attachment-1-rfp-dot-2027-05.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
Aerial lift / Bucket Truck - ANSI Inspection, Maintenance and Repair.
Solicitation number
RFB DOT 2027-05
Issued by
New Hampshire

About this file

This is an Offer Worksheet for a Request for Proposal (RFP) issued by the State of New Hampshire Department of Transportation for aerial lift and bucket truck ANSI inspection, maintenance, and repair services. The worksheet details an inventory of 23 aerial lift and bucket truck units across multiple makes and models, including DUR-A-LIFT (4 units), ALTEC (1 unit), Elliott (2 units), DC BATES (3 units), Versalift (5 units), Utem (5 units), and UTV HERCULES (1 unit), located at various garages and maintenance facilities throughout the state. The vehicles are distributed across multiple districts and departments, including Traffic Signal Shop locations, Bridge Maintenance facilities, Turnpikes/Traffic operations, and Highway Districts. The contract period covers fiscal years 2027 through 2031 (five years), with estimated labor hours ranging from 7 to 25 hours per unit type for repairs and scheduled maintenance.

The worksheet requires bidders to complete pricing for annual safety inspection flat-rate charges and filter costs for each fiscal year from FY2027 through FY2031, as well as labor rates for repairs and scheduled maintenance across the contract term. All cost fields in the provided worksheet are currently blank (showing $0.00), indicating this is a template awaiting contractor pricing submissions. Labor hours are estimated on a bid basis only, with actual hours to be invoiced as incurred. The worksheet notes that red-flagged units may be under original equipment manufacturer warranty and subject to replacement during the contract period. Bidders must initial and date the completed worksheet upon submission.

View the file

Other files

File Type Posted
rfb-dot-2027-05.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offer Worksheet

