Attachment 1 Schedule of Items_Price Sheet_1240BD26Q0030.xlsx
XLSX spreadsheet 33 KB Posted
- Solicitation number
- 1240BD26Q0030
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items/Price Sheet for vault pumping services at multiple recreation sites within the Cle Elum Ranger District of the Okanogan-Wenatchee National Forest. The solicitation (1240BD26Q0030) is for a Firm-Fixed-Price Requirements Contract with an anticipated start date of May 1, 2026, covering a one-year base period (May 1, 2026 – April 30, 2027) with four one-year option periods, for a total potential contract duration of five years. The contractor must provide all labor, equipment, supervision, transportation, operating supplies, and incidentals necessary to pump, recharge, and dispose of waste from vault toilets and septic tanks at 36 locations across the Cle Elum Ranger District.
Pricing must be submitted as a fixed rate per vault for each location, with all fuel and mobilization costs included in the unit price. Payment is based on actual services performed; while most sites require pumping one to two times annually, frequency varies based on use, with some sites requiring service up to four times per year and others potentially requiring no service in a given year. The price sheet includes 26 line items for the base period and corresponding items for each of four option periods, with all pricing currently listed at $0 pending contractor submission. The government reserves the right to request partial pumps at 60 percent of the listed unit price if a vault is less than 50 percent full at time of service. Estimated service dates are May 1 through October 31 of each contract year.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 Performance Work Statement 1240BD26Q0030.pdf | ||
| RFQ_CSS_CERD Vault_1240BD26Q0030.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Items (Price Sheet)
| Pricing must be a fixed rate per vault for each location and must include all fuel and mobilization costs. Total Location Price would be the total price to pump all units at that location. Payment will be based on actual services performed. While many sites are pumped 1–2 times per year, actual frequency will vary based on use; a few sites may require service up to 4 times annually, while others may not require service at all in a given year. | ||||||
| Company Name: | UEI: | |||||
| Point of Contact: | Phone: | |||||
| Physical Address: | Email: | |||||
| EXHIBIT A- BASE PERIOD (01 May 2026 - 30 April 2027) ( Estimated Service Dates 01 May 2026 - 31 October 2026) | ||||||
| Item Number | Location / Site Description | Qty of Vaults | Vault Capacity (gallons) | Miles From Cle Elum | Unit Price Per Vault | Total Location Price |
| 0001 | Speelyi Beach | 2 | 1000 | 7 | $0 | $ - 0 |
| 0002 | Salmon la Sac Guard Station | 1 | 1000 | 13 | $0 | $ - 0 |
| 0003 | Salmon la Sac Trailhead | 1 | 1000 | 13 | $0 | $ - 0 |
| 0004 | Scatter Creek Trailhead | 1 | 1000 | 29 | $0 | $ - 0 |
| 0005 | Tuquala Meadows/Hyas Trailhead | 2 | 1000 | 31 | $0 | $ - 0 |
| 0006 | Pete Lake Horse Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 0007 | Pete Lake Hiker Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 0008 | Keechelus Lake Boat Launch | 1 | 1000 | 30 | $0 | $ - 0 |
