This document contains a schedule of items for a federal construction contract solicitation to improve several forest service roads in Idaho. Key work includes roadway and drainage excavation, culvert removal and installation, signage, aggregate surfacing, and road reconditioning. Bidders are asked to provide unit pricing for over 50 separate construction items across over 30 miles of forest roads. An option is also included to extend work on one additional road segment. The solicitation was issued by the USDA Forest Service under number 1240LU24R0003 for the GAOA Elk City Wagon Road Improvements project. Response due dates and award timing are not provided in this schedule of items attachment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B-1 SCHEDULE OF ITEMS - BASE BID
ITEM
NO.
DESCRIPTION PAY UNIT
EST.
QTY.
UNIT PRICE TOTAL PRICE
15101 Mobilization Lump Sum ALL $________ $________
20302A Removal of Culvert, Disposal Method (A) Each 1 $________ $________
20302B Removal of Vault Toilet, Disposal Method (A) Each 1 $________ $________
20401 Excavation and Embankment, Tolerance Class (A), Compaction Method (B), Placement Method (2) Cubic Yard* 30 $________ $________
20420A Drainage Excavation, Type Construct Leadout Ditch, Tolerance Class (A), Compaction Method (E) Linear Foot 180 $________ $________
20420B Recondition Existing Leadout Ditch, Tolerance Class
(A), Compaction Method (E), Placement Method (5) Linear Foot 180 $________ $________
20420C Drainage Excavation, Construct Ditch, Tolerance Class
(A), Compaction Method (E) Linear Foot 100 $________ $________
20421A
Drainage Excavation, Type II Construct Drivable Dip, Tolerance Class (A), Compaction Method (B), Placement Method (2)
Each 23 $________ $________
20421B Drainage Excavation, Recondition Drivable Dip, Tolerance Class (A), Compaction Method (B) Each 97 $________ $________
20421C Drainage Excavation, Type Catch Basin, Tolerance
Class (A), Compaction Method (E) Each 1 $________ $________
25101 Placed Riprap, Class 3 (Commercial Source) Cubic Yard* 30 $________ $________
30114A Subbase (French Drain W/ Geotextile Wrap)
(Commercial Source) Square Feet 3820 $________ $________
30114B Subbase (3"- Minus Rock Only) (Commercial Source) Square Feet 1500 $________ $________
30115 Aggregate Surface Course, Grading (F), Compaction
Method (B) (Commercial Source) Cubic Yard* 570 $________ $________
30302 Ditch Reconditioning Linear Foot 800 $________ $________
30315 Roadway Reconditioning, Compaction Method (B), Placement Method (2) Mile 6.74 $________ $________
60201 18" Pipe Culvert, Corrugated Steel, 16 Gage, Compaction Method (F), Placement Method (6) Linear Foot 84 $________ $________
60708A Cleaning Culverts in Place, Steel Cross Drain Each 9 $________ $________
60708B Cleaning Culverts in Place, Wood Open Top Each 22 $________ $________
62201A Equipment Rental, Excavator Hour 12 $________ $________
Idaho County, Idaho
PART I - SCHEDULE OF ITEMS
SECTION B - SERVICES AND PRICES
NPCNF HISTORIC ROADS
ELK CITY WAGON ROAD IMPROVEMENTS
Nez Perce - Clearwater National Forests
Moose Creek and Red River Ranger District
ROAD IMPROVEMENTS: FSR 284 - MP 0.00 TO 20.25, FSR 1858 - MP 20.25 TO 25.92
Attachment 1 1240LU24R0003
62201B Equipment Rental, Dump Truck Hour 12 $________ $________
62201C Equipment Rental, Grader Hour 12 $________ $________
63301 Sign System (Mileage Markers) Each 14 $________ $________
63313 Sign System (Inclusive of Small & Medium Sized
Directional/Road Signs) Lump Sum ALL $________ $________
63315 Information Kiosk Each 3 $________ $________
64301 Precast Concrete Single Vault Toilet Each 1 $________ $________
63313 Sign System (Inclusive of Small & Medium Sized
Directional/Road Signs) Lump Sum ALL $________ $________
60708A Cleaning Culverts in Place, Steel Cross Drain Each 1 $________ $________
30315 Roadway Reconditioning, Compaction Method (B), Placement Method (2) Mile 0.19 $________ $________
60708A Cleaning Culverts in Place, Steel Cross Drain Each 1 $________ $________
63313 Sign System (Inclusive of Small & Medium Sized
Directional/Road Signs) Lump Sum ALL $________ $________
63315 Information Kiosk Each 1 $________ $________
B-1A SCHEDULE OF ITEMS - OPTION ITEM 1
ITEM
NO.
DESCRIPTION PAY UNIT
EST.
QTY.
UNIT PRICE TOTAL PRICE
20302A Removal of Culvert, Disposal Method (A) Each 2 $________ $________
20420B Recondition Existing Leadout Ditch, Tolerance Class
(A), Compaction Method (E), Placement Method (5) Linear Foot 40 $________ $________
20421A
Drainage Excavation, Type II Construct Drivable Dip, Tolerance Class (A), Compaction Method (B), Placement Method (2)
Each 6 $________ $________
20421B Drainage Excavation, Recondition Drivable Dip, Tolerance Class (A), Compaction Method (B) Each 25 $________ $________
30115 Aggregate Surface Course, Grading (F), Compaction
Method (B) (Commercial Source) Cubic Yard* 10 $________ $________
30315 Roadway Reconditioning, Compaction Method (B), Placement Method (2) Mile 2.4 $________ $________
60201 18" Pipe Culvert, Corrugated Steel, 16 Gage, Compaction Method (F) Linear Foot 24 $________ $________
60708B Cleaning Culverts in Place, Wood Open Top Each 5 $________ $________
ROAD IMPROVEMENTS: FSR 1808 (CLOSED) - MP 0.00 TO 2.40
B-2 NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction
Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
ROAD IMPROVEMENTS: FSR 307 - MP 0.00 TO 3.27
ROAD IMPROVEMENTS: FSR 1808 - MP 0.00 TO 5.57
File details come from the government source that posted it. Updated .