Attachment 1 Scope of Work.pdf

PDF 235 KB Posted

Attached to
Mitel MiVoice Connect Annual Hardware and Software Maintenance Federal contract opportunity
Solicitation number
12805B23Q0455
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area

View the file

Other files for this federal contract opportunity

Other files attached to Mitel MiVoice Connect Annual Hardware and Software Maintenance, newest first.
File Type Posted
Attachment 2 Wage Determination 2015-5421 Rev 24.pdf PDF
Solicitation 12805B23Q0455.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

United States Department of Agriculture (USDA) Agricultural

Research Service (ARS) Administrative and Financial Services (AFM)

Information Technology Services Division (ITSD)

Mitel Hardware/Software Maintenance Renewal in Plains Area

(PA)

1.0 Introduction

The Clinger-Cohen Act of 1996 established the position of the Chief Information Officer (CIO). The CIO implements the provisions of the Clinger-Cohen Act of 1996 and the Paperwork Reduction Act of 1995 regarding the acquisition, management, and use of information technology (IT) resources;

manages United States Department of Agriculture (USDA), Agricultural Research Service (ARS) compliance with the Computer Security Act of 1987, the Federal Information Security Management Act of 2002 (FISMA), Homeland Security Presidential Directive 7 of December 17, 2003, and Presidential Decision Directive 63 of May 22, 1998, Critical Infrastructure Protection; and implements the Office of Management and Budget Circular A-130, Management of Federal Information Resources.

The CIO serves as the principal advisor to the Agency on information resources and information systems management and strives to improve the operations and service delivery of ARS's programs through the effective use of technology. The CIO directs ARS's Office of the CIO (OCIO), which supports these activities.

2.0 Scope

The United States Department of Agriculture (USDA) Agriculture Research Service (ARS) Administrative and Financial Services (AFM) Information Technology Services Division (ITSD) requires re instatement of Mi tel MiVoice Annual Hardware/So ftware Maintenance. Mi tel Hardware/Software Maintenance provides United States Department of Agriculture with Voice over Internet Protocol (VoIP) support services to troubleshoot, upgrade and maintain the VoIP system.

3.0 Period of Performance

6/12/2023 - 6/30/2023

4.0 Tasks

Provide standard 1-year annual Mi te l Hardware/Software Maintenance renewal to include upgrading the current software version which has reached its end-of-life. Expert support is also required to ensure that older phone hardware will work with the newer “MITEL Connect” system. There are also faults in the system that are preventing the PA from using the phones consistently and without error.

This constitutes a functionality issue and potential safety issue if our critical telephone infrastructure is not available.

5.0 Deliverables

6.0 Coordination of Work

The PA Project Manager, with the assistance of the local IT staff, will ensure that Mitel Connect instance is available via the USDA internet connections and configured to meet the site operational requirements. Local IT staff will work with PA Project Manager to ensure all USDA Network Security requirements are met.

7.0 Facility Security Requirements

The government shall provide workspace, computer, and telephone access to the contractor.

Government furnished resources can be obtained between the hours of 8:00 a.m. to 4:00 p.m.

Monday through Friday unless otherwise agreed upon by ARS and the Contractor.

The Contractor shall have access to Government property, personnel facilities, and data as may be required to discharge its responsibilities in an effective and efficient manner. Any activity under this task, which is performed by the Contractor or any of its subcontractors, on premises under

Deliverable Submitted To Due By Project Management Plan PA Project Manager and COR Two weeks after award of contract Project Schedule PA Project Manager and COR Two weeks after award of contract Project Risks PA Project Manager and COR Two weeks after award of contract Proposed products, equipment, materials, and methods to be used

PA Project Manager and COR Prior to award

Warranties, Software Licenses and Maintenance Agreements

PA Project Manager and COR Within 2 weeks following completion of project

Software Line-Item Pricing, if applicable

PA Project Manager and COR Within 10 Days of Award, or Within 10 Days of Software Activation for Licenses Provided After Award Date government control, is subject to the provisions of any resultant contract.

All contractor personnel who work at USDA must have approval for facility access. Prior to work starting, the contractor must supply the names of those employees selected to perform the work.

Due to security requirements, pre- notification of all visitors to the USDA facilities is required.

Anyone requiring access must obtain approval prior to arrival at the location.

8.0 Place of Performance

USDA ARS Plains Area, 2150 Centre Ave, Bldg. D. Suite 300 Fort Collins, CO. 80526

9.0 Government Supplied Resources

ARS will provide building diagrams if available etc. needed in fulling the tasks identified in this SOW. All other equipment supplies and materials shall be provided by the contractor.

10.0 Information Sensitivity

PA Employees and USDA visitors shall adhere to the Privacy Act, Title 5 of the U.S.

Code, Section 552a and applicable agency rules and regulations.