| 0009 | Rachel Lake Trailhead | 2 | 750 | 30 | $0 | $ - 0 |
| 0010 | East Kachess Group Site | 2 | 1000 | 19 | $0 | $ - 0 |
| 0011 | Stampede Pass Trailhead | 1 | 1000 | 20 | $0 | $ - 0 |
| 0012 | Lion Rock | 1 | 1000 | 38 | $0 | $ - 0 |
| 0013 | Ken Wilcox Horse Camp | 1 | 1000 | 35 | $0 | $ - 0 |
| 0013A | Ken Wilcox Horse Camp | 2 | 500 | 35 | $0 | $ - 0 |
| 0014 | Swauk Discovery Trailhead | 1 | 1000 | 27 | $0 | $ - 0 |
| 0015 | Red Top Trailhead | 1 | 1000 | 25 | $0 | $ - 0 |
| 0016 | Taneum Junction Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 0017 | Manastash Campground | 4 | 1000 | 37 | $0 | $ - 0 |
| 0018 | Manastash Trailhead | 1 | 1000 | 40 | $0 | $ - 0 |
| 0019 | Riders Camp Trailhead | 1 | 1000 | 38 | $0 | $ - 0 |
| 0020 | Shoestring Lake Trailhead | 1 | 1000 | 36 | $0 | $ - 0 |
| 0021 | Stafford Creek Trailhead | 1 | 1000 | 26 | $0 | $ - 0 |
| 0022 | Miller Bear Trailhead | 1 | 1000 | 27 | $0 | $ - 0 |
| 0023 | Teanaway Guard Station | 1 | 1000 | 24 | $0 | $ - 0 |
| 0024 | Beverly Campground | 2 | 500 | 26 | $0 | $ - 0 |
| 0025 | DeRoux Trailhead | 1 | 1000 | 30 | $0 | $ - 0 |
| 0026 | Esmerelda Trailhead | 1 | 1000 | 31 | $0 | $ - 0 |
| EVALUATED BASE PERIOD 2026 TOTAL | ||||||
| $ - 0 | ||||||
| ( Total Estimated Price is for evaluation purposes only; payment will be based on actual units serviced.) | ||||||
| In the event a vault is less than 50% full at the time of service, the Government reserves the right to request a 'Partial Pump' at a rate of 60% of the listed Unit Price." |
| EXHIBIT B- OPTION PERIOD 1 (01 May 2027 - 30 April 2028) ( Estimated Service Dates 01 May 2027 - 31 October 2027) | ||||||
| Item Number | Location / Site Description | Qty of Vaults | Vault Capacity (gallons) | Miles From Cle Elum | Unit Price Per Vault | Total Location Price |
| 1001 | Speelyi Beach | 2 | 1000 | 7 | $0 | $ - 0 |
| 1002 | Salmon la Sac Guard Station | 1 | 1000 | 13 | $0 | $ - 0 |
| 1003 | Salmon la Sac Trailhead | 1 | 1000 | 13 | $0 | $ - 0 |
| 1004 | Scatter Creek Trailhead | 1 | 1000 | 29 | $0 | $ - 0 |
| 1005 | Tuquala Meadows/Hyas Trailhead | 2 | 1000 | 31 | $0 | $ - 0 |
| 1006 | Pete Lake Horse Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 1007 | Pete Lake Hiker Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 1008 | Keechelus Lake Boat Launch | 1 | 1000 | 30 | $0 | $ - 0 |
| 1009 | Rachel Lake Trailhead | 2 | 750 | 30 | $0 | $ - 0 |
| 1010 | East Kachess Group Site | 2 | 1000 | 19 | $0 | $ - 0 |
| 1011 | Stampede Pass Trailhead | 1 | 1000 | 20 | $0 | $ - 0 |
| 1012 | Lion Rock | 1 | 1000 | 38 | $0 | $ - 0 |
| 1013 | Ken Wilcox Horse Camp | 1 | 1000 | 35 | $0 | $ - 0 |
| 1013A | Ken Wilcox Horse Camp | 2 | 500 | 35 | $0 | $ - 0 |
| 1014 | Swauk Discovery Trailhead | 1 | 1000 | 27 | $0 | $ - 0 |
| 1015 | Red Top Trailhead | 1 | 1000 | 25 | $0 | $ - 0 |
| 1016 | Taneum Junction Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 1017 | Manastash Campground | 4 | 1000 | 37 | $0 | $ - 0 |
| 1018 | Manastash Trailhead | 1 | 1000 | 40 | $0 | $ - 0 |
| 1019 | Riders Camp Trailhead | 1 | 1000 | 38 | $0 | $ - 0 |
