Attachment 1 - Schedule of Services USCGC ISAAC MAYO DS Repairs.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
DOCKSIDE: USCGC ISAAC MAYO DS FY26
Solicitation number
70Z08026QPBPL0005
Issued by

About this file

This document is a pricing schedule for a United States Coast Guard (USCG) ship repair contract for the USCGC ISAAC MAYO (WPC-1112) Dockside Availability in FY2026. The contract covers specific maintenance tasks including cleaning and inspecting the Gaylord Hood Ventilation System, resealing interior wet deck coverings, renewing the fuel filter manifold for the port main diesel engine, and renewing a stand-off pipe hanger. The period of performance is scheduled from 30 March 2026 to 27 April 2026, with the work to be executed at the cutter's home pier.

The pricing schedule includes detailed line items with job-based and hourly rates, with all current line items showing $0.00 pricing. The document also provides a comprehensive breakdown for potential over and above/growth work, including labor rates and a material markup/handling fee. The schedule includes provisions for additional labor hours and materials if scope changes, with a 15% assumed G&A factor and 10% profit factor. The document includes labor rate comparisons across multiple geographic locations, suggesting potential flexibility in labor cost calculations for the ship repair work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC ISAAC MAYO (WPC-1112) DOCKSIDE AVAILABILITY FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Gaylord Hood Ventilation System, Clean and InspectJOB1$0.00
D-002Interior Wet Deck Coverings, ResealJOB1$0.00
D-003Fuel Filter Manifold, Port Main Diesel Engine, RenewJOB1$0.00
D-004Stand-off Pipe Hanger, RenewJOB1$0.00
O-00AComposite Labor RateHour1$0.00
O-00BGFP ReportNSPEANSP
D-00CTravel and PerdiemJOB1$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
Over and Above/Growth Work
The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
OA/G-001**Provide breakdown, as follows:Hour15$0.00
Over and Above/Growth Labor Rate
Unit Price: $.00_; Quantity: 15 ; Unit of Issue: Hour; Extended Price: $____________
OA/G-002Over and Above/Growth Material Markup/Handling Fee$1,800.00%ERROR:#VALUE!
Unit Price: $1,800.00; Quantity:1 ; Unit of Issue: Percent ________%;
Extended Price: [$1,800.00 X percentage quoted]: $______________
Total Price for Over and Above/GrowthERROR:#VALUE!

(5/29/2025)

Rev-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .