, backbone fiber to the core switches, horizontal connectivity from the end-items to the FRCS switches, and any additional miscellaneous notes. The template appears to be a comprehensive tool to capture all the relevant details required to successfully implement the camera system at the site. While this document does not directly address the contract opportunity, it provides important technical details that would likely be relevant to the overall project requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 DD254.pdf | ||
| HQ003424R0296-0001.pdf | ||
| HQ003424R0296.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FRCS CAMERA SITE SURVEY TEMPLATE
Version 1.0, 10/18/2022 UNLASSIFIED Page 1 of 6
LOCATION INFO
Assoc. Line # Inside/Outside: Building: Room:
1. New FRCS Switch Install Location
RACK INFO
RACK# HEIGHT RU
LOCATION FLOOR/WALL
MOUNT?
Sketch existing rack elevation and identify new FRCS switch location
Has the Rack space been marked/reserved? Yes: No:
Version 1.0, 10/18/2022 UNLASSIFIED Page 2 of 6
LOCATION INFO
Assoc. Line # Inside/Outside: Building: Room:
Draw the Floor Plan below (Note: Include cable entry point, equipment racks, power panels, UPS, HVAC)
Version 1.0, 10/18/2022 UNLASSIFIED Page 3 of 6
LOCATION INFO
2. Backbone Fiber to FRCS Core Switches 3N48 & 3N100
Existing Backbone Fiber
FRCS 3N48 Cor3 Switch Path
CBL
(SMF,
62.5)
FDP# 1
(RM.RACK.FDP.PORT.COM)
FDP# 2
(RM.RACK.FDP.PORT.COM)
FDP# 3
(RM.RACK.FDP.PORT.COM)
FDP# 4
(RM.RACK.FDP.PORT.COM)
SW
Port
FRCS 3N100 Core Switch Path
CBL
(SMF,
62.5)
FDP# 1
(RM.RACK.FDP.PORT.COM)
FDP# 2
(RM.RACK.FDP.PORT.COM)
FDP# 3
(RM.RACK.FDP.PORT.COM)
FDP# 4
(RM.RACK.FDP.PORT.COM)
Have the pairs been reserved? Yes: No:
Identify NEW/REQUIRED Fiber Optic Backbone Patch Cords
Quantity Type
(ex. SMF LC-LC)
Length
(ex. 1M, 2M, 3M, etc)
Does new backbone cable need to be installed? YES: NO:
Version 1.0, 10/18/2022 UNLASSIFIED Page 4 of 6
Identify Required Bill of Material for new backbone run Line
# Description Part Number QTY
Version 1.0, 10/18/2022 UNLASSIFIED Page 5 of 6
3. Horizontal Connectivity from End Item to FRCS Switch
Horizonal Fiber
CBL CDP / FDP# 1
(RM.RACK.FDP.PORT.COM)
CDP / FDP# 2
(RM.RACK.FDP.PORT.COM)
CDP / FDP# 3
(RM.RACK.FDP.PORT.COM)
CDP / FDP# 4
(RM.RACK.FDP.PORT.COM)
Identify NEW/REQUIRED Fiber /Copper Horizontal Patch Cords
Quantity Type
(ex. SMF LC-LC, CAT6 RJ45)
Length
(ex. 1M, 2M, 3M, etc)
Version 1.0, 10/18/2022 UNLASSIFIED Page 6 of 6
4. Misc. Notes
File details come from the government source that posted it. Updated .