| 1020 | Shoestring Lake Trailhead | 1 | 1000 | 36 | $0 | $ - 0 |
| 1021 | Stafford Creek Trailhead | 1 | 1000 | 26 | $0 | $ - 0 |
| 1022 | Miller Bear Trailhead | 1 | 1000 | 27 | $0 | $ - 0 |
| 1023 | Teanaway Guard Station | 1 | 1000 | 24 | $0 | $ - 0 |
| 1024 | Beverly Campground | 2 | 500 | 26 | $0 | $ - 0 |
| 1025 | DeRoux Trailhead | 1 | 1000 | 30 | $0 | $ - 0 |
| 1026 | Esmerelda Trailhead | 1 | 1000 | 31 | $0 | $ - 0 |
| EVALUATED OPTION PERIOD 1 2027 TOTAL | ||||||
| $ - 0 | ||||||
| ( Total Estimated Price is for evaluation purposes only; payment will be based on actual units serviced.) | ||||||
| In the event a vault is less than 50% full at the time of service, the Government reserves the right to request a 'Partial Pump at a rate of 60% of the listed Unit Price." |
| EXHIBIT C OPTION PERIOD 2 (01 May 2028 - 30 April 2029) ( Estimated Service Dates 01 May 2028 - 31 October 2028) | ||||||
| Item Number | Location / Site Description | Qty of Vaults | Vault Capacity (gallons) | Miles From Cle Elum | Unit Price Per Vault | Total Location Price |
| 2001 | Speelyi Beach | 2 | 1000 | 7 | $0 | $ - 0 |
| 2002 | Salmon la Sac Guard Station | 1 | 1000 | 13 | $0 | $ - 0 |
| 2003 | Salmon la Sac Trailhead | 1 | 1000 | 13 | $0 | $ - 0 |
| 2004 | Scatter Creek Trailhead | 1 | 1000 | 29 | $0 | $ - 0 |
| 2005 | Tuquala Meadows/Hyas Trailhead | 2 | 1000 | 31 | $0 | $ - 0 |
| 2006 | Pete Lake Horse Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 2007 | Pete Lake Hiker Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 2008 | Keechelus Lake Boat Launch | 1 | 1000 | 30 | $0 | $ - 0 |
| 2009 | Rachel Lake Trailhead | 2 | 750 | 30 | $0 | $ - 0 |
| 2010 | East Kachess Group Site | 2 | 1000 | 19 | $0 | $ - 0 |
| 2011 | Stampede Pass Trailhead | 1 | 1000 | 20 | $0 | $ - 0 |
| 2012 | Lion Rock | 1 | 1000 | 38 | $0 | $ - 0 |
| 2013 | Ken Wilcox Horse Camp | 1 | 1000 | 35 | $0 | $ - 0 |
| 2013A | Ken Wilcox Horse Camp | 2 | 500 | 35 | $0 | $ - 0 |
| 2014 | Swauk Discovery Trailhead | 1 | 1000 | 27 | $0 | $ - 0 |
| 2015 | Red Top Trailhead | 1 | 1000 | 25 | $0 | $ - 0 |
| 2016 | Taneum Junction Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 2017 | Manastash Campground | 4 | 1000 | 37 | $0 | $ - 0 |
| 2018 | Manastash Trailhead | 1 | 1000 | 40 | $0 | $ - 0 |
| 2019 | Riders Camp Trailhead | 1 | 1000 | 38 | $0 | $ - 0 |
| 2020 | Shoestring Lake Trailhead | 1 | 1000 | 36 | $0 | $ - 0 |
| 2021 | Stafford Creek Trailhead | 1 | 1000 | 26 | $0 | $ - 0 |
| 2022 | Miller Bear Trailhead | 1 | 1000 | 27 | $0 | $ - 0 |
| 2023 | Teanaway Guard Station | 1 | 1000 | 24 | $0 | $ - 0 |
| 2024 | Beverly Campground | 2 | 500 | 26 | $0 | $ - 0 |
| 2025 | DeRoux Trailhead | 1 | 1000 | 30 | $0 | $ - 0 |
| 2026 | Esmerelda Trailhead | 1 | 1000 | 31 | $0 | $ - 0 |
| EVALUATED OPTION PERIOD 2 2028 TOTAL | $ - 0 | |||||
| ( Total Estimated Price is for evaluation purposes only; payment will be based on actual units serviced.) | ||||||
| In the event a vault is less than 50% full at the time of service, the Government reserves the right to request a 'Partial Pump at a rate of 60% of the listed Unit Price." |
| EXHIBIT D OPTION PERIOD 3 (01 May 2029 - 30 April 2030) ( Estimated Service Dates 01 May 2029 - 31 October 2029) | ||||||
