Attachment 1_Schedule of Services_Blank Price Schedule.xls

XLS spreadsheet 47 KB Posted

Attached to
DOCKSIDE(DS): USCGC SENECA AA FY26
Solicitation number
70Z08026QMECP0004
Issued by

About this file

This document is a Price Schedule for a U.S. Coast Guard dockside availability project for the USCGC SENECA (WMEC-270B) scheduled for FY2026. The schedule outlines multiple definitive and optional service items including aviation fuel tank cleaning, power supply load testing, helicopter deck preservation, deck plating renewal, and associated labor and travel costs. The pricing document includes detailed line items with unit prices and quantities for specific maritime maintenance tasks.

The solicitation is issued by the Department of Homeland Security U.S. Coast Guard, with the primary point of contact being Caroline Greer. The price schedule includes provisions for potential over and above/growth work, with a labor rate for 474 hours and a material markup/handling fee of $18,271.00. The document appears to be a draft version dated 5/27/2025, providing a comprehensive breakdown of estimated service costs for the vessel's dockside maintenance and repair activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

GOVERNMENT ESTIMATE FOR:
USCGC SENECA (WMEC-270B) DOCKSIDE AVAILABILITY FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Tanks, Aviation Fuel Service, Clean And InspectJOB1
D-00228 Volt DC Helo Power Supply, Load TestJOB1
D-003400 Hz Power Supply (FCX Systems Inc), Load TestJOB1
D-004Windspeed Transmitter, Anemometer, Remove and ReinstallJOB1
D-005Flow Meter (Aviation Fuel), CalibrateJOB1
D-006Helo Talon Grids, Inspect and TestJOB1
D-007Decks, Helicopter Operating Areas, PreserveJOB1
D-008Deck Plating, RenewJOB1
O-009Tanks, Aviation Fuel Service, Preserve, Partial, OPTIONALJOB1
D-010Flight Deck Roller Bars, RenewJOB1
O-00AComposite Labor RateHour1
D-00BGFP ReportNSPEANSP
D-00CTravel and PerdiemJOB
O-00ZLaydays$0.00Day5$0.00
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
Over and Above/Growth Work
The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price.
**Fill in the section highlighted below**
OA/G-001Over and Above/Growth Labor RateHour474
OA/G-002Over and Above/Growth Material Markup/Handling Fee$18,271.00Percent

&C(5/27/2025) Draft-0 - Page &P of &N