11.0 Section 508 – Accessibility of Electronic and Information Technology

This contract vehicle is subject to Section 508 of the Rehabilitation Act of 1973 (29 U.S.C. 749d) as amended by the Workforce Investment Act of 1998 (P.L. 105-220). The Revised Section 508 Standards, which consist of 508 Chapters 1 and 2 (Appendix A), along with Chapters 3 through 7 (Appendix C), contain scoping and technical requirements for information and communication technology (ICT) to ensure accessibility and usability by individuals with disabilities. Compliance with these standards is mandatory for Federal agencies subject to Section 508 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794d).

Each ICT product or service furnished under this contract shall comply with the Revised Section 508 ICT Accessibility Standards at a minimum, as specified in the contract. If any furnished product or service is determined to be noncompliant, the Contracting Officer will notify the Contractor in writing. The Contractor shall, without charge to the Government, remediate or replace the noncompliant products or services within a specified timeframe as determined by the Government in writing. If such remediation or replacement is not completed within the time specified, the Government shall have the following recourses:

1. Cancellation of the contract, delivery, task order, purchase, or line item without termination liabilities; or

2. In the case of custom ICT being developed by a contractor for the Government, the Government shall have the right to have any necessary changes made or repairs performed by itself or by another firm for the noncompliant ICT, with the contractor liable for reimbursement to the Government for any expenses incurred thereby.

The contractor must ensure all noncompliant ICT products and services are provided pursuant to extensive market research and exhibit the highest level of compliance while satisfying the contract requirements.

For every ICT product or service accepted under this contract by the Government that does not comply with the Revised Section 508 Accessibility Standards, the contractor shall, at the discretion of the Government, remediate or upgrade the item with a compliant equivalent product or service, if commercially available and cost neutral, on either a contract specified refresh cycle for the product or service, or on a contract effective option/renewal date, whichever shall occur first.

Section 508 Compliance

Vendors, contractors, and their respective ICT products and services shall comply with the following standards, policies, and procedures. In the event of conflicts between the referenced documents and this contract vehicle, the contract vehicle shall take precedence.

1. Revised Section 508 ICT Accessibility Standards

2. Section 508 of the Rehabilitation Act as amended (29 U.S.C. 794d)

3. Federal Acquisition Regulation (FAR) Subpart 39.2

4. USDA Section 508 Departmental Regulation

Additionally, all contract deliverables are subject to these standards.

All ICT products and services, regardless of format, must conform to the applicable Section 508 standards to allow Federal employees and members of the public with disabilities equivalent access to and use of information and data provided to those without disabilities.

All contractors, sub-contractors, and consultants are responsible for preparing or posting content must comply with the applicable Section 508 accessibility standards and, where applicable, those set forth in the referenced policy or standards document. Remediation of any noncompliant ICT or materials as set forth in this contract vehicle shall be the responsibility of the contractor, sub-contractor, or consultant.

According to the Access Board’s Section 508 Scoping Requirements The following Section 508 provisions apply to the products and/or services identified in this contract vehicle:

• C202 Functional Performance Criteria: Where the requirements in Chapters 4 and 5 do not address one or more functions of telecommunications or customer premises equipment, the functions not addressed shall conform to the Functional Performance Criteria specified in Chapter 3.

https://www.access-board.gov/ict/#about-the-ict-accessibility-standards https://www.access-board.gov/law/ra.html#text-of-section-508-of-the-rehabilitation-act-of-1973-as-amended-29-usc-794d https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2039_2.html http://www.ocio.usda.gov/document/departmental-regulation-4030-001 https://www.access-board.gov/ict/#508-chapter-2-scoping-requirements https://www.access-board.gov/ict/#C202-functional-performance-criteria

• C203 Electronic Content: Electronic content that is integral to the use of telecommunications or customer premises equipment shall conform to Level A and Level AA Success Criteria and Conformance Requirements in WCAG 2.0.

• C204 Hardware: Where components of telecommunications equipment and customer premises equipment are hardware, and transmit information or have a user interface, those components shall conform to applicable requirements in Chapter 4.

• C205 Software: Where software is integral to the use of telecommunications functions of telecommunications equipment or customer premises equipment and has a user interface, such software shall conform to C205 and the applicable requirements in Chapter 5.

WCAG Conformance: User interface components, as well as the content of platforms and applications shall conform to Level A and Level AA Success Criteria and Conformance Requirements in WCAG 2.0.

• C206 Support Documentation and Services: Where support documentation and services and provided for telecommunications equipment and customer premises equipment, manufacturers shall ensure that such documentation and services conform to Chapter 6 and are made available upon request at no additional charge.

In addition, vendors and contractors shall comply with the standards, policies, and procedures below for all ICT pursuant to this contract:

• For Custom ICT Development Services, the vendor or contractor shall ensure the ICT fully conforms to the applicable Revised Section 508 standards prior to delivery and before final acceptance.

• For Installation, Configuration, and Integration Services, the vendor or contractor shall not install, configure, or integrate the equipment and software in a way that reduces the level of conformance with the applicable Revised Section 508 standards.