| Item Number | Location / Site Description | Qty of Vaults | Vault Capacity (gallons) | Miles From Cle Elum | Unit Price Per Vault | Total Location Price |
| 3001 | Speelyi Beach | 2 | 1000 | 7 | $0 | $ - 0 |
| 3002 | Salmon la Sac Guard Station | 1 | 1000 | 13 | $0 | $ - 0 |
| 3003 | Salmon la Sac Trailhead | 1 | 1000 | 13 | $0 | $ - 0 |
| 3004 | Scatter Creek Trailhead | 1 | 1000 | 29 | $0 | $ - 0 |
| 3005 | Tuquala Meadows/Hyas Trailhead | 2 | 1000 | 31 | $0 | $ - 0 |
| 3006 | Pete Lake Horse Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 3007 | Pete Lake Hiker Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 3008 | Keechelus Lake Boat Launch | 1 | 1000 | 30 | $0 | $ - 0 |
| 3009 | Rachel Lake Trailhead | 2 | 750 | 30 | $0 | $ - 0 |
| 3010 | East Kachess Group Site | 2 | 1000 | 19 | $0 | $ - 0 |
| 3011 | Stampede Pass Trailhead | 1 | 1000 | 20 | $0 | $ - 0 |
| 3012 | Lion Rock | 1 | 1000 | 38 | $0 | $ - 0 |
| 3013 | Ken Wilcox Horse Camp | 1 | 1000 | 35 | $0 | $ - 0 |
| 3013A | Ken Wilcox Horse Camp | 2 | 500 | 35 | $0 | $ - 0 |
| 3014 | Swauk Discovery Trailhead | 1 | 1000 | 27 | $0 | $ - 0 |
| 3015 | Red Top Trailhead | 1 | 1000 | 25 | $0 | $ - 0 |
| 3016 | Taneum Junction Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 3017 | Manastash Campground | 4 | 1000 | 37 | $0 | $ - 0 |
| 3018 | Manastash Trailhead | 1 | 1000 | 40 | $0 | $ - 0 |
| 3019 | Riders Camp Trailhead | 1 | 1000 | 38 | $0 | $ - 0 |
| 3020 | Shoestring Lake Trailhead | 1 | 1000 | 36 | $0 | $ - 0 |
| 3021 | Stafford Creek Trailhead | 1 | 1000 | 26 | $0 | $ - 0 |
| 3022 | Miller Bear Trailhead | 1 | 1000 | 27 | $0 | $ - 0 |
| 3023 | Teanaway Guard Station | 1 | 1000 | 24 | $0 | $ - 0 |
| 3024 | Beverly Campground | 2 | 500 | 26 | $0 | $ - 0 |
| 3025 | DeRoux Trailhead | 1 | 1000 | 30 | $0 | $ - 0 |
| 3026 | Esmerelda Trailhead | 1 | 1000 | 31 | $0 | $ - 0 |
EVALUATED OPTION PERIOD 3 2029 TOTAL
| $ - 0 | |
| ( Total Estimated Price is for evaluation purposes only; payment will be based on actual units serviced.) | |
| In the event a vault is less than 50% full at the time of service, the Government reserves the right to request a 'Partial Pump at a rate of 60% of the listed Unit Price. |
| EXHIBIT E OPTION PERIOD 4 (01 May 2030 - 30 April 2031) ( Estimated Service Dates 01 May 2030 - 31 October 2030) | ||||||
| Item Number | Location / Site Description | Qty of Vaults | Vault Capacity (gallons) | Miles From Cle Elum | Unit Price Per Vault | Total Location Price |
| 4001 | Speelyi Beach | 2 | 1000 | 7 | $0 | $ - 0 |
| 4002 | Salmon la Sac Guard Station | 1 | 1000 | 13 | $0 | $ - 0 |
| 4003 | Salmon la Sac Trailhead | 1 | 1000 | 13 | $0 | $ - 0 |
| 4004 | Scatter Creek Trailhead | 1 | 1000 | 29 | $0 | $ - 0 |
| 4005 | Tuquala Meadows/Hyas Trailhead | 2 | 1000 | 31 | $0 | $ - 0 |
| 4006 | Pete Lake Horse Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 4007 | Pete Lake Hiker Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 4008 | Keechelus Lake Boat Launch | 1 | 1000 | 30 | $0 | $ - 0 |
| 4009 | Rachel Lake Trailhead | 2 | 750 | 30 | $0 | $ - 0 |
| 4010 | East Kachess Group Site | 2 | 1000 | 19 | $0 | $ - 0 |