MakeYearModel# of UnitsTruck #Serial NumberGarage Location and Contact
DUR-A-LIFT2018DTAS-35TS1H1505A10756District 2 -Enfield Shed -Alex Stableton Tel # 448-1057
DUR-A-LIFT2018DTAS-35TS1H1506A10757District 5 -Derry Shed - Raymond Ryan Tel #
Annual Safety Inspection (Flat Rate Charge)
+x2=$0.00
FY2027 inspection cost / ea.Filter Cost (current)FY2027 Total
+x2=$0.00
FY2028 inspection cost / ea.Filter Cost (current)FY2028 Total
+x2=$0.00
FY2029 inspection cost / ea.Filter Cost (current)FY2029 Total
+x2=$0.00
FY2030 inspection cost / ea.Filter Cost (current)FY2030 Total
+x2=$0.00
FY2031 inspection cost / ea.Filter Cost (current)FY2031 Total
Labor Per Hour For Repairs And Scheduled (* hours are estimated for bid basis only, actual hours will be invoiced )
x10 Hrs=$0.00
FY2027 Labor cost / Hr.FY2027 Total
x10Hrs.=$0.00
FY2028 Labor cost / Hr.FY2028 Total
x10Hrs.=$0.00
FY2029 Labor cost / Hr.FY2029 Total
x10Hrs.=$0.00
FY2030 Labor cost / Hr.FY2030 Total
x10Hrs.=$0.00
FY2031 Labor cost / Hr.FY2031 Total
5 Year cost including labor & Inspection Subsection total$0.00
MakeYearModel# of UnitsTRUCK H #Serial NumberGarage Location and Contact
ALTEC2020AT-200A1H3310920BV27416Traffic - Sign Shop - Matt Devellis Tel # 271-8132
Annual Safety Inspection (Flat Rate Charge)
+x1=$0.00
FY2027 inspection cost / ea.Filter Cost (current)FY2027 Total
+x1=$0.00
FY2028 inspection cost / ea.Filter Cost (current)FY2028 Total
+x1=$0.00
FY2029 inspection cost / ea.Filter Cost (current)FY2029 Total
+x1=$0.00
FY2030 inspection cost / ea.Filter Cost (current)FY2030 Total
+x1=$0.00
FY2031 inspection cost / ea.Filter Cost (current)FY2031 Total
Labor Per Hour For Repairs And Scheduled (* hours are estimated for bid basis only, actual hours will be invoiced )
x14 Hrs=$0.00
FY2027 Labor cost / Hr.FY2027 Total
x14 Hrs=$0.00
FY2028 Labor cost / Hr.FY2028 Total
x14 Hrs=$0.00
FY2029 Labor cost / Hr.FY2029 Total
x14 Hrs=$0.00
FY2030 Labor cost / Hr.FY2030 Total
x14 Hrs=$0.00
FY2031 Labor cost / Hr.FY2031 Total
5 Year cost including labor & Inspection Subsection total$0.00
MakeYearModel# of UnitsTRUCK H #Serial NumberGarage Location and Contact
Elliott2012H55R-MHA1H820AY - 5244Turnpikes / Traffic - Michael Drotar Tel # 419-9306
Elliott2023H55R-D1H16338528Traffic - Kevin O'Connor Tel # 419-9309
Annual Safety Inspection (Flat Rate Charge)
+x2=$0.00
FY2027 inspection cost / ea.Filter Cost (current)FY2027 Total
+x2=$0.00
FY2028 inspection cost / ea.Filter Cost (current)FY2028 Total
+x2=$0.00
FY2029 inspection cost / ea.Filter Cost (current)FY2029 Total
+x2=$0.00
FY2030 inspection cost / ea.Filter Cost (current)FY2030 Total
+x2=$0.00
FY2031 inspection cost / ea.Filter Cost (current)FY2031 Total
Labor Per Hour For Repairs And Scheduled (* hours are estimated for bid basis only, actual hours will be invoiced )
x25 Hrs=$0.00
FY2027 Labor cost / Hr.FY2027 Total
x25 Hrs=$0.00
FY2028 Labor cost / Hr.FY2028 Total
x25 Hrs=$0.00
FY2029 Labor cost / Hr.FY2029 Total
x25 Hrs=$0.00
FY2030 Labor cost / Hr.FY2030 Total
x25 Hrs=$0.00
FY2031 Labor cost / Hr.FY2031 Total
5 Year cost including labor & Inspection Subsection total$0.00
MakeYearModel# of UnitsTRUCK H #Serial NumberGarage Location and Contact
DC BATES2019SST37NE1H341MJ190002Traffic - Signal Shop - Robert Mullen Tel # 271-2291
DC BATES2020SST37NE1H1377MJ200003TSMO - Concord Lee Savary Tel # 271-6862
DC BATES2020SST - 37NE1H387MJ200004Traffic - Signal Shop - Ryan Girardin Tel # 271-2294
Annual Safety Inspection (Flat Rate Charge)
+x3=$0.00
FY2027 inspection cost / ea.Filter Cost (current)FY2027 Total
+x3=$0.00
FY2028 inspection cost / ea.Filter Cost (current)FY2028 Total
+x3=$0.00
FY2029 inspection cost / ea.Filter Cost (current)FY2029 Total
+x3=$0.00
