Attachment 1 - Schedule of Items.pdf

PDF 103 KB Posted

Attached to
All Weather Access Federal contract opportunity
Solicitation number
1240LT23Q0054
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to All Weather Access, newest first.
File Type Posted
Attachment 7 - Wage Determination.pdf PDF
Attachment 2 - Combined Dwgs.pdf PDF
Attachment 6 - Aggregate Spec.pdf PDF
Attachment 3 - Description of Work.pdf PDF
Attachment 5 - Specs.pdf PDF
RFQ 1240LT23Q0054 - All Weather Access.pdf PDF
Attachment 4 - Specs Cover Sheet.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

GAOA 2022 Road Aggregate

Wall Ranger District

Item Type Unit No. Description Msrmt Unit Qty. Price Total

Base Item - NFSR 7172

15101 Mobilization LSQ LS 1

30201 Aggregate Base-Base Course Compaction Method A DQ CY 1,680

30307 Roadbed Reconditioning Compaction Method A DQ Mile 2

30308A Drainage Crossing Reconditioning DQ Each 1

TOTAL BASE BID

ITEMS

Option Item A - NFSR 7172

30201 Aggregate Base-Base Course Compaction Method A DQ CY 420

30307 Roadbed Reconditioning Compaction Method A DQ Mile 0.5

TOTAL OPTION A

BID ITEMS

Option Item B - NFSR 7172

Compaction Method A DQ CY 210

30307 Roadbed Reconditioning Compaction Method A DQ Mile 0.25

TOTAL OPTION B

Option Item C - NFSR 7172

Compaction Method A DQ CY 210

30307 Roadbed Reconditioning Compaction Method A DQ Mile 0.25

30308A Drainage Crossing Reconditioning DQ Each 1

TOTAL OPTION C

Option Item D – NFSR 7172

70802A Remove existing CMP and install new 24” dia. by 30’ long corrugated HDPE pipe culvert

LSQ LS 1

TOTAL ALL BID

ITEMS

File details come from the government source that posted it. Updated .