| 4011 | Stampede Pass Trailhead | 1 | 1000 | 20 | $0 | $ - 0 |
| 4012 | Lion Rock | 1 | 1000 | 38 | $0 | $ - 0 |
| 4013 | Ken Wilcox Horse Camp | 1 | 1000 | 35 | $0 | $ - 0 |
| 4013A | Ken Wilcox Horse Camp | 2 | 500 | 35 | $0 | $ - 0 |
| 4014 | Swauk Discovery Trailhead | 1 | 1000 | 27 | $0 | $ - 0 |
| 4015 | Red Top Trailhead | 1 | 1000 | 25 | $0 | $ - 0 |
| 4016 | Taneum Junction Trailhead | 1 | 1000 | 24 | $0 | $ - 0 |
| 4017 | Manastash Campground | 4 | 1000 | 37 | $0 | $ - 0 |
| 4018 | Manastash Trailhead | 1 | 1000 | 40 | $0 | $ - 0 |
| 4019 | Riders Camp Trailhead | 1 | 1000 | 38 | $0 | $ - 0 |
| 4020 | Shoestring Lake Trailhead | 1 | 1000 | 36 | $0 | $ - 0 |
| 4021 | Stafford Creek Trailhead | 1 | 1000 | 26 | $0 | $ - 0 |
| 4022 | Miller Bear Trailhead | 1 | 1000 | 27 | $0 | $ - 0 |
| 4023 | Teanaway Guard Station | 1 | 1000 | 24 | $0 | $ - 0 |
| 4024 | Beverly Campground | 2 | 500 | 26 | $0 | $ - 0 |
| 4025 | DeRoux Trailhead | 1 | 1000 | 30 | $0 | $ - 0 |
| 4026 | Esmerelda Trailhead | 1 | 1000 | 31 | $0 | $ - 0 |
EVALUATED OPTION PERIOD 4 2030 TOTAL
| $ - 0 | |||
| ( Total Estimated Price is for evaluation purposes only; payment will be based on actual units serviced.) | |||
| In the event a vault is less than 50% full at the time of service, the Government reserves the right to request a 'Partial Pump at a rate of 60% of the listed Unit Price. | |||
| GRAND TOTAL Base + All Option Periods | $ - 0 |
&"Times New Roman,Bold"Okanogan Wenatchee NF-Cle Elum Ranger District Vault Pumping Service Schedule of Items / Price List
BID SUMMARY SHEET (3)
ONLY FILL OUT THE YELLOW HIGHLIGHTED CELLS THROUGHOUT THIS BID SHEET, THEY WILL FEED INTO THE OTHER SECTIONS. DO NOT CHANGE THE FORMULAS IN THIS SHEET.
HRD & JRD Road Maintenance
1240BF23Q0065
| Company Name: |
| Point of Contact: |
| CAGE Code: |
| UEI Number: |
| Address: |
| Phone: |
| E-mail: |
| BASE PERIOD (Date of Award - 30 April 2024) | |||||
| Item Number | Description | Estimated Quantity | Unit of Issue | Unit Price | Total |
| 0001 | Mobilization to 8 Fathom Remote Road Sytem (Hoonah) | 1 | Each | $ - 0 | |
| 0002 | Mobilization to Salt Lake Bay Remote Road System (Hoonah) | 1 | Each | $ - 0 | |
| 0003 | Mobilization to Couverden Remote Road System (Juneau) | 1 | Each | $ - 0 | |
| 0004 | Load, Haul, and Place Material | Cubic Yard | $ - 0 | ||
| 0005 | Surface Maintenance (Compaction Method A) | Mile | $ - 0 | ||
| 0006 | Surface Maintenance (Compaction Method B) | Mile | $ - 0 | ||
| 0007 | Roadway Drainage Maintenance (Sidecast) | Mile | $ - 0 | ||
| 0008 | Roadway Drainage Maintenance (End Haul) | Cubic Yard | $ - 0 | ||
| 0009 | Brushing (Method A Treatment Area) | Mile | $ - 0 | ||
| 0010 | Brushing (Method B Treatment Area) | Mile | $ - 0 | ||
| 0011 | Spot Surfacing | Cubic Yard | $ - 0 | ||
| 0012 | Placed Riprap | Cubic Yard | $ - 0 | ||
| 0013 | Keyed Riprap | Cubic Yard | $ - 0 | ||
| 0014 | Grouted Riprap | Cubic Yard | $ - 0 | ||
| 0015 | Over and Above Work | 3 | Job | TBN | TBN |
| TOTAL | $ - 0 |
BID SUMMARY SHEET (4)
ONLY FILL OUT THE YELLOW HIGHLIGHTED CELLS THROUGHOUT THIS BID SHEET, THEY WILL FEED INTO THE OTHER SECTIONS. DO NOT CHANGE THE FORMULAS IN THIS SHEET.
