This document is a Statement of Work (SOW) for the installation of three customer-provided weboost Office 100 (75 Ohm) cell signal boosters at Bldg 90620, Rm 225, 228, & 205 located at 249 Red Horse Rd, Hurlburt Field, FL. The contractor shall provide all necessary supervision, labor, tools, supplies, and other items to install and test the three boosters according to industrial specifications and OSHA regulations. The government will provide the signal boosters, antennas, and other necessary equipment. The contractor must obtain base access and comply with all security and safety requirements. The SOW includes detailed placement and installation instructions, as well as requirements for system testing and facility inspections.

The related federal contract opportunity is a solicitation (FA441724Q0067) issued by the Department of the Air Force Special Operations Command for the Cell Booster Installation at Hurlburt Field. It is a Firm Fixed Price contract set aside for Small Businesses. The contractor shall submit a work plan and schedule. The solicitation includes the SOW and other attachments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

Cellphone Signal Booster Installation

Bldg 90620, Rm 225, 228, & 205 249 Red Horse Rd Hurlburt Field, Fl

18 Jan 2024

1. DESCRIPTION OF SERVICES. The contractor shall provide all necessary supervision, labor, tools, supplies, and other items necessary to install and test three, customer provided, weboost Office 100 (75 Ohm) cell signal booster, model number 473060. All work shall be completed to industrial specifications and all OSHA regulations. The contractor shall accomplish all tasks to meet the requirements of the Statement of Work (SOW). The contractor shall provide all the necessary tools and equipment to complete the install. This includes any ladders, lifts, hoists, power tools, safety gear or other equipment, tools, supplies necessary to complete installation and provide necessary testing of all installed components.

1.1. SYSTEM REQUIREMENTS AND PLACEMENT. The contractor shall install the three, customer provided, weboost Office 100 (75 Ohm) cell signal booster, model number 473060 in Room 225, 228 and 205 of Bldg 90620 located at 249 Red Horse Rd, Hurlburt Field

FL 32544.

1.2. Each of the three device requires installation of an external antenna on the exterior of the building, the transmitter/receiver base, and the internal antenna. The transmitter/receiver base is to be mounted in the ceiling above the tiles and the transmitter antenna is to be mounted on a ceiling tile facing downward.

1.3. The contractor shall install a 110 VAC receptacle in the ceiling to allow the power adaptor for the antenna to be located within proximity of the transmitter/receiver base for each antenna.

1.4. The contractor shall perform an operator's check after the installation is complete. This is to ensure that the signal boosters are functioning properly.

1.5. The contractor shall ensure that all devices are installed to a structure that is undamaged and capable of supporting the device weight. The contractor will also ensure the facility has the proper power rating required to operate the devices.

2. COLLATERAL SUPPORT.

2.1. The Government shall provide the following products in support of this effort.

2.1.1. The Office 100 Booster, outside omni antenna, inside high-profile dome ceiling antenna, power supply, cables, and lightning surge protector for all three installations.

2.1.2. Coordinate access to the facility

3. GENERAL INFORMATION.

3.1. Contractor Personnel. The contractor must validate that the employees assigned to this requirement are certified to work on and possess the required experience to work on/install equipment listed in this SOW

3.1.1. Contract Manager. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate or alternates, who shall act for the contractor when the manager is absent, shall be designated in writing to the contracting officer prior to the contract start date. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

3.1.2. Base Access. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

3.1.3. Traffic Laws. The contractor and employees shall comply with base traffic regulations.

3.1.4. Weapons, Firearms, Ammunition. The contractor employees are prohibited from possessing weapons, firearms, or ammunition or within the contractor vehicle or privately owned vehicles while on the Government installation.

3.2. Re-performance of Service. When the service performed does not conform to contract requirements, the contractor shall perform or re-perform the service in conformity with contract specifications at no additional cost to the government.

3.3. Physical Security. The contractor shall ensure no government-owned, controlled real or personal property is damaged during any service provided under the contract. The contractor will be responsible for the repair or replacement of any government property damaged by the contractor at no expense to the government.