FY2030 inspection cost / ea.Filter Cost (current)FY2030 Total
+x3=$0.00
FY2031 inspection cost / ea.Filter Cost (current)FY2031 Total
Labor Per Hour For Repairs And Scheduled (* hours are estimated for bid basis only, actual hours will be invoiced )
x12 Hrs=$0.00
FY2027 Labor cost / Hr.FY2027 Total
x12 Hrs=$0.00
FY2028 Labor cost / Hr.FY2028 Total
x12 Hrs=$0.00
FY2029 Labor cost / Hr.FY2029 Total
x12 Hrs=$0.00
FY2030 Labor cost / Hr.FY2030 Total
x12 Hrs=$0.00
FY2031 Labor cost / Hr.FY2031 Total
5 Year cost including labor & Inspection Subsection total$0.00
MakeYearModel# of UnitsTRUCK H #Serial NumberGarage Location and Contact
Versalift2019TEL - 29-NE1H308AL190005Traffic-Sign- D-3 Crew Dave Nylen Tel # 271-2291
Versalift2019TEL - 29-NE1H314AL190004Traffic-Sign-D-4 Crew James Edmunds Tel # 271-2291
VERSALIFT2024TEL29NE1H354A1230004Traffic-Sign-D-1 Crew Russell Bell Tel # 419-0357
Annual Safety Inspection (Flat Rate Charge)
+x3=$0.00
FY2027 inspection cost / ea.Filter Cost (current)FY2027 Total
+x3=$0.00
FY2028 inspection cost / ea.Filter Cost (current)FY2028 Total
+x3=$0.00
FY2029 inspection cost / ea.Filter Cost (current)FY2029 Total
+x3=$0.00
FY2030 inspection cost / ea.Filter Cost (current)FY2030 Total
+x3=$0.00
FY2031 inspection cost / ea.Filter Cost (current)FY2031 Total
Labor Per Hour For Repairs And Scheduled (* hours are estimated for bid basis only, actual hours will be invoiced )
x12 Hrs=$0.00
FY2027 Labor cost / Hr.FY2027 Total
x12 Hrs=$0.00
FY2028 Labor cost / Hr.FY2028 Total
x12 Hrs=$0.00
FY2029 Labor cost / Hr.FY2029 Total
x12 Hrs=$0.00
FY2030 Labor cost / Hr.FY2030 Total
x12 Hrs=$0.00
FY2031 Labor cost / Hr.FY2031 Total
5 Year cost including labor & Inspection Subsection total$0.00
MakeYearModel# of UnitsTRUCK H #Serial NumberGarage Location and Contact
Versalift2016TEL - 29NE-031H1368AI080091Traffic-Sign-Concord Crew Kellen Jordan Tel # 271-8132
Annual Safety Inspection (Flat Rate Charge)
+x1=$0.00
FY2027 inspection cost / ea.Filter Cost (current)FY2027 Total
+x1=$0.00
FY2028 inspection cost / ea.Filter Cost (current)FY2028 Total
+x1=$0.00
FY2029 inspection cost / ea.Filter Cost (current)FY2029 Total
+x1=$0.00
FY2030 inspection cost / ea.Filter Cost (current)FY2030 Total
+x1=$0.00
FY2031 inspection cost / ea.Filter Cost (current)FY2031 Total
Labor Per Hour For Repairs And Scheduled (* hours are estimated for bid basis only, actual hours will be invoiced )
x10 Hrs=$0.00
FY2027 Labor cost / Hr.FY2027 Total
x10Hrs.=$0.00
FY2028 Labor cost / Hr.FY2028 Total
x10Hrs.=$0.00
FY2029 Labor cost / Hr.FY2029 Total
x10Hrs.=$0.00
FY2030 Labor cost / Hr.FY2030 Total
x10Hrs.=$0.00
FY2031 Labor cost / Hr.FY2031 Total
5 Year cost including labor & Inspection Subsection total$0.00
MakeYearModel# of UnitsTRUCK H #Serial NumberGarage Location and Contact
Versalift2007VST - 50001-011H1628GG070017Bridge Maint. - Portsmouth Louis Albert Tel # 271-3667
Annual Safety Inspection (Flat Rate Charge)
+x1=$0.00
FY2027 inspection cost / ea.Filter Cost (current)FY2027 Total
+x1=$0.00
FY2028 inspection cost / ea.Filter Cost (current)FY2028 Total
+x1=$0.00
FY2029 inspection cost / ea.Filter Cost (current)FY2029 Total
+x1=$0.00
FY2030 inspection cost / ea.Filter Cost (current)FY2030 Total
+x1=$0.00
FY2031 inspection cost / ea.Filter Cost (current)FY2031 Total
Labor Per Hour For Repairs And Scheduled (* hours are estimated for bid basis only, actual hours will be invoiced )
x7 Hrs=$0.00
FY2027 Labor cost / Hr.FY2027 Total
x7 Hrs=$0.00
FY2028 Labor cost / Hr.FY2028 Total
x7 Hrs=$0.00
FY2029 Labor cost / Hr.FY2029 Total
x7 Hrs=$0.00
FY2030 Labor cost / Hr.FY2030 Total
x7 Hrs=$0.00
FY2031 Labor cost / Hr.FY2031 Total
5 Year cost including labor & Inspection Subsection total$0.00
MakeYearModel# of UnitsTRUCK H #Serial NumberGarage Location and Contact
