Attachment 1 - Schedule of Items.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
La Mina and Big Tree Trail Rehabilitation Construction Project
Solicitation number
12445222R0011
Issued by

About this file

This document contains schedules of items and specifications for the La Mina and Big Tree Trail Rehabilitation Construction Project solicitation issued by the U.S. Department of Agriculture Forest Service. The solicitation seeks a single-award firm-fixed price contract valued between $1 million to $5 million to rehabilitate trails, bridges, interpretive sites and drainage structures located on the La Mina and Big Tree trails within El Yunque National Forest in Puerto Rico. Scope of work includes construction surveying, erosion control, clearing, removal and replacement of historic rocks and trees, trail widening, passing areas and stair reconstruction, interpretive site construction, excavation, retaining walls, gabion baskets, trail resurfacing, one culvert installation, one MSE wall, underdrain systems, bridge demolition and construction, guardrail and handrail removal and replacement, invasive species removal, tree planting, riprap, and contractor material testing. The solicitation is a total small business set-aside, with responses due per forthcoming solicitation issued by the Forest Service contracting office.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Big Tree Trail SOI

USDA Forest Service
La Mina and Big Tree Trail Rehabilitation Project
SCHEDULE OF ITEMS
BIG TREE TRAIL -- SCHEDULE OF ITEMS
ITEM NO.DESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15101(2)Mobilization / DemobilizationLump Sum1$ - 0$ - 0
15201(2)Construction survey and staking, method I, tolerance B,Lump Sum1$ - 0$ - 0
15702(2)Silt FenceL.F.7014$ - 0$ - 0
20102(2)Clearing and grubbing, disposal method Legally off National Forest LandsAcre1.50$ - 0$ - 0
20302(7)Removal of Individual Tree with Stump, disposal method Legally off National Forest LandsEach3$ - 0$ - 0
20302(8)Removal of Individual Interpretive Site, disposal method Legally off National Forest LandsEach2$ - 0$ - 0
20302(9)Removal of Individual Drainage Structure, disposal method Legally off National Forest LandsEach23$ - 0$ - 0
20303(4)Removal of Existing Trail Guard Railing w/ Reinforced Concrete and/or Wooden Posts and Railing, disposal method Legally off National Forest LandsFoot300$ - 0$ - 0
20303(5)Removal of Existing Trail Bridge Guard Railing w/ Reinforced Concrete Posts and/or Wood Posts and Railing, disposal method Legally off National Forest LandsFoot136$ - 0$ - 0
20303(6)Removal of Existing Stair Handrail w/ Reinforced Concrete Posts and/or Wood Post, disposal method Legally off National Forest LandsFoot166$ - 0$ - 0
20305(3)Removal of Trailway Reconstruction Material, Excessive and Unsuitable Trail Widening Material, Masonry Wall Excessive Excavation, Gabion Baskets Excessive Excavation, and Unsuitable Excavation Material, disposal method Legally off National Forest Lands*Cubic Yard31$ - 0$ - 0
20306(2)Removal of Existing Invasive Species Plants, disposal method, Legally off National Forest Lands or as appointed by C.O.Acre0.87$ - 0$ - 0
20401(2)Trailway Reconstruction excavation and embankment, compaction placement method FSSS Section 204.11(a)(1)(b), tolerance class FSSS Table 204-2 Class B*Cubic Yard153$ - 0$ - 0
20401(3)Interpretive Site excavation and embankment, compaction placement method FSSS Section 204.11(a)(1)(b), tolerance class FSSS Table 204-2 Class B*Cubic Yard22$ - 0$ - 0
20407(2)Excavation - Reinforced Concrete masonry retaining walls*Cubic Yard36$ - 0$ - 0
20407(3)Excavation - Gabion baskets*Cubic Yard101$ - 0$ - 0
25302(1)Gabions basket, wire type Welded or Twisted Wire, coating Polyvinyl chloride pvc*Cubic Yard490$ - 0$ - 0
25401(1)MSE Retaining Wall - Interpretive Site ASquare Feet51$ - 0$ - 0
25502(2)Select Granular Backfill and Geotextile -- Masonry Wall*Cubic Yard112$ - 0$ - 0
25502(3)Select granular backfill and Geotextile -- Interpretive Site A*Cubic Yard32$ - 0$ - 0
30103(4)Aggregate base, grading C compaction method FSSS Section 204.11(a)(1)(b) - Trail Widening*Cubic Yard90$ - 0$ - 0
30103(5)Aggregate base, grading C compaction method FSSS Section 204.11(a)(1)(b) - Trail Reconstruction*Cubic Yard17$ - 0$ - 0
55210(12)Trail and Stair Surface ImprovementSquare Feet8685$ - 0$ - 0
60101(5)Concrete, Masonry Wall Reinforcement, Foundation, Column, Top Beam, Leveling Course and Wall FaceCubic Yard80$ - 0$ - 0
60101(6)Concrete, Concrete with 1/2" Min. to 3" Max. Angular Stone Embeded Brushed Surface Finished -- Includes Stairs to be Widen, New Stair, and Reconstruction of StairsCubic Yard32$ - 0$ - 0
60101(7)Concrete, 4" depth concrete with 1/2" Min. to 3" Max. Angular Stone Embeded Brushed Surface Finished -- Includes Trail Widening, Trail Reconstruction, and Trail Passing AreaCubic Yard107$ - 0$ - 0
60101(8)Concrete, Open drainage crossingEach23$ - 0$ - 0
60413(2)Remove and rest, historic rocks/stones along trailLump Sum1$ - 0$ - 0
60502(2)Geocomposite underdrain system w/ Underdrain Pipe, Sheet Drains, and Geotextile fabric (Masonry Wall)*Foot166$ - 0$ - 0
60502(3)Geocomposite underdrain system w/ Underdrain Pipe, Sheet Drains, and Geotextile fabric (Gabion Wall)*Foot20$ - 0$ - 0
62505(2)Mulching, dry methodAcre0.87$ - 0$ - 0
62606(2)Plantings, Refer to FSSS Section 626 For RequirementsAcre0.87$ - 0$ - 0
70001(1)Interpretive Site A Construction In Its EntiretyLump Sum1$ - 0$ - 0
70001(2)Interpretive Site #2 Construction In Its EntiretyLump Sum1$ - 0$ - 0
70001(3)Interpretive Site #7 Construction In Its EntiretyLump Sum1$ - 0$ - 0
70001(4)Interpretive Site #9 Construction In Its EntiretyLump Sum1$ - 0$ - 0
70001(5)Interpretive Site #12 Construction In Its EntiretyLump Sum1$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BRIDGE 12
55210(13)Trail Bridge Surface ImprovementSquare Feet80$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BRIDGE 13
55210(14)Trail Bridge Surface ImprovementSquare Feet125$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BRIDGE 14
55210(15)Trail Bridge Surface ImprovementSquare Feet45$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BIG TREE TRAIL OPTIONAL PAY ITEMS -- GUARD RAILING AND POSTS
55601(11)Primary Bridge Guard Railing w/ reinforced concrete postFoot184$ - 0$ - 0
55601(13)Primary Trail Guard Railing w/ reinforced concrete postFoot300$ - 0$ - 0
55601(15)Primary Stair Handrail w/ reinforced concrete postsFoot241$ - 0$ - 0
55601(17)Additional Trail Guard Railing w/ reinforced concrete postFoot278$ - 0$ - 0
SUBTOTAL PRICE$ - 0

GRAND TOTAL PRICE $ - 0

*Denotes --- Contract Quantities (FAR Clause 52.211-18 Variation in Estimated Quantity) {Contract quantities will be adjusted only when there are errors in the original design of 15% or more}

La Mina Falls Bridge SOI

USDA Forest Service
La Mina and Big Tree Trail Rehabilitation Project
SCHEDULE OF ITEMS

LA MINA FALLS TRAIL BRIDGE #11 -- SCHEDULE OF ITEMS

ITEM NO.DESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15101(3)Mobilization / DemobilizationLump Sum1$ - 0$ - 0
15201(3)Construction survey and staking, method I, tolerance B,LS1$ - 0$ - 0
15402(3)Contractor testing, Trail Bridge structural concreteLump Sum1$ - 0$ - 0
15755(2)Dewatering Structures -- Installation and RemovalLump Sum1$ - 0$ - 0
20102(3)Clearing and grubbing, disposal method Legally off National Forest LandsAcre0.15$ - 0$ - 0
20303(7)Removal of Existing Trail Bridge Guard Railing w/ Reinforced Concrete Posts and Galvanized Railing, disposal method Legally off National Forest LandsFoot120$ - 0$ - 0
25101(2)Machine Furnished, Placed, and Color Grouted Riprap, class 2*Ton20$ - 0$ - 0
26003(1)Rock Bolts and DowelsLump Sum1$ - 0$ - 0
55506(1)W14x30 H BeamFoot80$ - 0$ - 0
55201(3)Structural concrete, Class A, Trail Bridge substructure & superstructure (foundation, footings, existing pier repairs, encasements, new piers, abutment, columns, viewing platform deck, viewing platform deck infill, and all reinforcement in its entirety)*Cubic Yard10$ - 0$ - 0
55210(16)Trail Bridge Surface ImprovementSquare Feet368$ - 0$ - 0
55214(3)Expansion Joints, Elastomeric expansion joint sealFoot58$ - 0$ - 0
55601(19)Bridge Guard Railing w/ reinforced concrete postFoot128$ - 0$ - 0

GRAND TOTAL PRICE $ - 0

*Denotes --- Contract Quantities (FAR Clause 52.211-18 Variation in Estimated Quantity) {Contract quantities will be adjusted only when there are errors in the original design of 15% or more}

La Mina Trail SOI

USDA Forest Service
La Mina and Big Tree Trail Rehabilitation Project
SCHEDULE OF ITEMS
LA MINA TRAIL -- SCHEDULE OF ITEMS
ITEM NO.DESCRIPTIONPAY UNITEST.
QUANTITYUNIT PRICETOTAL PRICE
15101(1)Mobilization / DemobilizationLump Sum1$ - 0$ - 0
15201(1)Construction survey and staking, method I, tolerance B,Lump Sum1$ - 0$ - 0
15702(1)Silt FenceFoot3237$ - 0$ - 0
15755(1)Dewatering Structures -- Installation and RemovalLump Sum1$ - 0$ - 0
20102(1)Clearing and grubbing, disposal method Legally off National Forest LandsAcre0.62$ - 0$ - 0
20302(1)Removal of Individual Tree with Stump, disposal method Legally off National Forest LandsEach3$ - 0$ - 0
20302(2)Removal of Individual Interpretive Site, disposal method Legally off National Forest LandsEach2$ - 0$ - 0
20302(3)Removal of Individual Drainage Structure, disposal method Legally off National Forest LandsEach11$ - 0$ - 0
20302(4)Removal of 18" dia. x 8-ft length Corrugated Metal Pipe, disposal method Legally off National Forest LandsEach1$ - 0$ - 0
20302(5)Removal of Exsting Bridge #5, disposal method Legally off National Forest LandsEach1$ - 0$ - 0
20302(6)Removal of Exsting Bridge #6, disposal method Legally off National Forest LandsEach1$ - 0$ - 0
20303(1)Removal of Existing Trail Guard Railing w/ Reinforced Concrete and/or Wooden Posts and Railing, disposal method Legally off National Forest LandsFoot389$ - 0$ - 0
20303(2)Removal of Existing Trail Bridge Guard Railing w/ Reinforced Concrete Posts and/or Wood Posts and Railing, disposal method Legally off National Forest LandsFoot214$ - 0$ - 0
20303(3)Removal of Existing Stair Handrail w/ Reinforced Concrete Posts, disposal method Legally off National Forest LandsFoot495$ - 0$ - 0
20305(1)Removal of Trailway Reconstruction Material, Grouted Riprap Excessive Excavated Material, Excessive and Unsuitable Trail Widening Material, Trail Bridge #5 and #6 Excavation Material, and Masonry Wall Excessive and Unsuitable Excavation Material, disposal method Legally off National Forest Lands*Cubic Yard358$ - 0$ - 0
20305(2)Removal of Existing Stairs and Stairs to be Re-constructed Material, disposal method Legally off National Forest Lands*Cubic Yard12$ - 0$ - 0
20306(1)Removal of Existing Invasive Species Plants, disposal method, Legally off National Forest Lands or as appointed by C.O.Acre2.20$ - 0$ - 0
20401(1)Trailway Reconstruction excavation and embankment, compaction placement method FSSS Section 204.11(a)(1)(b), tolerance class FSSS Table 204-2 Class B*Cubic Yard346$ - 0$ - 0
20407(1)Excavation - Reinforced Concrete masonry retaining walls*Cubic Yard74$ - 0$ - 0
20701(1)Earthwork geosynthetics, type C, Class 1 (Beneath Grouted Riprap)Square Yard650$ - 0$ - 0
25101(1)Machine Furnished, Placed, and Colored Grouted Riprap, class 5*Ton700$ - 0$ - 0
25103Placed Stone revetment w/ Geotextile, riprap class 1*Ton21$ - 0$ - 0
25502(1)Select Granular Backfill and Geotextile -- Masonry Wall*Cubic Yard54$ - 0$ - 0
30103(1)Aggregate base, grading C compaction method FSSS Section 204.11(a)(1)(b) - Trail Widening*Cubic Yard90$ - 0$ - 0
30103(2)Aggregate base, grading C compaction method FSSS Section 204.11(a)(1)(b) - Trail Reconstruction*Cubic Yard17$ - 0$ - 0
30103(3)Aggregate base, grading C compaction method FSSS Section 204.11(a)(1)(b) - Trail Passing Areas*Cubic Yard6$ - 0$ - 0
55210(1)Trail and Stair Surface ImprovementSquare Feet8685$ - 0$ - 0
60101(1)Concrete, Masonry Wall Reinforcement, Foundation, Column, Top Beam, Leveling Course and Wall FaceCubic Yard15$ - 0$ - 0
60101(2)Concrete, Concrete with 1/2" Min. to 3" Max. Angular Stone Embeded Brushed Surface Finished -- Includes Stairs to be Widen, New Stair, and Reconstruction of StairsCubic Yard44$ - 0$ - 0
60101(3)Concrete, 4" depth concrete with 1/2" Min. to 3" Max. Angular Stone Embeded Brushed Surface Finished -- Includes Trail Widening, Trail Reconstruction, and Trail Passing AreaCubic Yard105$ - 0$ - 0
60101(4)Concrete, Open drainage crossingEach11$ - 0$ - 0
60201(1)18-inch Diameter pipe culvert, Corrugated Aluminized Steel Round CulvertFoot20$ - 0$ - 0
60413(1)Remove and rest, historic rocks/stones along trailLump Sum1$ - 0$ - 0
60502(1)Geocomposite underdrain system w/ Underdrain Pipe, Sheet Drains, and Geotextile fabric (Masonry Wall)Foot33$ - 0$ - 0
62505(1)Mulching, dry methodAcre2.20$ - 0$ - 0
62606(1)Plantings, Refer to FSSS Section 626 For RequirementsAcre2.20$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BRIDGE 1
25101(2)Machine Furnished, Placed, and Colored Grouted Riprap, class 2Ton5.5$ - 0$ - 0
55210(2)Trail Bridge Surface ImprovementSquare Feet135$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BRIDGE 2
55210(3)Trail Bridge Surface ImprovementSquare Feet70$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BRIDGE 3
55210(4)Trail Bridge Surface ImprovementSquare Feet37$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BRIDGE 4
55210(5)Trail Bridge Surface ImprovementSquare Feet48$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BRIDGE 5
15402(1)Contractor testing, Trail Bridge structural concrete and structural backfillEach1$ - 0$ - 0
20401(2)Trail Bridge excavation and embankment, compaction placement method FSSS Section 204.11(a)(1)(b), tolerance class FSSS Table 204-2 Class BCubic Yard58$ - 0$ - 0
55201(1)Structural concrete, Class A, Trail Bridge substructure & superstructure (foundation, footings, deck, abutment, columns, and all reinforcement)Cubic Yard17$ - 0$ - 0
55210(6)Trail Bridge Surface ImprovementSquare Feet132$ - 0$ - 0
55214(1)Expansion Joints, Elastomeric expansion joint sealFoot15$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BRIDGE 6
15402(2)Contractor testing, Trail Bridge structural concrete and structural backfillEach1$ - 0$ - 0
20401(2)Trail Bridge excavation and embankment, compaction placement method FSSS Section 204.11(a)(1)(b), tolerance class FSSS Table 204-2 Class BCubic Yard18$ - 0$ - 0
55201(2)Structural concrete, Class A, Trail Bridge substructure & superstructure (foundation, footings, deck, abutment, columns, and all reinforcement)Cubic Yard7$ - 0$ - 0
55210(7)Trail Bridge Surface ImprovementSquare Feet52$ - 0$ - 0
55214(2)Expansion Joints, Elastomeric expansion joint sealFoot10$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BRIDGE 7
55210(8)Trail Bridge Surface ImprovementSquare Feet28$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BRIDGE 8
55210(9)Trail Bridge Surface ImprovementSquare Feet48$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BRIDGE 9
25101(4)Machine Furnished, Placed, and Colored Grouted Riprap, class 2Ton6.0$ - 0$ - 0
55210(10)Trail Bridge Surface ImprovementSquare Feet42$ - 0$ - 0
SUBTOTAL PRICE$ - 0
BRIDGE 10
25101(5)Machine Furnished, Placed, and Colored Grouted Riprap, class 2Ton4.70$ - 0$ - 0
55210(11)Trail Bridge Surface ImprovementSquare Feet32$ - 0$ - 0
SUBTOTAL PRICE$ - 0
OPTIONAL PAY ITEMS -- GUARD RAILING AND POSTS AND SEAL CONCRETE
55601(1)Primary Bridge Guard Railing w/ reinforced concrete postFoot415$ - 0$ - 0
55601(3)Primary Trail Guard Railing w/ reinforced concrete postFoot389$ - 0$ - 0
55601(5)Primary Stair Handrail w/ reinforced concrete postsFoot495$ - 0$ - 0
55601(7)Additional Trail Guard Railing w/ reinforced concrete postFoot298$ - 0$ - 0
55601(9)Additional Stair Handrail w/ reinforced concrete postsFoot15$ - 0$ - 0
55217(1)Seal Concrete Surface, 6" depthCubic Yard5$ - 0$ - 0
SUBTOTAL PRICE$ - 0

GRAND TOTAL PRICE $ - 0

*Denotes --- Contract Quantities (FAR Clause 52.211-18 Variation in Estimated Quantity) {Contract quantities will be adjusted only when there are errors in the original design of 15% or more}

Total La Mina Trail Length to end of bridge #11 = 3,865.28'