4. Attachment.

4.1. Bldg 90620 Second Floor Plan and Roof Plan

A-201

A-201

A-202

A-202

A-301

A-301

DSDS

DS

DS

DS

DS DS DS DS DS

DS

DS

DS

DS DSDS

3" / 1'-0"

3" / 1'-0"

A-310

A-311

ROOF VENT, SEE

MECHANICAL

A-310

FPA

BOUNDARY OF EXTERIOR

WALLS BELOW

VTR

A-311

A-142

A-312

DS

CHAINLINK EQUIPMENT

YARD ENCLOSURE

BOUNDARY OF

EXTERIOR WALLS

BELOW

GEJ

GEJ

GEJ

GEJ

GEJ GEJ GEJ GEJ

GEJGEJGEJ GEJGEJ

6'-0"

6'- 0"

6'-0"

6'- 0"

4'- 6"

4'- 6"

4'-6" 4'-6"

A-142

A-142

A-142

FALL PROTECTION

POST AND CABLE

SYSTEM

A-142

FALL PROTECTION

POST AND CABLE

SYSTEM

A-143

A-143

TYP. TYP.

A-143

A-312

A-142

TYP.

FALL PROTECTION

ACCESS POINT

POST

FPA

FPA FPA FPA FPA FPA

FPA

FPA

FPAFPAFPAFPAFPA

FPA

FPA

FPA

FPA FPA FPA

FPA FPA FPA

FPA

FPA

FPA

FPA

FPA

FPA FPA FPAFPAFPAFPA

FPA

FPA

PREFINISHED STANDING SEAM

METAL ROOF SYSTEM

DIRECTION AND DEGREE OF

ROOF SLOPE

PREFINISHED METAL DOWNSPOUT TO

UNDERGROUND STORMWATER SYSTEM

DS

GRAPHIC LEGEND

3" = 1'-0"

FALL PROTECTION ANCHOR POSTFPA

VENT-THRU ROOFVTR

GUTTER EXPANSION JOINTGEJ

1. FALL PROTECTION ANCHOR SPACING AND CABLE /

LAYOUT PER MANUFACTURERS REQUIREMENTS,

CONTRACTOR TO COORDINATE INSTALLATION WITH FALL

PROTECTION SYSTEM AND METAL ROOF MANUFACTURERS.

2. SLOPE ALL GUTTERS TO DOWNSPOUTS.

3. SEE EXTERIOR ELEVATIONS FOR SPECIFIC DOWNSPOUT

LOCATIONS.

ROOF NOTES

A

SHEET

IDENTIFICATION

US Army Corps of

Engineers ®

Mobile District

U S

A

R M

Y

C

O R

P S

O

F

E

N G

I N

E E

R S

D E

S I G

N E

D

B

Y

B U

L L

O C

K

T

I C

E

A

S S

O C

I A

T E

S

E

C

E R

V A

N T

E

T R

E E

T

S

U I T

E

B

P E

N S

A C

O L

A

F

L O

R I D

A

B

C

D

D R

A W

N

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

S O

L I C

I T

A T

I O

N

N

O

C O

N T

R A

C

N

P R

O J E

C

N

U M

B E

R

F I L

E

N

A M

E

M O

B I L

E

D

I S

T R

I C

T

S

A I N

T

J O

S E

H

R

E E

T

M O

B I L

E

A

L A

B A

M A

F T

E V

S O

F

C

O M

B I N

E D

Q U

A D

A C

I L

I T

Y

H U

R L

B U

R

I E

L D

H U

R L

B U

R

I E

L D

F

L O

R I D

A

A-140FTEV 153010

R O

L A

N

J G

H

J G

H

R C

R

B T

A

W R

1/8" = 1'-0"

A-140

1 ROOF PLAN

SCALE: 1/8" = 1'-0"

0 4' 8' 16'PLAN

NORTH

371 SOCTS Signal Booster Installation Statement of Work
STATEMENT OF WORK
FOR
2. COLLATERAL SUPPORT.
3. GENERAL INFORMATION.
90620_Roof Plan
Sheets and Views
Layout1

T-202

File details come from the government source that posted it. Updated .