This is a Scope of Work document for electrical rewiring services at a historic residential property owned by the Independence National Historic Park Service.
The project involves complete rewiring of a three-story residential property located at 423 Locust Street, Philadelphia, PA 19106. The contractor must remove all existing electrical wiring and install new circuits throughout the property in compliance with current safety and code standards. Key technical requirements include: installing dedicated 12/2 wire to one outlet per room with parallel wiring for additional outlets; running dedicated 12/2 wire from the panel to each light switch and to ceiling-mounted lights; installing 12/3 wiring for 3-way and 4-way switching configurations; replacing all outlets and switches with new 20-amp rated devices; installing two single 20-amp breakers per room (one for outlets, one for lights); installing 20-amp GFCI outlets in kitchens, bathrooms, and exterior areas; and running dedicated circuits to the gas furnace emergency switch, condensing unit, refrigerator, stove, and garbage disposal. The contractor must also coordinate with a drywall subcontractor to repair and patch all opened walls, ensure proper grounding and code compliance throughout, remove all debris from government property, and label each breaker at the electrical panel. Work must be scheduled through the housing manager during normal operating hours (7:00 AM – 4:00 PM), with overtime requiring 24-hour advance approval. The performance period is expected to be 90 calendar days from notice to proceed, and quality assurance will be verified through periodic inspections, documentation review, and final acceptance by the housing manager.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_5_-_Limitations_on_Subcontracting_compliance_worksheet.xlsx | XLSX spreadsheet | |
| Attachment_4_-_Certifications_From_Section_K.docx | DOCX document | |
| Attachment_3_-__Technical_Capability_Submittals.docx | DOCX document | |
| Sol_140P4226Q0056.pdf | ||
| Attachment_2_-_Wage_Determination__2015-4233.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work: Electrical Rewiring – 423 Locust Street, Philadelphia, PA Independence National Historic Park Service Index
1. Project Overview
2. Location
3. Contractor Responsibilities
4. Objective and Justification
5. Measurable Results
6. Deliverables and Quality Assurance Surveillance Plan (QASP)
7. Schedule and Milestones
8. Constraints and Park Requirements
1. Project Overview This scope of work details the requirements for a qualified electrical contractor to perform a complete rewiring of a three-story residential property owned by the Independence National Historic Park Service. The work will include removal of all existing wiring, installation of new dedicated circuits, labeling, and restoration of affected surfaces, ensuring compliance with current safety and code standards.
2. Location 423 Locust Street, Philadelphia, PA 19106. The property is a three-story historic home under the jurisdiction of the Independence National Historic Park Service.
3. Contractor Responsibilities
· Open walls on all three floors as needed to access existing electrical wiring.
· Remove all old wiring from the electrical panel to outlets, ceiling-mounted lights, and light switches.
· Run a dedicated 12/2 wire to one outlet in each room; additional outlets in each room shall be wired in parallel from the dedicated outlet.
· Install dedicated 12/2 wire from the electrical panel to each light switch; run 12/2 wire from each light switch to the ceiling-mounted light in each room.
· Where 3‑way or 4‑way switching is required, run new 12/3 wiring from the breaker panel to the switch locations. Replace existing 3‑way or 4‑way switches with new devices. From the final switch in the switching sequence, run new 12/3 wiring to the ceiling‑mounted light fixture.
· Replace all existing electrical outlets and light switches with new 20‑amp rated outlets and switches throughout the property.
· Install two single 20 amp breakers per room: one breaker for outlets, one breaker for lights. Outlets and lights shall not share a breaker.
· Install 20 amp GFCI outlets around sinks in kitchen, bathrooms, and in all outside areas.
· Run new dedicated 12/2 wire to the emergency switch of the gas furnace and new 10/2 wire to the condensing unit, using outdoor-rated wire or protecting with rigid conduit, PVC conduit, or seal tight as required.
· Identify and label each breaker at the electrical panel according to the circuit controlled.
· Hire and coordinate with a subcontractor to replace and patch all drywall opened during electrical work.
· Ensure dedicated circuits for refrigerator, stove, garbage disposal, furnace, and condenser unit (no shared circuits).
· Ensure all newly installed wiring devices, switches, outlets, and fixtures are properly grounded in full compliance with applicable electrical codes.
· Remove and dispose of all trash off government property; do not use government-furnished trash bins.
· Schedule all work through the housing manager, observing normal hours of operation (7:00 AM – 4:00 PM); overtime must be approved at least 24 hours in advance.
4. Objective and Justification The objective is to upgrade the electrical system to meet modern safety codes, support reliable operation of appliances and lighting, and ensure the safety of occupants and preservation of historic property. Dedicated circuits and GFCI outlets will mitigate electrical hazards and protect sensitive areas. Professional restoration of drywall will maintain property aesthetics and integrity.
5. Measurable Results
· 100% removal of old wiring and installation of new circuits per specifications.
· All outlets and switches powered by dedicated breakers as outlined.
· Correct labeling of all breakers and circuits at the main electrical panel.
· All drywall repairs completed to pre-project condition.
· All debris removed from site and no use of government trash bins.
· Work performed within scheduled hours and in coordination with the housing manager.
6. Deliverables and Quality Assurance Surveillance Plan (QASP)
· Completed rewiring and installation of new circuits as specified.
· Installation of new 12/3 wiring and replacement of all required 3‑way and 4‑way switches, including proper routing to ceiling‑mounted lights.
· Properly labeled electrical panel.
· Documentation of all circuits and breaker assignments.
· Documentation of all 3‑way and 4‑way switch configurations, including wire paths and device locations.
· Restored drywall surfaces in all affected areas.
· Written confirmation of debris removal and disposal procedures.
Quality will be assured through periodic inspections by the housing manager, verification of code compliance, review of labeling and documentation, and inspection of finished surfaces. Any deficiencies shall be corrected prior to project closeout.
7. Schedule and Milestones
· Pre-construction meeting and schedule confirmation.
· Start of work: To be determined and coordinated with the housing manager.
· Completion of demolition and removal of old wiring.
· Installation of new wiring and circuits.
· Labeling and documentation phase.
· Drywall restoration and site cleanup.
· Final inspection and acceptance.
All work shall be performed during normal working hours (7:00 AM – 4:00 PM). Overtime work must be approved 24 hours in advance by the housing manager.
8. Constraints and Park Requirements
· Contractor must comply with all Independence National Historic Park Service regulations and guidelines.
· Work areas must be properly protected to avoid damage to historic features.
· No use of government-furnished trash bins for debris disposal.
· All restoration work must match the original finish and appearance.
· Contractor shall coordinate with park staff to minimize disruptions.