Attachment_1_Scope_of_Work_140P8323Q0067.pdf

PDF 31 KB Posted

Attached to
Refinish Hardwood Flooring, MORA Federal contract opportunity
Solicitation number
140P8323Q0067
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document outlines the scope of work for refinishing the hardwood flooring at the Paradise Guide House located in Mount Rainier National Park. The project involves resanding and refinishing approximately 1,860 square feet of vertical grain fir flooring with an oil-based Swedish finish. The contractor will be responsible for preparing, sanding, and applying three coats of finish to the flooring, as well as disposing of waste materials and leaving the job site clean. All doors, casing and baseboard will remain in place. The contractor must supply all necessary materials, labor, tools and equipment to complete the project according to manufacturers' specifications. Working hours are flexible after issuance of a notice to proceed in order to fully complete the project, including cleanup.

View the file

Other files for this federal contract opportunity

Other files attached to Refinish Hardwood Flooring, MORA, newest first.
File Type Posted
Sol_140P8323Q0067_Amd_0001.pdf PDF
Attachment_3_Photos_140P8323Q0067.pdf PDF
Attachment_4_Paradise_Area_Map.pdf PDF
Attachment_2_Wage_Determination_Construction_Building_WA20230093.pdf PDF
Sol_140P8323Q0067.pdf PDF
Attachment_5_Forms_to_Return_with_Quote_140P8323Q0067.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation (RFQ) no. 140P8323Q0067 Refinish Hardwood Flooring

Attachment 1 Scope of Work Mount Rainier National Park (MORA)

MOUNT RAINIER NATIONAL PARK

SCOPE OF WORK

Refinish Paradise Guide House Floor

I. General Information:

The Guide House located at Paradise Washington in Mount Rainier National Park is located East of Ashford, Washington. This building will have approximately 1,860 square feet of vertical grain Fir flooring refinished. The existing flooring finish is in poor condition in areas requiring a complete sanding and refinish.

This project consists of resealing the floor with an oil based Swedish finish. The floor finishing consists of all preparation, sanding, applying three (3) coats of finish, disposing of any waste or materials offsite, and leaving the jobsite clean. The Contractor shall provide all tools, materials, equipment and labor required to perform the prescribed scope of work. Contractor shall be responsible to verify measurements. A site visit is recommended to evaluate the prescribed scope of work.

II. Work Requirements:

Contractor shall supply all materials and labor needed to complete the project complying with manufacturers specifications. Flooring will need to be prepped and coated with traditional

Swedish finish and final coat of Semi-Gloss. All doors, casing and baseboard will remain in place.

III. Supporting Information:

WORKING HOURS: The hours and days are flexible after issuance of a Notice to Proceed to complete the project, including clean-up of premises.