Utem2016UTLN-411H349UTLN32794Traffic-Signal-Crew Robert McCullan Tel # 271-2291
Utem2016UTLN-411H386UTLN32793Traffic - Signal Crew - Steven Leary Tel # 271-2294
Utem2016UTLN-411H1501UTLN32795Highway District 1- Jay Moyer Tel #
Utem2017UTLN-411H1504UTLN32888D-5 Hillsborough Shed - Robert Bennet - Tel # 666-3336
Utem2017UTLN-411H1489UTLN32889Turnpikes / Traffic - Michael Caron Tel # 485-3806
Annual Safety Inspection (Flat Rate Charge)
+x5=$0.00
FY2027 inspection cost / ea.Filter Cost (current)FY2027 Total
+x5=$0.00
FY2028 inspection cost / ea.Filter Cost (current)FY2028 Total
+x5=$0.00
FY2029 inspection cost / ea.Filter Cost (current)FY2029 Total
+x5=$0.00
FY2030 inspection cost / ea.Filter Cost (current)FY2030 Total
+x5=$0.00
FY2031 inspection cost / ea.Filter Cost (current)FY2031 Total
Labor Per Hour For Repairs And Scheduled (* hours are estimated for bid basis only, actual hours will be invoiced )
x7 Hrs=$0.00
FY2027 Labor cost / Hr.FY2027 Total
x7 Hrs=$0.00
FY2028 Labor cost / Hr.FY2028 Total
x7 Hrs=$0.00
FY2029 Labor cost / Hr.FY2029 Total
x7 Hrs=$0.00
FY2030 Labor cost / Hr.FY2030 Total
x7 Hrs=$0.00
FY2031 Labor cost / Hr.FY2031 Total
3 Year cost including labor & Inspection Subsection total$0.00
MakeYearModel# of UnitsTRUCK H #Serial NumberGarage Location and Contact
DUR-A-LIFT2018DTAS-38TS1H319A10758Traffic - Signal Shop - Tel # 229-7309
DUR-A-LIFT2018DTAS-38TS1H1503A10759District 6 - 604 Shed- John Clark Tel # 868-1133
DUR-A-LIFT2017DVS-291H1540A10073Bridge Design - Nathen Lewis - Tel #271-2731
Annual Safety Inspection (Flat Rate Charge)
+x3=$0.00
FY2027 inspection cost / ea.Filter Cost (current)FY2027 Total
+x3=$0.00
FY2028 inspection cost / ea.Filter Cost (current)FY2028 Total
+x3=$0.00
FY2029 inspection cost / ea.Filter Cost (current)FY2029 Total
+x3=$0.00
FY2030 inspection cost / ea.Filter Cost (current)FY2030 Total
+x3=$0.00
FY2031 inspection cost / ea.Filter Cost (current)FY2031 Total
Labor Per Hour For Repairs And Scheduled (* hours are estimated for bid basis only, actual hours will be invoiced )
x12 Hrs=$0.00
FY2027 Labor cost / Hr.FY2027 Total
x12 Hrs=$0.00
FY2028 Labor cost / Hr.FY2028 Total
x12 Hrs=$0.00
FY2029 Labor cost / Hr.FY2029 Total
x12 Hrs=$0.00
FY2030 Labor cost / Hr.FY2030 Total
x12 Hrs=$0.00
FY2031 Labor cost / Hr.FY2031 Total
5 Year cost including labor & Inspection Subsection total$0.00
MakeYearModel# of UnitsTRUCK H #Serial NumberGarage Location and Contact
UTV HERCULES202624K481H400H24K48-2506-C-852Bridge Maint. - Portsmouth Louis Albert Tel # 271-3667
Annual Safety Inspection (Flat Rate Charge)
+x1=$0.00
FY2027 inspection cost / ea.Filter Cost (current)FY2027 Total
+x1=$0.00
FY2028 inspection cost / ea.Filter Cost (current)FY2028 Total
+x1=$0.00
FY2029 inspection cost / ea.Filter Cost (current)FY2029 Total
+x1=$0.00
FY2030 inspection cost / ea.Filter Cost (current)FY2030 Total
+x1=$0.00
FY2031 inspection cost / ea.Filter Cost (current)FY2031 Total
Labor Per Hour For Repairs And Scheduled (* hours are estimated for bid basis only, actual hours will be invoiced )
x10 Hrs=$0.00
FY2027 Labor cost / Hr.FY2027 Total
x10 Hrs=$0.00
FY2028 Labor cost / Hr.FY2028 Total
x10 Hrs=$0.00
FY2029 Labor cost / Hr.FY2029 Total
x10 Hrs=$0.00
FY2030 Labor cost / Hr.FY2030 Total
x10 Hrs=$0.00
FY2031 Labor cost / Hr.FY2031 Total
5 Year cost including labor & Inspection Subsection total$0.00

&"-,Bold"&UEXHIBIT C - OFFER SECTION&U INVENTORY, INSPECTION COSTS AND HOURLY RATES (please complete green cells)&"-,Regular" &"-,Bold"&KFF0000RED UNITS BEING REPLACED DURING CONTRACT PERIOD; MAY BE UNDER OEM WARRANTY

Page &P Contractor Initials:____________ Date: ____________

File details come from the government source that posted it. Updated .