This is a pricing schedule template for aviation maintenance services on the USCGC BEAR (WMEC-270A) during dockside availability in FY2027. The contractor must provide labor, materials, equipment, and facilities to perform all required maintenance work aboard the vessel during the period of performance from January 5, 2027 through February 3, 2027.
The schedule includes thirteen definite line items and one optional line item covering specific aviation maintenance tasks, including fuel tank servicing and inspection, helicopter power supply load testing, windspeed transmitter removal and reinstallation, helicopter tie-down fitting renewal, and anchor windlass installation and testing. The pricing structure includes a composite labor rate (in hours), a Government Furnished Property (GFP) report, and travel and per diem costs. Additionally, the contractor must establish a labor rate and material markup/handling fee percentage to be applied throughout the contract life for open and inspect repairs, with a fixed-price ceiling of $0.00 currently shown. The total contract value will be calculated based on the contractor's unit prices submitted for all definite items, optional items, and the open and inspect repair categories. All pricing must be entered in the yellow-labeled boxes of the schedule template.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | CONTRACTOR'S NAME | ||||
| USCGC BEAR (WMEC-270A) DOCKSIDE AVAILABILITY FY2027 | |||||
| The contractor shall fill-in all yellow labeled boxes | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Tanks, Aviation Fuel Service, Clean And Inspect | JOB | 1 | ||
| D-002 | 28 Volt DC Helo Power Supply, Load Test | JOB | 1 | ||
| D-003 | 400 Hz Power Supply (FCX Systems Inc), Load Test | JOB | 1 | ||
| D-004 | Windspeed Transmitter, Anemometer, Remove and Reinstall | JOB | 1 | ||
| D-005 | Helo Talon Grids, Inspect and Test | JOB | 1 | ||
| O-006 | Tanks, Aviation Fuel Service, Preserve, Partial (Optional) | JOB | 1 | ||
| D-007 | Decks, Helicopter Operating Areas, Preserve | JOB | 1 | ||
| D-008 | Flow Meter (Aviation Fuel), Replace | JOB | 1 | ||
| D-009 | Helicopter Tie-Down Fittings, Renew | JOB | 1 | ||
| D-010 | Anchor Windlass Flange Installation and Static Load Test | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 1 | ||
| D-00B | GFP Report | NSP | EA | ||
| D-00C | Travel and Perdiem | JOB | |||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items | |||||
| Open and Inspect Repairs | |||||
| The Labor Rates and Material Markup/Handling Fee will be used throughout the life of the contract for all open and inspect repair items. Open and inspect related repairs will be incorporated via contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| OIR-001 | **Provide breakdown, as follows: |
Labor Rate
| Unit Price: $________; Quantity: 429; Unit of Issue: Hour; Extended Price: $____________ | Hour | 429 | $0.00 | |
| OIR-002 | Material Markup/Handling Fee |
Unit Price: $16,536.00; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [$16,536.00 X percentage quoted]: $______________ | $16,536.00 | Percent | $0.00 | |
| Total Fixed Price Ceiling of Open and Inspect Repairs | $0.00 | |||
| Total Contract Value | $0.00 |