This document is an Attachment 1 - Scope of Work for a solicitation to renovate the second floor kitchen at the U.S. Embassy Residence in Strasbourg, France. The work includes demolition of the existing kitchen, installation of new electrical, plumbing, flooring, cabinetry, countertops, appliances, and lighting. The contractor must comply with U.S. Army Corps of Engineers safety requirements, OSHA standards, and local French regulations. The period of performance is 30 days after contract award. The solicitation number is 19FR6324Q0042. Offers are due via email to ParisContracting@state.gov. The government intends to award a fixed-price contract to the lowest priced, technically acceptable offeror registered in SAM.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1- SCOPE OF WORK

19FR6324Q0042

Second Floor Kitchen Renovation in Strasbourg CGR R3 - April 16, 2024

1 | P a g e 1 1

I – General

The US Embassy, Paris-France (USG) requires the 2nd floor kitchen renovation at CGR in U.S.

Government Property located in Strasbourg. The works shall be done as per drawings, scope of work, specifications and general contract conditions. This project requires an experienced contractor to execute the works.

The Contractor shall provide all labor, material, tools, equipment, supervision and other related items required to complete the works as per scope of work, specifications and attached drawings. Contractors are advised to visit the site and verify the existing site conditions to develop their proposal.

Prior to any work, the Contractor shall submit for approval all detailed drawings and products data requested by the Contracting Officer Representative (COR).

For all kind of work, a “Safety and health protection plan” or “PP SPS – Plan particulier de sécurité et de protection de la santé” shall be provided.

The working hours shall be from 8:00 to 12:00 and from 13:00 to 17:00 Monday to Friday.

During American and French holidays, the U.S. Government Property shall be closed. The U.S.

Government Property shall be occupied during the works and the contractor shall take all necessary measures to avoid disturbances and nuisances to occupants.

All work shall comply with all applicable French and European building regulations.

All work shall be performed in accordance with:

A. The safety requirements of the EM-385-1-1 http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/ EM_385-1-1.pdf;

B. The safety requirements within the Occupational Safety and Health Standards https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level =1&p_part_number=1910;

C. Local French occupational safety and health requirement laws and regulations;

D. When there is a difference with the minimum requirements the more stringent requirement shall be followed.

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=1910 https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=1910

2 | P a g e 1 1

II – Demolition

The Contractor shall:

➢ Furnish and install all plastic protections needed in order to protect floors and avoid dust dispersion.

Note: before starting the contractor shall present a drawing showing the work site installation and all products used, for COR’s approval

➢ Turn off the circuit breakers for the kitchen respecting LOTO procedure.

➢ Remove all appliances and store properly

Note: appliances shall be removed from storage by Embassy

➢ Remove sink and faucet and dispose debris away from Property.

➢ Remove the countertop and dispose debris away from Property.

➢ Remove all kitchen cabinets and dispose debris away from Property.

➢ Remove the existing baseboards in kitchen and dispose debris away from Property.

➢ Remove the stainless-steel panel on wall and dispose debris away from Property

➢ Remove ceramic tiles from wall and dispose debris away from Property.

➢ Demolish the wall between sink and window, including ceramic tiles and dispose debris away from Property.

➢ Remove the existing floor covering in the kitchen and dispose debris away from

Property.

➢ Remove light fixtures and dispose debris away from Property.

➢ Remove electrical wirings supplying kitchen and dispose debris away from Property.

Note: Debris shall be disposed away appropriately according to French regulations. The Contractor shall provide a certificate or declaration of disposal to the COR.

III – Renovation work

The Contractor shall:

➢ Furnish and install wirings above new drop ceiling for new light fixtures including holes, switches and outlets.

Note: all wirings shall be recessed in walls/ceiling

➢ Furnish and install supply pipes and drainage for the kitchen.

Note: all pipes shall be recessed in walls and drop ceiling

➢ Repair walls.

➢ Furnish and install a drop ceiling in the kitchen (-15cm from existing ceiling) in sheetrock panel.

➢ Prepare the ceiling for painting.

3 | P a g e 1 1

➢ Furnish and apply 2 coats of white satin acrylic paint on ceiling - RAL 9016, Tollens brand OR EQUAL.

➢ Furnish and apply a leveling coat type Weberfloor 4032 from Weber & Broutin OR

EQUAL.

➢ Furnish and install floor ceramic tiles in the kitchen, Naturalia beige RT Ref MF6Y, 60x60cm from Marazzi OR EQUAL.

Note: The thickness of joint shall be 2-mm For doors, the Contractor shall furnish and install threshold type RENO –EAV, AEVT 100B20 from Schulter systems OR EQUAL.

For glue, the contractor shall use Weberprimo from Weber & Broutin OR EQUAL.

For joint, the Contractor shall use Weber joint from Weber & Broutin OR EQUAL.

➢ Furnish and install baseboards, model Naturalia beige RT from Marazzi OR EQUAL.

Note: The thickness of joint shall be 2-mm For glue, the contractor shall use Weberprimo from Weber & Broutin OR EQUAL.

For joint, the Contractor shall use Weber joint from Weber & Broutin OR EQUAL.

➢ Prepare walls for painting.

➢ Furnish and apply 2 coats of white satin acrylic paint on walls – RAL 9001, Tollens brand OR EQUAL.

➢ Furnish and install kitchen cabinets (except kitchen cabinet N.5 from Leroy Merlin OR

EQUAL), model Breval Brillant, face frames and drawers’ fronts from Howdens OR

EQUAL.

Note n1: All visible faces shall be of the same material as the furniture facades.

Note n2: color shall be selected by COR.

➢ Furnish and install a countertop, type Quartz Paillete from Howdens OR EQUAL.

Note: the color shall be selected by COR Before installation, the countertop shall be prepared in order to install the sink, hob, retractable outlets.

➢ Furnish and install the countertop type Quartz Paillete from Howdens OR EQUAL between the sink and window including the drainage grille.

➢ Furnish and install the backsplash type Quartz (46-cm high) from Howdens OR

EQUAL

Note: the color shall be selected by COR As the wirings are recessed in walls, outlets shall be recessed in backsplash.

➢ Furnish and install light fixtures, Model Obico IP65 Ref 0005363 from Sylvania OR EQUAL, in the drop ceiling.

➢ Furnish and install switches model Celiane from Legrand OR EQUAL.

➢ Furnish and install all outlets, types Celiane from Legrand OR EQUAL

Note: All outlets shall be connected to circuit breakers 10mA, furnished and installed by the contractor in electrical panel

➢ Furnish and install a sink in kitchen model Box Bxx220/120-34-34, stainless steel, from Franke OR EQUAL

➢ Furnish and install a faucet for kitchen model Eurocube Ref. 31395000 from Grohe

OR EQUAL

4 | P a g e 1 1

Note: the faucet shall be connected to the cut off valves with stainless steel flexible hoses

➢ Furnish and install a dishwasher model SN65ZX12CE from Siemens OR EQUAL

➢ Connect the dishwasher to the cut off valve and drainage

➢ Furnish and install a hood, model Plane Top Ilot 90 Ref 3567729 from Falmec OR

EQUAL.

➢ Connect the hood to the outlet.

Note: the outlet shall be hidden by the stainless-steel cladding

➢ Furnish and install a hob model EX63RBEB6E from Siemens OR EQUAL.

➢ Connect the hob to the outlet.

➢ Furnish and install a microwave model CF634AG31IQ700 from Siemens OR EQUAL.

➢ Connect the microwave.

➢ Furnish and install a fridge/freezer model BRB26602FWW from Samsung OR EQUAL.

➢ Connect the fridge.

➢ Furnish and install an oven model CM724 G1B1 from Siemens OR EQUAL

➢ Connect the oven.

➢ Furnish and install two retractable outlets in countertop (3outlets + 2 USB)

➢ Prepare and paint doors kitchen sides

➢ Prepare and paint radiator.

➢ Turn on circuit breakers.

➢ Turn on water supply valves.

➢ Remove temporary protections.

➢ Clean

III- Period of performance

The contractor shall submit a detailed schedule 15 (fifteen) calendar days after contract is awarded.

The contractor shall start the works 30 (thirty) calendar days after contract is awarded.

The contractor shall complete the works within 30 (thirty) calendar days after the work has started.

5 | P a g e 1 1

IV- List of kitchen cabinets

V- Drawings ref Q low cabinet wall mounted cabinet column size in mm comments manufacturer

1 1 x 890x500x575 2 drawers (casserolier) Howdens OR EQUAL

2 1 x 890x500x575 4 drawers (casserolier) Howdens OR EQUAL

3 1 x 890x150x575 1 sliding door/2 shelves Howdens OR EQUAL

4 1 x 890x600x575 1 door / 2 shelves Howdens OR EQUAL

5 1 1338x600x350 1 rolling door / shelves Leroy merlin OR EQUAL

REF 86137205

6 1 x 890x1000x575 2 doors/1shelf/1 drawer (code Kit) Howdens OR EQUAL

7 1 x 2292x600x575 1 sliding door /5 drawers Howdens OR EQUAL

8 1 x x 2292x600x575 2 sliding door /5 drawers Howdens OR EQUAL

9 1 x 890x600x290 1 door/2 shelves Howdens OR EQUAL

10 1 x 890x 500x290 4 drawers Howdens OR EQUAL

11 2 x 890x15x290 range bouteilles Howdens OR EQUAL

12 1 x 890x450x290 1 door / 2 shelves Howdens OR EQUAL

13 1 x 890x600x290 2 drawers Howdens OR EQUAL

14 1 x 890x500x290 1 door/ 2 shelves Howdens OR EQUAL

15 1 x 2292x600x575 for oven and micro wave Howdens OR EQUAL

16 1 x 2292x600x575 for fridge Howdens OR EQUAL

19 1 x 2292x600x575 1 door Howdens OR EQUAL panel to hide dishwasher radiator window window

DW

Wave

Fridge

Freezer

Micro

Oven x2

A B C

Page 6/ 11

Attachment 1- Scope of work General radiator window window

DW

x4 x2 s s s for hood

Page 7/ 11

Electrical oven micro wave

ELEVATION A

Page 8/ 11

ELEVATION B

DISH

WASHER

Page 9/ 11

ELEVATION C

Page 10/ 11

X

X s

Page 11/11

Attachment 1- Scope of work

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text low kitchen cabinet

AutoCAD SHX Text or column cabinet

AutoCAD SHX Text wall mounted cabinet

AutoCAD SHX Text outlet for appliances

AutoCAD SHX Text outlet above countertop

AutoCAD SHX Text outlet above baseboard

AutoCAD SHX Text switch

AutoCAD SHX Text recessed light fixture

AutoCAD SHX Text light fixture under wall mounted cabinet

AutoCAD SHX Text retractable outlets (x3 outlets +2xUSB)

Attachment 1- Scope of work - Second Floor Kitchen renovation Strasbourg 19FR6324Q0042 (1)
DRAWINGS
kitchen - 2nd floor CGR - Strasbourg- electrical
Sheets and Views
Model
kitchen - 2nd floor CGR - Strasbourg
Sheets and Views
Model
kitchen - 2nd floor CGR - Strasbourg-elevation A
Sheets and Views
Model
kitchen - 2nd floor CGR - Strasbourg-elevation B
Sheets and Views
Model
kitchen - 2nd floor CGR - Strasbourg-elevation C
Sheets and Views
Model
kitchen - 2nd floor CGR - Strasbourg-legend
Sheets and Views
Model

File details come from the government source that posted it. Updated .