Amendment 70Z08026QMECP00250003.pdf

PDF 669 KB Posted

Attached to
DOCKSIDE (DS): CGC BEAR AA FY27
Solicitation number
70Z08026QMECP0025
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued on August 3, 2026 for solicitation 70Z08026QMECP0025, administered by the same office that issued the original solicitation. The amendment's closing date remains August 18, 2026 at 10:00 AM EDT, and it is not extended. The primary purpose of this amendment is to update the Evaluation Factors under FAR clause 52.212-2 (Evaluation-Commercial Products and Commercial Services, AUG 2025, Deviation 25-21).

The amended evaluation criteria establish a best-value approach prioritizing Technical Capability, Experience, and Past Performance significantly more than price. Technical Capability evaluation encompasses demonstrated ability to meet specification requirements, project planning, quality control, coating plans for preservation requirements, qualified technical representative capability, subcontract management, cleaning and flushing methods, and welding documents per SFLC Standard Specification 0740; quotes not addressing all technical requirements will be deemed unacceptable. Experience evaluation focuses on quoter experience with DOD or USCG surface vessels and workforce capability; quotes not meeting experience requirements will be deemed unacceptable. Past Performance will be evaluated using references, USCG contract history, and CPARS data within the last three years; ratings below satisfactory will not be considered for award, while contractors without relevant history receive neutral ratings. Price evaluation assesses Total Evaluated Price reasonableness; significantly unbalanced CLIN prices, blank unit prices, or non-dollar figure annotations render quotes unacceptable. Award may be made to other than the lowest-priced quote or highest non-price rated quote based on best-value tradeoff analysis, with price becoming the controlling factor only when competing quotes are substantially equal in technical capability and past performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

ALISSA GAVALIAN / CONTRACTING OFFICER

70Z08026QMECP00250003

Summary of Changes

Section III: Contract Clauses

The following clauses are modified:

Section V: Solicitation Provisions

The following clauses are modified:

Clauses incorporated by full text

52.212-2 EVALUATION-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (AUG 2025) (DEVIATION

25-21) - TAILORED

(a) Evaluation factors. The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers:

Technical Capability: The Government will evaluate each quoter's demonstrated capability to provide a sound, compliant approach that meets all the requirements listed in the Specification and demonstrates a thorough knowledge and understanding of the requirements. The Government will evaluate each quoter's project planning document. The Government will evaluate each quoter's approach to quality control. The Government will evaluate each quoter's coating plan and strategy demonstrating their ability to successfully meet the preservation requirements in the specification. The Government will evaluate quoters' ability to meet qualified technical representative requirements cited on paragraph 3.1.2 in the work items in the specification. The Government will evaluate each quoter's subcontract management plan. The Government will evaluate each quoter's cleaning and flushing methods for the systems outlined in the specification. The Government will evaluate each quoter's welding documents in accordance with SFLC Standard Specification 0740. It is the quoter's responsibility to ensure that their quote clearly addresses and demonstrates their ability to perform these requirements. Any quote that does not meet or address all Technical Capability submission requirements will be deemed unacceptable and may not be considered for award.

Experience: The Government will evaluate each quoter's experience completing work on DOD or USCG surface vessels and their workforce capability and capacity to perform the requirements. Any quote that does not meet or address all experience submission requirements will be deemed unacceptable and may not be considered for award.

Past Performance: The Government may utilize any references provided by the quoter, along with information available from past contracts/orders with the USCG and any information found using sources such as Contractor Performance Assessment Reporting System (CPARS) to determine the contractor's past performance within the last three (3) years. The Government reserves the right to limit or expand the number of references it decides to contact and to contact references other than those provided by the quoter. Past performance less than satisfactory may not be considered for award. If a quoter does not have a history of relevant contract performance, or if past performance information is not available, the quoter will not be evaluated favorably or unfavorably but will receive a neutral past performance rating.

Price: The Government will evaluate the quoter's Total Evaluated Price (TEP) for reasonableness. A quoter's TEP shall be the sum of all CLINs within the submitted Price Schedule. The Government may determine that a quote is unacceptable if the CLIN prices are significantly unbalanced. Unit prices left blank or annotated with something other than a U.S. dollar figure will be considered unacceptable and the Government reserves the right to reject the quote without any further consideration.

In performing the best value tradeoff, technical capability, experience, and past performance, when combined, are significantly more important than price. Although price is not the controlling factor in award, it is an important factor. As the evaluation ratings of competing quotes under the non-price factors become closer to equivalent, price becomes more important. If competing quotes are substantially equal in technical capability and past performance, price may be the controlling factor in award. Award

70Z08026QMECP00250003

may be made to other than the lowest priced quote (based on the results of the tradeoff analysis between non-price and price factors) or to other than the highest non-price rated quote if determined to be in the best interest of the Government.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. The evaluation of options does not obligate the Government to exercise the option(s).

(c) Notice of award. A written notice of award or acceptance of an offer furnished to the successful Offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

End of Addendum to FAR Provision 52.212-2

Text52:
Text54: 1
TOTAL_NO_OF_PAGES: 3
CUST_PROJ_CODE:
DOCUMENT_NUMBER: 70Z08026QMECP00250003
EFFECTIVE_DATE: 2026-08-03T08:05:10.000-04:00
REF_PR_NUM_T: 52000PR260025157
SOL_DOCUMENT_NUMBER: 70Z08026QMECP0025
SOL_OPEN_BID_DATE: 2026-08-03T08:04:42.000-04:00
NO_OF_COPIES: 1
Check Box91: Yes
Check Box92: Off
MANUAL_EXTEND_FLAG: N
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Text1: AMENDMENT CONTROL NUMBER :
HDR_DOCUMENT_NUMBER: 70Z08026QMECP0025
Text134: SUMMARY OF CHANGES :
AMENDMENT_DESCRIPTION: AMEND-The purpose of this amendment is to update the Evaluation Factors (52.212-2 EVALUATION-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (AUG 2025) (DEVIATION 25-21) - TAILORED)

2. The closing date for this solicitation remains the same of August 18, 2026, at 10:00 AM EDT.

3. All other terms and conditions of this solicitation remains unchanged.

Text2: Same As Issuing Office
AMD_ISSUING_OFFICE_LADDR:
AMD_ISSUING_OFFICE_LOCCODE:
2026-08-03T08:46:51-0400
GAVALIAN.ALISSA.GRETA.1299855070

File details come from the government source that posted it. Updated .