HRD & JRD Road Maintenance
1240BF23Q0065
| Company Name: |
| Point of Contact: |
| CAGE Code: |
| UEI Number: |
| Address: |
| Phone: |
| E-mail: |
| BASE PERIOD (Date of Award - 30 April 2024) | |||||
| Item Number | Description | Estimated Quantity | Unit of Issue | Unit Price | Total |
| 0001 | Hoonah Road System & HRD Warehouse Access Road | 1 | Job | $ - 0 | |
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Surface Maintenance (Compaction Method A) | Mile | $ - 0 | |||
| Surface Maintenance (Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance (Sidecast) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance (End Haul) | Cubic Yard | $ - 0 | |||
| Brushing (Method A Treatment Area) | Mile | $ - 0 | |||
| Brushing (Method B Treatment Area) | Mile | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| Placed Riprap | Cubic Yard | $ - 0 | |||
| Keyed Riprap | Cubic Yard | $ - 0 | |||
| Grouted Riprap | Cubic Yard | $ - 0 | |||
| 0002 | Hoonah - 8 Fathom Road Sytem (Remote) | 1 | Job | $ - 0 | |
| Mobilization | Each | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Surface Maintenance (Compaction Method A) | Mile | $ - 0 | |||
| Surface Maintenance (Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance (Sidecast) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance (End Haul) | Cubic Yard | $ - 0 | |||
| Brushing (Method A Treatment Area) | Mile | $ - 0 | |||
| Brushing (Method B Treatment Area) | Mile | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| Placed Riprap | Cubic Yard | $ - 0 | |||
| Keyed Riprap | Cubic Yard | $ - 0 | |||
| Grouted Riprap | Cubic Yard | $ - 0 | |||
| 0003 | Hoonah - Salt Lake Bay Road System (Remote) | 1 | Job | $ - 0 | |
| Mobilization | Each | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Surface Maintenance (Compaction Method A) | Mile | $ - 0 | |||
| Surface Maintenance (Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance (Sidecast) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance (End Haul) | Cubic Yard | $ - 0 | |||
| Brushing (Method A Treatment Area) | Mile | $ - 0 | |||
| Brushing (Method B Treatment Area) | Mile | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| Placed Riprap | Cubic Yard | $ - 0 | |||
| Keyed Riprap | Cubic Yard | $ - 0 | |||
| Grouted Riprap | Cubic Yard | $ - 0 | |||
| 0004 | Juneau - Couverden Road System (Remote) | 1 | Job | $ - 0 | |
| Mobilization | Each | $ - 0 | |||
| Load, Haul, and Place Material | Cubic Yard | $ - 0 | |||
| Surface Maintenance (Compaction Method A) | Mile | $ - 0 | |||
| Surface Maintenance (Compaction Method B) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance (Sidecast) | Mile | $ - 0 | |||
| Roadway Drainage Maintenance (End Haul) | Cubic Yard | $ - 0 | |||
| Brushing (Method A Treatment Area) | Mile | $ - 0 | |||
| Brushing (Method B Treatment Area) | Mile | $ - 0 | |||
| Spot Surfacing | Cubic Yard | $ - 0 | |||
| Placed Riprap | Cubic Yard | $ - 0 | |||
| Keyed Riprap | Cubic Yard | $ - 0 | |||
| Grouted Riprap | Cubic Yard | $ - 0 | |||
| 0005 | Over and Above Work | 4 | Job | TBN | TBN |
| TOTAL | $ - 0 |
File details come from the government source that posted it. Updated .