Attachment 1 Schedule A (High Visibility) Maps.pdf

PDF 5 MB Posted

Attached to
Fort Campbell Grounds Maintenance Federal contract opportunity
Solicitation number
W91248
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command

View the file

Other files for this federal contract opportunity

Other files attached to Fort Campbell Grounds Maintenance, newest first.
File Type Posted
Attachment 4 SCHED D_Large Ranges.pdf PDF
Attachment 6 SCHED D_Small Arms Ranges.pdf PDF
Attachment 3 Schedule C (TN Cantonment).pdf PDF
Performance Work Statement (Grounds Maintenance All Schedules).docx DOCX document
Attachment 7 Schedule E (CAAF and Sabre).pdf PDF
Attachment 5 SCHED D_Other Ranges.pdf PDF
Attachment 2 Schedule B (Kentucky Cantonment) Maps.pdf PDF
Source Sought Notice.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule A (High Visibility area)

BLDG 80

Youth CTR

Schedule [A] (High Visibility Mowing) 14NOV2019

Sink LIB

BLDG #38

= 6.81 ac

Cover Sheet

The quantity of acres to be maintained on the SCHED [A] rotation has been reduced from

332.01 acres to 198.42 acres.

Schedule A are the High Visibility Areas and CDCs that are to be maintained every 10 calendar days.

The ceremony area at BLDG 2700 (1.7 ac) is to be raked each time it is mowed.

The ceremony area at BLDG 2700 (1.7 ac); the DIV Parade Field (30 ac); and the POW Cemetery (0.31 ac) are to be aerated, fertilized, treated wtih a pre-emergent, and overseeded with KY 31 fescue, annually.

"Ý

Gardner Hills Woodlands

Schedule A (High Visibility Mowing) 2NOV2019

SH_01

POW Cemetery = 0.31 ac

DO NOT MOW

Gate 4

Cole Park Commons = 5.88 ac

CDCs 7402 and 7404 = 10.99 ac

Schedule A (High Visibility Mowing) 2NOV2019

SH_02

DO NOT MOW

Gate 4

BLDG 7514

Hope Chapel = 0.60 ac

Parade Ground, NCOA

BLDG 7523

= 1.58 ac

RNG 3A

RNG 4

Werner Park

SH_03

DO NOT MOW

Gate 4

BLDG #1747

Fire Station #1 = 1.54 ac

BLDG 5292

K-9 Kennels = 1.99 ac

BLDG #6721

Community Chapel = 1.95 ac

BLDG #5382

CDC (mow only on SAT) = 1.59 ac

Werner Park

SH_04

DO NOT MOW

Gate 4

BLDG #1231 and 1232 CDC (Mow only on SAT) = 8.23 ac

BLDG #2311

Warrior Transition Unit = 3.26 ac

SH_05

SCHED [C]

TN Cantonment

Gate 4

Memorial Row = 7.94 ac

BLDG #5875

Soldier's Chapel = 1.07 ac

Gander Memorial & Pratt Museum = 13.90 ac

Outdoor Displays & 4th BCT Memorial = 3.85 ac

SCHED [B]

KY Cantonment

BLDG 5661

Lee Soldier & Family SPT = 2.11 ac

Hammond HeightsSchedule A (High Visibility Mowing) 2NOV2019

SH_06

SCHED [C]

TN Cantonment

Gate 4

Post OFC, Wilson Theater & sidewalk = 1.69 ac

Sink Library, CDC #207 & sidewalk (Mow CDC only on SAT) = 2.61 ac

SCHED [B]

KY Cantonment

T39, # 2601, #2602 #2604, #2699 = 7.84 ac

Stryker Village

Schedule A (High Visibility Mowing) 2NOV2019

SH_07

Gate 3

Gate 4

#202

BLDG 202 ED CTR

BLDG #205 CDC

(Only mow CDC on SAT) = 8.18 ac

Former motor pool

DO NOT MOW

Mow buffer around perimeter

#203

Schedule A (High Visibility area)

Youth CTR

Schedule [A] (High Visibility Mowing) 14NOV2019

Town Center = 6.78 ac

Sink LIB

BLDG #38

= 6.81 ac

SH_08

Helicopter Display

PX

Soldier

SPT

CTR

BLDG 2700

Rake grass inside the 1.7 ac yellow polygon (inside the shrubs).

Same for aeration, fertilizer, pre-emergent, and overseeding Total area for mowing at BLDG #2700 = 4.83 acres

#2700

Hammond Heights

Summer Park

McAuliffe Park

Schedule A (High Visibility Mowing) 2NOV2019

SH_09

Do not mow

Gate 4

BLDG #3111

Liberty Chapel = 3.45 ac

CDC #3301

Only Mow on SAT =1.57 ac

CDC #3069 & #3071

Only mow on SAT = 6.44 ac

CDC #3066

Only Mow on SAT =3.43 ac

Gabriel FLD 5th SFG(A) = 4.11 ac

Lee Village

LaPointe Village

Pierce Village

Schedule A (High Visibility Mowing) 2NOV2019

SH_10

Do not mow

Gate 4

BLDG #3934

Memorial Chapel = 0.70 ac

SH_11

Do not mow

Water Tank

Gate 4

TN NGB

Unit TNG Equip Storage

(UTES)

DIV Parade FLD = 30.0 ac

Do not mow

SH_12

Exterior of Wall Gate 6 to Gate 4 = 9.43 ac

Gate 4

BLDG #5001

= 4.28 ac

Gate 6

Gate 5

T.C. Freeman Gate 4

Exterior of Wall Gate 4 to Gate 3 = 8.08 ac

Gate 3

TC Freeman Gate Inbound Lanes = 10.08 ac

SH_13

Exterior of Wall Gate 3 to Gate 2 = 6.94 ac

Gate 4

Gate 3

Gate 2

Exterior of Wall Gate 2 to Gate 1 = 2.66 ac

Gate 1

Youth CTR

Schedule A (High Visibility Mowing) 4NOV2019

SH_14

Gate 4

Air Assault School

BLDG #6883

= 8.14 ac

SCHED A SUMMARY
Reduced QTY for SCHED A_14NOV2019
SH_01 SCHED A
SH_02 SCHED A.NCOA
SH_03 SCHED A K9 and Fire Station #1
SH_04 SCHED A WTU and CDC
SH_05 SCHED A Gander
SH_06 SCHED A T39
SH_07 SCHED A ED CTR
SH_08 SCHED A BLDG 2700_14NOV19
SH_09 SCHED A Gabriel FLD
SH_10 SCHED A Memorial Chapel
SH_11 SCHED A Parade FLD
SH_12 SCHED A Gate 4
SH_13 SCHED A Gate 1
SH_14 SCHED A Air Assault School

File details come from the government source that posted it. Updated .