Attachment 1- Schedule of Services CGC HAZARD DS Blank.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
USCGC OLIVER HENRY and USCGC MYRTLE HAZARD DOCKSIDE REPAIRS
Solicitation number
70Z08026QPBPL0032
Issued by

About this file

This is a pricing schedule template for dockside repairs and maintenance services for the USCGC MYRTLE HAZARD (WPC-1139) under a Statement of Services & Services (SOS&S) contract. The schedule establishes the framework for pricing definite items, option items, and open-and-inspect repair work.

The definite scope includes four job-based line items: MDE 8000-Hour Maintenance (QL3), underwater body cleaning and zinc anode renewal, travel and per diem, and GFP reporting. For open-and-inspect repairs, contractors must provide two pricing components that apply throughout the contract term: a labor rate (based on 1053 total hours available) and a material markup/handling fee. The template includes a cost estimate breakdown section with labor rate guidance by geographic location (ranging from $45 in New Orleans to $67 in San Francisco), allocation of labor by specialty (Engineering Technician, Machinist/Pipe Fitter, Electrician, Shipfitter, Welder, Firewatch, Insulator/Lagger, Painter, and General Labor), and assumed G&A (15%) and profit (10%) factors. All pricing fields are currently blank at $0.00, indicating this is a blank submission template for contractors to complete with their proposed pricing. The document is dated Rev 0 06/24/2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:Attachment 1
USCGC MYRTLE HAZARD (WPC-1139) DOCKSIDE AVAILABILITY FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001MDE, 8000 Hour Maintenance (QL3), PerformJOB1
D-002U/W Body (Waterborne), Clean and Inspect, Renew Zinc AnodesJOB1
D-003Travel and PerdiemJOB1
D-00BGFP ReportNSPEANSP
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
Open and Inspect Repairs
The Labor Rates and Material Markup/Handling Fee will be used throughout the life of the contract for all open and inspect repair items. The total extended price for both CLINs below are being used solely for the purposes of evaluating price.
OA/G-001**Provide breakdown, as follows: Labor Rate

Unit Price: $________; Quantity: 1053 ; Unit of Issue: Hour; Extended Price: $____________ Sorrell, Latoya N CIV DHS (USA): Contractors will enter labor rate here.

Hour1053$0.00
OA/G-002Material Markup/Handling Fee

Unit Price: $42,900.00; Quantity: 1; Unit of Issue: Percent ________%;

Extended Price: [$42,900.00 X percentage quoted]: $______________ $42,900.00 % Sorrell, Latoya N CIV DHS (USA): Contractors will enter material markup/handling fee here.

$0.00 Sorrell, Latoya N CIV DHS (USA): Do Not Change this cell.

Total Price for Over and Above/Growth $0.00

Rev 0 06/24/2025

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .