Attachment 1 Schedule of Services Blank Price Schedule.xls
XLS spreadsheet 47 KB Posted
- Attached to
- DOCKSIDE: CGC THETIS DS FY25 Federal contract opportunity
- Solicitation number
- 70Z08025QMECP0010
About this file
This is a pricing schedule template for dockside availability repairs and maintenance work on the USCGC THETIS (WMEC-270B) for FY2025. The schedule lists 42 definite work items (D-prefix) and 6 optional items (O-prefix) including cleaning and inspection of various tanks (fuel, water, ballast, waste), void spaces, and chain lockers; renewal of flexible couplings and sewage piping; overhaul of anchor windlass and warping capstan; commercial cleaning of ventilation ducts; and provision of temporary services. The schedule also includes provisions for Over and Above/Growth work with spaces to input labor rates and material markup fees, with an estimated 1,631 labor hours and $62,910 in materials. The template requires bidders to provide unit prices and extended prices for each line item, with separate subtotals for definite items, optional items, and Over and Above/Growth work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT 70Z08025QMECP00100001.pdf | ||
| Combined Synopsis Solicitation THETIS DS FY24 70Z08025QMECP0010.pdf | ||
| Attachment 2 Statement of Work Specification.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC THETIS (WMEC-270B) DOCKSIDE AVAILABILITY FY2025 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Chain Lockers, Clean and Inspect | JOB | 1 | ||
| D-002 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | JOB | 1 | ||
| D-003 | Tanks, MP Fuel Service, Clean and Inspect | JOB | 1 | ||
| D-004 | Tanks, Potable Water, Clean and Inspect | JOB | 1 | ||
| D-005 | Tanks, Ballast, Clean and Inspect | JOB | 1 | ||
| D-006 | Voids, Accessible, Clean and Inspect | JOB | 1 | ||
| D-007 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | 1 | ||
| D-008 | Flexible Couplings, Renew | JOB | 1 | ||
| D-009 | Propulsion Shafting, Strain Gauge Alignment, Dockside, Check | JOB | 1 | ||
| D-010 | Seawater Heat Exchangers, Clean, Inspect And Hydro | JOB | 1 | ||
| D-011 | Circuit Breakers (400 HZ), Inspect and Test | JOB | 1 | ||
| D-012 | Vent Ducts, Engine And Motor Room, All, Commercial Cleaning | JOB | 1 | ||
| D-013 | Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning | JOB | 1 | ||
| D-014 | Vent Ducts, Laundry Exhaust, Commercial Cleaning | JOB | 1 | ||
| D-015 | Vent Ducts, All Other, Commercial Cleaning | JOB | 1 | ||
| D-016 | Chill Water System, Clean and Flush | JOB | 1 | ||
| D-017 | Potable Water Pneumatic Tanks, Clean and Inspect | JOB | 1 | ||
| D-018 | Hot Water Accumulator Tanks, Clean and Inspect | JOB | 1 | ||
| D-019 | Commissary Hoist, Inspect and Service | JOB | 1 | ||
| D-020 | Anchor Chains and Ground Tackle, Inspect and Repair | JOB | 1 | ||
| D-021 | Anchor Windlass, Overhaul | JOB | 1 | ||
| D-022 | Towing Bitts, Chocks, and Fairleads; Inspect and Test | JOB | 1 | ||
| D-023 | Warping Capstan, Overhaul | JOB | 1 | ||
| D-024 | Appleton FB 20-21 Single Point Davit (SPD), Inspect and Service | JOB | 1 | ||
| D-025 | Sewage Discharge and Transfer Pumps, Renew | JOB | 1 | ||
| D-026 | Grey Water Holding Tanks, Clean and Inspect | JOB | 1 | ||
| D-027 | Sewage Holding Tanks, Clean and Inspect | JOB | 1 | ||
| D-028 | Sewage Piping, Clean and Flush | JOB | 1 | ||
| O-029 | Tanks, Grey Water Holding, Preserve, Partial (Optional) | JOB | 1 | ||
| O-030 | Tanks (Sewage Holding), Preserve, Partial (Optional) | JOB | 1 | ||
| O-031 | Tanks, Ballast, Preserve, Partial (Optional) | JOB | 1 | ||
| O-032 | Chain Lockers, Preserve, Partial (Optional) | JOB | 1 | ||
| O-033 | Tanks, Dirty Oil and Waste, Preserve, Partial (Optional) | JOB | 1 | ||
| O-034 | Tanks, Potable Water, Preserve, Partial (Optional) | JOB | 1 | ||
| D-035 | Temporary Services, Provide - Cutter | JOB | 1 | ||
| D-036 | Temporary Services, Heating and Cooling | JOB | 1 | ||
| D-037 | Flight Deck Safety Net Assemblies, Replace | JOB | 1 | ||
| D-038 | Sewage Piping, Renew | JOB | 1 | ||
| D-039 | Detacouple, Renew | JOB | 1 | ||
| D-040 | Deck Connection Risers, Renew | JOB | 1 | ||
| D-041 | Aux Machinery Space Deck, Repair | JOB | 1 | ||
| D-042 | Engine Room Ventilation Ducts, Renew | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | |||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | |||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items | |||||
| Over and Above/Growth Work | |||||
| The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| **Fill in the sections highlighted below: | |||||
| OA/G-001 | Over and Above/Growth Labor Rate | Hour | 1631 | $0.00 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $62,910.00 | Percent | $0.00 | |
| Total Evaluated Price of Over and Above/Growth | $0.00 |
&C(12/27/2024) Draft-00 - Page &P of &N
File details come from the government source that posted it. Updated .