This document contains a schedule of items for a federal construction contract solicitation to improve several forest service roads in Idaho. Key work includes roadway and drainage excavation, culvert removal and installation, signage, aggregate surfacing, and road reconditioning. Bidders are asked to provide unit pricing for over 50 separate construction items across over 30 miles of forest roads. An option is also included to extend work on one additional road segment. The solicitation was issued by the USDA Forest Service under number 1240LU24R0003 for the GAOA Elk City Wagon Road Improvements project. Response due dates and award timing are not provided in this schedule of items attachment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B-1 SCHEDULE OF ITEMS - BASE BID

ITEM

NO.

DESCRIPTION PAY UNIT

EST.

QTY.

UNIT PRICE TOTAL PRICE

15101 Mobilization Lump Sum ALL $________ $________

20302A Removal of Culvert, Disposal Method (A) Each 1 $________ $________

20302B Removal of Vault Toilet, Disposal Method (A) Each 1 $________ $________

20401 Excavation and Embankment, Tolerance Class (A), Compaction Method (B), Placement Method (2) Cubic Yard* 30 $________ $________

20420A Drainage Excavation, Type Construct Leadout Ditch, Tolerance Class (A), Compaction Method (E) Linear Foot 180 $________ $________

20420B Recondition Existing Leadout Ditch, Tolerance Class

(A), Compaction Method (E), Placement Method (5) Linear Foot 180 $________ $________

20420C Drainage Excavation, Construct Ditch, Tolerance Class

(A), Compaction Method (E) Linear Foot 100 $________ $________

20421A

Drainage Excavation, Type II Construct Drivable Dip, Tolerance Class (A), Compaction Method (B), Placement Method (2)

Each 23 $________ $________

20421B Drainage Excavation, Recondition Drivable Dip, Tolerance Class (A), Compaction Method (B) Each 97 $________ $________

20421C Drainage Excavation, Type Catch Basin, Tolerance

Class (A), Compaction Method (E) Each 1 $________ $________

25101 Placed Riprap, Class 3 (Commercial Source) Cubic Yard* 30 $________ $________

30114A Subbase (French Drain W/ Geotextile Wrap)

(Commercial Source) Square Feet 3820 $________ $________

30114B Subbase (3"- Minus Rock Only) (Commercial Source) Square Feet 1500 $________ $________

30115 Aggregate Surface Course, Grading (F), Compaction

Method (B) (Commercial Source) Cubic Yard* 570 $________ $________

30302 Ditch Reconditioning Linear Foot 800 $________ $________

30315 Roadway Reconditioning, Compaction Method (B), Placement Method (2) Mile 6.74 $________ $________

60201 18" Pipe Culvert, Corrugated Steel, 16 Gage, Compaction Method (F), Placement Method (6) Linear Foot 84 $________ $________

60708A Cleaning Culverts in Place, Steel Cross Drain Each 9 $________ $________

60708B Cleaning Culverts in Place, Wood Open Top Each 22 $________ $________

62201A Equipment Rental, Excavator Hour 12 $________ $________

Idaho County, Idaho

PART I - SCHEDULE OF ITEMS

SECTION B - SERVICES AND PRICES

NPCNF HISTORIC ROADS

ELK CITY WAGON ROAD IMPROVEMENTS

Nez Perce - Clearwater National Forests

Moose Creek and Red River Ranger District

ROAD IMPROVEMENTS: FSR 284 - MP 0.00 TO 20.25, FSR 1858 - MP 20.25 TO 25.92

Attachment 1 1240LU24R0003

62201B Equipment Rental, Dump Truck Hour 12 $________ $________

62201C Equipment Rental, Grader Hour 12 $________ $________

63301 Sign System (Mileage Markers) Each 14 $________ $________

63313 Sign System (Inclusive of Small & Medium Sized

Directional/Road Signs) Lump Sum ALL $________ $________

63315 Information Kiosk Each 3 $________ $________

64301 Precast Concrete Single Vault Toilet Each 1 $________ $________

63313 Sign System (Inclusive of Small & Medium Sized

Directional/Road Signs) Lump Sum ALL $________ $________

60708A Cleaning Culverts in Place, Steel Cross Drain Each 1 $________ $________

30315 Roadway Reconditioning, Compaction Method (B), Placement Method (2) Mile 0.19 $________ $________

60708A Cleaning Culverts in Place, Steel Cross Drain Each 1 $________ $________

63313 Sign System (Inclusive of Small & Medium Sized

Directional/Road Signs) Lump Sum ALL $________ $________

63315 Information Kiosk Each 1 $________ $________

B-1A SCHEDULE OF ITEMS - OPTION ITEM 1

ITEM

NO.

DESCRIPTION PAY UNIT

EST.

QTY.

UNIT PRICE TOTAL PRICE

20302A Removal of Culvert, Disposal Method (A) Each 2 $________ $________

20420B Recondition Existing Leadout Ditch, Tolerance Class

(A), Compaction Method (E), Placement Method (5) Linear Foot 40 $________ $________

20421A

Drainage Excavation, Type II Construct Drivable Dip, Tolerance Class (A), Compaction Method (B), Placement Method (2)

Each 6 $________ $________

20421B Drainage Excavation, Recondition Drivable Dip, Tolerance Class (A), Compaction Method (B) Each 25 $________ $________

30115 Aggregate Surface Course, Grading (F), Compaction

Method (B) (Commercial Source) Cubic Yard* 10 $________ $________

30315 Roadway Reconditioning, Compaction Method (B), Placement Method (2) Mile 2.4 $________ $________

60201 18" Pipe Culvert, Corrugated Steel, 16 Gage, Compaction Method (F) Linear Foot 24 $________ $________

60708B Cleaning Culverts in Place, Wood Open Top Each 5 $________ $________

ROAD IMPROVEMENTS: FSR 1808 (CLOSED) - MP 0.00 TO 2.40

B-2 NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction

Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

ROAD IMPROVEMENTS: FSR 307 - MP 0.00 TO 3.27

ROAD IMPROVEMENTS: FSR 1808 - MP 0.00 TO 5.57