• For Maintenance, Upgrades, and Replacements, the vendor or contractor shall ensure maintenance upgrades, substitutions, and replacements do not reduce the original level of conformance with the applicable Revised Section 508 standards at the time of the contract award.

• Service Personnel are ensured by the vendor or contractor to possess the knowledge, skills, and ability necessary to address the applicable Revised Section 508 standards and shall provide supporting documentation upon request.

• When providing Hosting Services, the vendor or contractor shall not reduce the existing level of conformance of the electronic content with the applicable Revised Section 508 standards.

• When purchasing ICT where 1) Section 508 validation is not possible prior to award, 2) the ICT will be changed after the award, or 3) ICT will be hosted in a third-party environment, the vendor or contractor shall test and validate the ICT solution for conformance to the Revised Section 508 standards, in accordance with the required testing methods as defined by the agency.

• The vendor or contractor shall document and maintain information regarding the measures taken to ensure compliance with the applicable requirements. This documentation includes https://www.access-board.gov/ict/#C203-electronic-content https://www.access-board.gov/ict/#C204-hardware https://www.access-board.gov/ict/#C205-software https://www.access-board.gov/ict/#C206-documentation-services but is not limited to testing records, product demonstrations, and reported defects by end users and testers.

• Prior to acceptance, the vendor or contractor shall provide an Accessibility Conformance Report (ACR) for each ICT item that is developed, updated, and/or configured for the agency, and when product substitutions are offered. The ACR should be based on the latest version of the Voluntary Product Accessibility Template (VPAT) provided by the Information Technology Industry Council (ITI). To be considered for award, an ACR must be submitted for each ICT item, and must be completed according to the instructions provided by the ITI.

Note: A supplemental ACR may be required if the agency has additional or stricter accessibility requirements than what is outlined in the VPAT.

• Prior to acceptance, the agency reserves the right to require a full working demonstration of the completed ICT item to demonstrate conformance to the agency’s accessibility requirements in addition to independent testing to validate.

• In the case of non-compliance where the vendor or contractor claims its products and/or services satisfy the applicable Revised Section 508 standards specified in the contract vehicle, the contracting officer will promptly inform the vendor or contractor in writing of the non-compliance. The vendor or contractor shall, at no cost to the agency, repair or replace the non-compliant products or services within the period specified by the contracting officer.

All Information and Communications Technology (ICT) subject to the Revised Section 508 standards will be evaluated for Section 508 conformance and usability. The test must be administered by the Federal Section 508 Testing Center. All maintenance for ICT that requires upgrades, modifications, installations, repairs, and purchases shall adhere to the Revised Section 508 standards.

12.0 Compliance with Internet Protocol Version (IPv6)

This contract involves the acquisition of Information Technology (IT) that uses Internet Protocol (IP) Technology. In order to comply with OMB Memorandum M-05-22, Transition Planning for Internet Protocol Version 6 (IPv6) issued on August 2, 2005, the contractor agrees that: (1) all deliverables that involve IT that uses IP (products, services, software, etc.) will comply with IPv6 standards set forth in the USGv6 Profile (NIST Special Publication 500-267) and interoperate with both IPv4 and IPv6 systems and products; and (2) it has IPv6 technical support for such deliverables. If the contractor plans to offer a deliverable that involves IT that is not compliant with these requirements, the contractor agrees to obtain the Contracting Officer’s approval before starting work on the deliverable.

13.0 Protection of Information

Information about USDA networks and/or the security posture of any USDA information assets gathered or created under this SOW is sensitive but unclassified information. It is anticipated that this information will be gathered, https://www.section508.gov/sell/vpat http://www.itic.org/policy/accessibility http://www.itic.org/policy/accessibility created, and stored within the primary Government work location. If contractor personnel must remove any information from the primary work area for any reason, the information must always remain in the possession of the contractor or locked in a secure location. If contractor personnel are away from primary work area for any reason, they must secure any hardcopy information by storing the information in a locked shelf or drawer and or use a password protected screen saver if the information is on a computer. Prior approval must be obtained if visitors must remove any materials from their work area.

1.0 Introduction
2.0 Scope
3.0 Period of Performance
4.0 Tasks
5.0 Deliverables
Due By
Submitted To
Deliverable
Two weeks after award of contract
PA Project Manager and COR
Project Management Plan
Two weeks after award of contract
PA Project Manager and COR
Project Schedule
Two weeks after award of contract
PA Project Manager and COR
Project Risks
6.0 Coordination of Work
7.0 Facility Security Requirements
8.0 Place of Performance
9.0 Government Supplied Resources
10.0 Information Sensitivity
11.0 Section 508 – Accessibility of Electronic and Information Technology
Section 508 Compliance
12.0 Compliance with Internet Protocol Version (IPv6)
13.0 Protection of Information

File details come from the government source that posted it. Updated .